2021 Run Plans and Run Sheets » History » Version 3
Garth Huber, 07/07/2021 03:17 PM
| 1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
|---|---|---|---|
| 2 | |||
| 3 | * Blank Run Sheets |
||
| 4 | ** New Configuration Sheet attachment:runsheet_pion.tgif.pdf |
||
| 5 | ** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf |
||
| 6 | |||
| 7 | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21jul05.ods |
||
| 8 | |||
| 9 | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf |
||
| 10 | * Beam pipe requirements attachment:beampipe_req.pdf |
||
| 11 | 3 | Garth Huber | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
| 12 | 2 | Garth Huber | |
| 13 | h2. 9.2 GeV Beam |
||
| 14 | |||
| 15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
| 16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
| 17 | * 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv |
||
| 18 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods |
||
| 19 | |||
| 20 | h3. 9.2 GeV Run sheets |
||
| 21 | |||
| 22 | ** Heep attachment:heep_9p2.pdf |
||
| 23 | ** Luminosity scan attachment:lumi_9p2.pdf |
||
| 24 | ** Physics runs attachment:physics_9p2_loweps.pdf |
||
| 25 | |||
| 26 | h2. 8.0 GeV Beam |
||
| 27 | |||
| 28 | * Run Plan attachment:runplan_8p0gev.pdf |
||
| 29 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
||
| 30 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
| 31 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods |
||
| 32 | |||
| 33 | h3. 8.0 GeV Run sheets |
||
| 34 | |||
| 35 | ** Heep attachment:heep_8p0.pdf |
||
| 36 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
| 37 | ** Physics runs attachment:physics_8p0_loweps.pdf |
||
| 38 | |||
| 39 | h2. 9.9 GeV Beam |
||
| 40 | |||
| 41 | * Run Plan attachment:runplan_9p9gev.pdf |
||
| 42 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
| 43 | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
||
| 44 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods |
||
| 45 | |||
| 46 | h3. 9.9 GeV Run sheets |
||
| 47 | |||
| 48 | ** Heep attachment:heep_9p9.pdf |
||
| 49 | ** Luminosity scan attachment:lumi_9p9.pdf |
||
| 50 | ** Physics runs attachment:physics_9p9_loweps.pdf |
||
| 51 | |||
| 52 | h2. 6.0 GeV Beam |
||
| 53 | |||
| 54 | * Run Plan attachment:runplan_6p0gev.pdf |
||
| 55 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
| 56 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
| 57 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods |
||
| 58 | |||
| 59 | h3. 6.0 GeV Run sheets |
||
| 60 | |||
| 61 | ** Heep attachment:heep_6p0.pdf |
||
| 62 | ** Physics runs attachment:physics_6p0_loweps.pdf |