Project

General

Profile

Actions

Task #735

open

DIS cross section

Added by Alexandre Camsonne 12 months ago. Updated 4 days ago.

Status:
In Progress
Priority:
High
Assignee:
Start date:
05/17/2023
Due date:
% Done:

70%

Estimated time:

Files

Update Feb 29 2024 (DIS Yield).pptx (948 KB) Update Feb 29 2024 (DIS Yield).pptx Mark Mathison, 03/04/2024 10:54 AM
Update Feb 29 2024 (DIS Yield).pdf (847 KB) Update Feb 29 2024 (DIS Yield).pdf Mark Mathison, 03/21/2024 10:53 AM
x60_2_LD2_ratios.pdf (38.2 KB) x60_2_LD2_ratios.pdf Mark Mathison, 04/15/2024 10:22 AM
x60_2_LH2_ratios_test.pdf (35.8 KB) x60_2_LH2_ratios_test.pdf Mark Mathison, 04/15/2024 10:22 AM
x60_2_LD2_ratios.pdf (38.5 KB) x60_2_LD2_ratios.pdf No dummy subtraction Mark Mathison, 04/22/2024 11:05 AM
x60_2_LH2_ratios.pdf (38.8 KB) x60_2_LH2_ratios.pdf No dummy subtraction Mark Mathison, 04/22/2024 11:05 AM
x60_4_LD2_ratios.pdf (39.8 KB) x60_4_LD2_ratios.pdf Dummy subtracted Mark Mathison, 04/22/2024 11:05 AM
x60_4_LH2_ratios.pdf (40.4 KB) x60_4_LH2_ratios.pdf Dummy subtracted Mark Mathison, 04/22/2024 11:05 AM
x60_4_LH2_ratios_wall.pdf (40.4 KB) x60_4_LH2_ratios_wall.pdf Dummy subtracted, test using LH2 target exit wall thickness instead of tip thickness Mark Mathison, 04/22/2024 11:05 AM
Actions #1

Updated by Alexandre Camsonne 11 months ago

  • Assignee set to Zheng Huang
Actions #2

Updated by Alexandre Camsonne 10 months ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 50
Actions #3

Updated by Alexandre Camsonne 10 months ago

  • % Done changed from 50 to 70

At cross section extration script part of the script

Actions #4

Updated by Alexandre Camsonne 9 months ago

DIS crossection plot without error bars

need units and compare with DIS crossection

Actions #5

Updated by Alexandre Camsonne 5 months ago

  • Priority changed from Normal to High
Actions #6

Updated by Casey Morean 5 months ago

  • Assignee changed from Zheng Huang to Casey Morean
Actions #7

Updated by Alexandre Camsonne 3 months ago

  • Assignee changed from Casey Morean to Mark Mathison
Actions #8

Updated by Mark Mathison about 2 months ago

Preliminary DIS yields for HMS trigger runs Dec 2023 to Feb 2024

Actions #10

Updated by Mark Mathison 11 days ago

First pass of ratios of DIS yield from data to yield from MC simulation for kinematic x60_2. No dummy subtraction yet.

Actions #11

Updated by Mark Mathison 4 days ago

Fixed plots for x60_2, preliminary results for x60_4 with dummy subtraction.

The analysis script I'm using has an option to automatically scale plots to the same height, possibly to compare the shape of the distribution between the MC and the data. This option was selected when I ran the analysis before, so I turned it off, and now the ratios between the plots on a setting are more consistent. Attached corrected plots for x60_2, LH2 and LD2 (no dummy subtraction).

I've also run the analysis for x60_4 on LH2 and LD2. This kinematic was primarily run on ps4, so we had dummy runs on ps4 and I was able to do the dummy subtraction for this kinematic.

Plots show that the yield for LH2 is substantially lower than expected, and there's an odd Ytar distribution, even with dummy subtraction.

There's also a note in the target survey from the beginning of the experiment that the thickness of the exit wall for the LH2 target is about 20% thicker than the thickness of the target exit at the tip. So, I ran the analysis for LH2 at kinematic x60_4 compensating for this effect (x60_4_LH2_ratios_wall.pdf). The Ytar distribution here shows a ripple at the downstream (positive) end of the target and dips slightly into the negative, which indicates that using the wall thickness instead of the tip thickness is probably an oversubtraction.

Actions

Also available in: Atom PDF