Actions
Feature #127
openFeature #126: GEM hit reconstruction
GEM signal deconvolution
Status:
New
Priority:
Normal
Assignee:
-
Category:
GEMs
Start date:
Due date:
% Done:
0%
Estimated time:
50.00 h
Responsible:
Description
Software implementation of GEM signal deconvolution. Might not be needed for production if this is actually implemented in firmware or only single samples are taken. It is probably easiest to support the different input data formats (N samples vs. 1 sample) in a single module. The operating mode could be auto-detected from the raw data products (number of samples).
The output should be calibrated pedestal-subtracted GEM readout strip data. This should be a separate data product so that the clustering algorithm (see #103) can be freely configured.
Actions