2021 Run Plans and Run Sheets » History » Revision 32
Revision 31 (Garth Huber, 11/10/2021 11:20 AM) → Revision 32/53 (Garth Huber, 11/10/2021 11:21 AM)
h1. Fall 2021 Run Plans and Run Sheets * Blank Run Sheets ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps * Run Plan Spread Sheet attachment:pion_loweps_runplan_21oct28.ods * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf * Beam pipe requirements attachment:beampipe_req.pdf * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf h2. 9.2 GeV Beam * Run Plan attachment:runplan_9p2gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf * 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv h3. 9.2 GeV Run sheets ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf h2. 6.0 GeV Beam * Run Plan attachment:runplan_6p0gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf * 6.0 GeV Run list attachment:runlist_pionLT_2021_Eb_5p985.csv attachment:runlist_pionLT_2021_Eb_5p985gev.csv h3. 6.0 GeV Run sheets ** All runs attachment:runsheets_6p0gev.pdf h2. 9.9 GeV Beam * Run Plan attachment:runplan_9p9gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv h3. 9.9 GeV Run sheets ** Heep attachment:heep_9p9.pdf ** Luminosity scan attachment:lumi_9p9.pdf ** Physics runs attachment:physics_9p9_loweps.pdf h2. 8.0 GeV Beam * Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf * Run Plan Part 2 (January) attachment:runplan_8p0gev-2.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv h3. 8.0 GeV Run sheets ** Heep attachment:heep_8p0.pdf ** Luminosity scan attachment:lumi_8p0.pdf ** Physics runs attachment:physics_8p0_loweps.pdf