2021 Run Plans and Run Sheets » History » Version 2
Garth Huber, 07/07/2021 03:14 PM
1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
---|---|---|---|
2 | |||
3 | * Blank Run Sheets |
||
4 | ** New Configuration Sheet attachment:runsheet_pion.tgif.pdf |
||
5 | ** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf |
||
6 | |||
7 | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21jul05.ods |
||
8 | |||
9 | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf |
||
10 | * Beam pipe requirements attachment:beampipe_req.pdf |
||
11 | |||
12 | h2. 9.2 GeV Beam |
||
13 | |||
14 | * Run Plan attachment:runplan_9p2gev.pdf |
||
15 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
16 | * 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv |
||
17 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods |
||
18 | |||
19 | h3. 9.2 GeV Run sheets |
||
20 | |||
21 | ** Heep attachment:heep_9p2.pdf |
||
22 | ** Luminosity scan attachment:lumi_9p2.pdf |
||
23 | ** Physics runs attachment:physics_9p2_loweps.pdf |
||
24 | |||
25 | h2. 8.0 GeV Beam |
||
26 | |||
27 | * Run Plan attachment:runplan_8p0gev.pdf |
||
28 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
||
29 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
30 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods |
||
31 | |||
32 | h3. 8.0 GeV Run sheets |
||
33 | |||
34 | ** Heep attachment:heep_8p0.pdf |
||
35 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
36 | ** Physics runs attachment:physics_8p0_loweps.pdf |
||
37 | |||
38 | h2. 9.9 GeV Beam |
||
39 | |||
40 | * Run Plan attachment:runplan_9p9gev.pdf |
||
41 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
42 | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
||
43 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods |
||
44 | |||
45 | h3. 9.9 GeV Run sheets |
||
46 | |||
47 | ** Heep attachment:heep_9p9.pdf |
||
48 | ** Luminosity scan attachment:lumi_9p9.pdf |
||
49 | ** Physics runs attachment:physics_9p9_loweps.pdf |
||
50 | |||
51 | h2. 6.0 GeV Beam |
||
52 | |||
53 | * Run Plan attachment:runplan_6p0gev.pdf |
||
54 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
55 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
56 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods |
||
57 | |||
58 | h3. 6.0 GeV Run sheets |
||
59 | |||