                 Jun 27/24 PionLT/KaonLT Analysis Meeting Notes
2
                 ----------------------------------------------
3
                                (Notes by GH)
4

    
5
                     Today: PionLT will be discussed first
6

    
7
Please remember to post your slides at:
8
https://redmine.jlab.org/projects/kltexp/wiki/Kaon_LT_Meetings
9

    
10
Present
11
-------
12
Regina - Muhammad Junaid, Ali Usman, Alicia Postuma, Nathan Heinrich,
13
   Vijay Kumar, Zach Sullivan, Garth Huber
14
JLab - Dave Gaskell
15
Ohio - Julie Roche
16
York - Stephen Kay
17
CUA - Tanja Horn
18
FIU - Pete Markowitz
19
UVA - Richard Trotta
20

    
21
Junaid
22
------
23
PionLT Offsets
24
- tested OOP offsets w/ opposite sign and rechecked Heep distributions, got
25
  worse for all energies
26
- all offset signs now finalized
27

    
28
- comparison of Data & MC distributions with offsets applied
29
  - delta, xptar, yptar, etc. for both spectrometers
30
  - overlap of distribution shapes looks pretty good
31

    
32
- preliminary Heep Coin Data/MC yield ratios
33
  - EffCharge = Tracking, DetEff, Hodo-3/4, EDTM corrections applied,
34
    LH2 boiling corr from Richard's analysis (8%/100uA, so ~4% correction)
35
  - *NB* some inconsistencies in MC to Data normalization seen from
36
    plot-to-plot, so plotting scripts need to be re-checked
37
  - *NB* need to check that W-cut is applied consistently to both Data and MC
38

    
39
Next steps:
40
- planning to do Pass-2 replays
41
  - data were not replayed yet w/offsets, also need to include new BCM calibs
42

    
43
Nathan & Zach
44
-------------
45
PionLT Lumi Studies
46
- applied uncertainty in current based on BCM calib in terms of unc in slope
47
  and offset
48
  - *NB* still need to talk to Dave Mack re errors from BCM saturation, will
49
    look through DocDB if don't hear from DM within a week
50

    
51
- Rel Yield vs Current/Rate w/ BCM errors applied
52
  - Carbon runs 16727-16737
53
  - scaler yields have larger (more reasonable) errors now
54
  - *NB* BCM offset clearly needs some optimation, but things generally flat
55

    
56
- preliminary LH2 boiling study
57
  - LH2 seees about 4% boiling @ 80uA
58
  - will combine settings for a combined fit
59
  - *NB* Procedure to combine settings (from GH):
60
    - First do a fit of each setting study and normalize to unity at zero
61
      rate/current
62
    - Then overlay all of the normalized studies, and check for consistency
63
    - If consistent within errors, do a combined fit
64

    
65
Next steps:
66
- look at some 2021 Lumi studies, w/ PreScale correction
67
- Look at Coin Lumi settings
68

    
69
Richard
70
-------
71
KaonLT LTsep fitting
72
- Q2=5.5, Center Setting only, MMk cut and pion subtraction applied
73
- fitting sigL=(p1+p2*log(Q2))exp(p3*|t|) and sigT=(p4*|t|/Q2-1)*exp(p6*|t|)
74
- result of 1st iteration: Data/MC ratio ~0.7 @ -t=0.465, ~0.5 @ 0.590
75
- did 31 iterations, but ratios did not change, something wrong
76
  - GH: *NB* it's really important that the fit for new model parameters
77
    converges, otherwise you can't consider it as an iteration
78
    - this appears to be the reason why the ratios did not improve
79

    
80
- meeting coming up w/ Vijay, Ali to discuss proton absorption correction, and
81
  rad on/off systematic studies
82

    
83
Alicia
84
------
85
Overview of latest updates to BSA paper after comments from this group
86
- got rid of 2 planes figure to save some space
87
- for the Q2-xB plot, can move symbol legend from caption to inside the figure
88
  to save some space
89
  - *NB* GH can do this after he gets home
90

    
91
- will circulate the manuscript to all co-authors later today
92
  - comments will be due July 16, the day after Alicia's presentation at Hall
93
    A/C workshop
94

    
95
Ali
96
---
97
HMS Cherenkov efficiencies
98
- to recall, the KaonLT efficiency (~97%) is noticeably lower than in PionLT,
99
  what is the reason for this?
100
- looked up HMS Cherenkov efficiency study in Bircu's thesis, p.115
101
  - plotted CerEff and pion Rejection Factor for different NPE cut
102
  - had a similar Efficiency to Ali's KaonLT study, ~2-3% inefficiency
103
- Looked up hclog where the light leak was fixed:
104
  https://logbooks.jlab.org/entry/3854383
105
  Oct 7/2020 entry by Chuck Mahlong
106
- believe the light leak started when broken mirror was fixed in early 2018,
107
  before KaonLT started
108
  - this means all of KaonLT and summer 2019 PionLT data have the light leak
109
    inefficiency
110

    
111
- conclusion: we understand the reason why the KaonLT and PionLT inefficiencies
112
  are so much different and hence can assign a smaller systematic uncertainty
113

    
114
Vijay
115
-----
116
Summer 2019 PionLT systematic uncertainty studies
117
- added variations in LT, TT for RadCor on/off and MM cuts to spreadsheet
118
- *NB* LT, TT got larger for RadCor on/off, so we have to consider whether to
119
  assign a 1-sided uncertainty, similar to what Alicia needed to do for BSA
120
- relative uncertainties show, better would be to tabulate the absolute
121
  uncertainties per t-bin
122

    
123
Next steps:
124
- looking at acceptance cut systematic uncertainty
125
  - applying +/-10% cut variation, same as in Tanja's thesis
126

    
127

    
128
 Next Meeting
129
-------------
130
* NOTE* we do not meet next week due to July 1 (Canada) and July 4 (USA)
131
  holidays
132
- Next meet: Thur July 11 @ 15:00 Eastern/13:00 Regina
133
  - KaonLT will go first
134

    
(461-461/513)