2021 Run Plans and Run Sheets » History » Revision 14
Revision 13 (Garth Huber, 09/01/2021 04:10 PM) → Revision 14/53 (Garth Huber, 09/09/2021 10:33 PM)
h1. Fall 2021 Run Plans and Run Sheets * Blank Run Sheets ** New Configuration Sheet *** (PDF) attachment:runsheet_pion21.tgif.pdf *** (PS) attachment:runsheet_pion21.tgif.ps ** Continuing Configuration Sheet *** (PDF) attachment:runsheet2_pion21.tgif.pdf *** (PS) attachment:runsheet_pion21.tgif.ps * Run Plan Spread Sheet attachment:pion_loweps_runplan_21aug31.ods * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf * Beam pipe requirements attachment:beampipe_req.pdf * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf h2. 9.2 GeV Beam * Run Plan attachment:runplan_9p2gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf * 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods h3. 9.2 GeV Run sheets ** Heep attachment:heep_9p2.pdf ** Luminosity scan attachment:lumi_9p2.pdf ** Physics runs attachment:physics_9p2_loweps.pdf h2. 8.0 GeV Beam (to be posted in October) * Run Plan attachment:runplan_8p0gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods h3. 8.0 GeV Run sheets ** Heep attachment:heep_8p0.pdf ** Luminosity scan attachment:lumi_8p0.pdf ** Physics runs attachment:physics_8p0_loweps.pdf h2. 9.9 GeV Beam (to be posted in October) * Run Plan attachment:runplan_9p9gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods h3. 9.9 GeV Run sheets ** Heep attachment:heep_9p9.pdf ** Luminosity scan attachment:lumi_9p9.pdf ** Physics runs attachment:physics_9p9_loweps.pdf h2. 6.0 GeV Beam (to be posted in October) * Run Plan attachment:runplan_6p0gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods h3. 6.0 GeV Run sheets ** Heep attachment:heep_6p0.pdf ** Physics runs attachment:physics_6p0_loweps.pdf