Project

General

Profile

2021 Run Plans and Run Sheets » History » Version 13

Garth Huber, 09/01/2021 04:10 PM

1 2 Garth Huber
h1. Fall 2021 Run Plans and Run Sheets
2
3
* Blank Run Sheets
4 13 Garth Huber
** New Configuration Sheet       
5
*** (PDF) attachment:runsheet_pion21.tgif.pdf
6
*** (PS) attachment:runsheet_pion21.tgif.ps
7
** Continuing Configuration Sheet
8
*** (PDF) attachment:runsheet2_pion21.tgif.pdf
9
*** (PS) attachment:runsheet_pion21.tgif.ps
10 2 Garth Huber
11 8 Garth Huber
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21aug31.ods
12 2 Garth Huber
13
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf
14
* Beam pipe requirements attachment:beampipe_req.pdf
15 3 Garth Huber
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
16 2 Garth Huber
17
h2. 9.2 GeV Beam
18
19
* Run Plan attachment:runplan_9p2gev.pdf 
20
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
21
* 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv
22
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods
23
24
h3. 9.2 GeV Run sheets
25
26
** Heep attachment:heep_9p2.pdf
27
** Luminosity scan attachment:lumi_9p2.pdf
28
** Physics runs attachment:physics_9p2_loweps.pdf
29
30 10 Garth Huber
h2. 8.0 GeV Beam (to be posted in October)
31 2 Garth Huber
32
* Run Plan attachment:runplan_8p0gev.pdf 
33
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
34
* 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
35
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods
36
37
h3. 8.0 GeV Run sheets
38
39
** Heep attachment:heep_8p0.pdf
40
** Luminosity scan attachment:lumi_8p0.pdf
41
** Physics runs attachment:physics_8p0_loweps.pdf
42
43 10 Garth Huber
h2. 9.9 GeV Beam (to be posted in October)
44 2 Garth Huber
45
* Run Plan attachment:runplan_9p9gev.pdf 
46
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
47
* 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
48
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods
49
50
h3. 9.9 GeV Run sheets
51
52
** Heep attachment:heep_9p9.pdf
53
** Luminosity scan attachment:lumi_9p9.pdf
54
** Physics runs attachment:physics_9p9_loweps.pdf
55
56 10 Garth Huber
h2. 6.0 GeV Beam (to be posted in October)
57 2 Garth Huber
58
* Run Plan attachment:runplan_6p0gev.pdf 
59
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
60
* 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
61
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods
62
63
h3. 6.0 GeV Run sheets
64
65
** Heep attachment:heep_6p0.pdf
66
** Physics runs attachment:physics_6p0_loweps.pdf