h1. Fall 2021 Run Plans and Run Sheets
2
3
* Blank Run Sheets
4 14 Garth Huber
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
5
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
6 2 Garth Huber
7 15 Garth Huber
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep10.ods
8 2 Garth Huber
9
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf
10
* Beam pipe requirements attachment:beampipe_req.pdf
11 3 Garth Huber
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
12 2 Garth Huber
13
h2. 9.2 GeV Beam
14
15
* Run Plan attachment:runplan_9p2gev.pdf 
16
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
17
* 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv
18
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods
19
20
h3. 9.2 GeV Run sheets
21
22 16 Garth Huber
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
23
** Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q21p60_w3p08.pdf
24
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
25
** Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q26p00_w3p19.pdf
26
** Physics Q2=1.60, W=3.08 attachment:physics_9p2gev_q28p50_w2p79.pdf
27 2 Garth Huber
28 10 Garth Huber
h2. 8.0 GeV Beam (to be posted in October)
29 2 Garth Huber
30
* Run Plan attachment:runplan_8p0gev.pdf 
31
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
32
* 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
33
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods
34
35
h3. 8.0 GeV Run sheets
36
37
** Heep attachment:heep_8p0.pdf
38
** Luminosity scan attachment:lumi_8p0.pdf
39
** Physics runs attachment:physics_8p0_loweps.pdf
40
41 10 Garth Huber
h2. 9.9 GeV Beam (to be posted in October)
42 2 Garth Huber
43
* Run Plan attachment:runplan_9p9gev.pdf 
44
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
45
* 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
46
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods
47
48
h3. 9.9 GeV Run sheets
49
50
** Heep attachment:heep_9p9.pdf
51
** Luminosity scan attachment:lumi_9p9.pdf
52
** Physics runs attachment:physics_9p9_loweps.pdf
53
54 10 Garth Huber
h2. 6.0 GeV Beam (to be posted in October)
55 2 Garth Huber
56
* Run Plan attachment:runplan_6p0gev.pdf 
57
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
58
* 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
59
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods
60
61
h3. 6.0 GeV Run sheets
62
63
** Heep attachment:heep_6p0.pdf
64
** Physics runs attachment:physics_6p0_loweps.pdf