h1. Fall 2021 Run Plans and Run Sheets
* Blank Run Sheets
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21sep26.ods
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf
* Beam pipe requirements attachment:beampipe_req.pdf
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
h2. 9.2 GeV Beam
* Run Plan attachment:runplan_9p2gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
* 9.2 GeV Run list attachment:runlist_pionLT_2021_9p2.csv
h3. 9.2 GeV Run sheets
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf
h2. Special 5.56 GeV Run Plan (in case 5-pass delivery can't continue)
* Run Plan attachment:runplan_5p56gev.pdf
h2. 8.0 GeV Beam (to be posted in October)
* Run Plan attachment:runplan_8p0gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf
* 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods
h3. 8.0 GeV Run sheets
** Heep attachment:heep_8p0.pdf
** Luminosity scan attachment:lumi_8p0.pdf
** Physics runs attachment:physics_8p0_loweps.pdf
h2. 9.9 GeV Beam (to be posted in October)
* Run Plan attachment:runplan_9p9gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
* 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods
h3. 9.9 GeV Run sheets
** Heep attachment:heep_9p9.pdf
** Luminosity scan attachment:lumi_9p9.pdf
** Physics runs attachment:physics_9p9_loweps.pdf
h2. 6.0 GeV Beam (to be posted in October)
* Run Plan attachment:runplan_6p0gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
* 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv
* Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods
h3. 6.0 GeV Run sheets
** Heep attachment:heep_6p0.pdf
** Physics runs attachment:physics_6p0_loweps.pdf