Project

General

Profile

2021 Run Plans and Run Sheets » History » Revision 21

Revision 20 (Garth Huber, 09/26/2021 07:09 PM) → Revision 21/53 (Garth Huber, 09/26/2021 07:09 PM)

h1. Fall 2021 Run Plans and Run Sheets 

 * Blank Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps 
 ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps 

 * Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep26.ods 

 * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf 
 * Beam pipe requirements attachment:beampipe_req.pdf 
 * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf 

 h2. 9.2 GeV Beam 

 * Run Plan attachment:runplan_9p2gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf 
 * 9.2 GeV Run list attachment:runlist_pionLT_2021_9p2.csv 

 h3. 9.2 GeV Run sheets 

 ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf 
 ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf 
 ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf 
 ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p2gev_q26p00_w3p19.pdf 
 ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf 

 h2. Special 5.56 GeV Run Plan (in case 5-pass delivery can't continue) 

 * Run Plan attachment:runplan_5p56gev.pdf attachment:runplan_5p56.pdf 

 h2. 8.0 GeV Beam (to be posted in October) 

 * Run Plan attachment:runplan_8p0gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf 
 * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods 

 h3. 8.0 GeV Run sheets 

 ** Heep attachment:heep_8p0.pdf 
 ** Luminosity scan attachment:lumi_8p0.pdf 
 ** Physics runs attachment:physics_8p0_loweps.pdf 

 h2. 9.9 GeV Beam (to be posted in October) 

 * Run Plan attachment:runplan_9p9gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf 
 * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods 

 h3. 9.9 GeV Run sheets 

 ** Heep attachment:heep_9p9.pdf 
 ** Luminosity scan attachment:lumi_9p9.pdf 
 ** Physics runs attachment:physics_9p9_loweps.pdf 

 h2. 6.0 GeV Beam (to be posted in October) 

 * Run Plan attachment:runplan_6p0gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf 
 * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods 

 h3. 6.0 GeV Run sheets 

 ** Heep attachment:heep_6p0.pdf 
 ** Physics runs attachment:physics_6p0_loweps.pdf