Project

General

Profile

Actions

Task #310

open

Task #308: Elastic Transport

Vacuum Through Septum

Added by Seamus Riordan about 6 years ago. Updated about 6 years ago.

Status:
New
Priority:
Normal
Assignee:
-
Start date:
12/04/2017
Due date:
10/17/2018 (over 5 years late)
% Done:

50%

Estimated time:
(Total: 0.00 h)

Subtasks 4 (4 open0 closed)

Task #326: Vacuum Through Septum CalculationResolved12/04/201702/01/2018

Actions
Task #327: Vacuum Transport EngineeringResolvedRobin Wines02/02/201802/22/2018

Actions
Task #328: Vacuum Transport Post-fit EngineeringNewRobin Wines08/07/201808/21/2018

Actions
Support #329: Vacuum Transport FabricationNew08/22/201810/17/2018

Actions

No data to display

Actions

Also available in: Atom PDF