h1. Fall 2021 Run Plans and Run Sheets 

 * Blank Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps 
 ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps 

 * Run Plan Spread Sheet attachment:pion_loweps_runplan_21oct28.ods 

 * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf    attachment:20211004_JLab_ExpSch.pdf 
 * Beam pipe requirements attachment:beampipe_req.pdf 
 * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf 

 h2. 9.2 GeV Beam 

 * Run Plan attachment:runplan_9p2gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf 
 * 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv  

 h3. 9.2 GeV Run sheets 

 ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf 
 ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf 
 ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf 
 ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf 
 ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf 
 ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf 

 h2. 6.0 GeV Beam 

 * Run Plan attachment:runplan_6p0gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf 
 * 6.0 GeV Run list attachment:runlist_pionLT_2021_Eb_5p985.csv 

 h3. 6.0 GeV Run sheets    attachment:runsheets_6p0gev.pdf 

 h2. 9.9 GeV Beam 

 * Run Plan attachment:runplan_9p9gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf 
 * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv 

 h3. 9.9 GeV Run sheets    attachment:runsheets_9p9gev.pdf 

 h2. 8.0 GeV Beam 

 * Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf 
 * Run Plan Part 2 (Jan/Feb) (January) attachment:runplan_8p0gev-2.pdf  
 * Scanned run plan Dec (with shift worker and RC notes) attachment:runplan_8p0gev-1_scan.pdf attachment:runplan_8p0gev_scan.pdf 
 * Scanned run plan Jan/Feb (with shift worker and RC notes) attachment:runplan_8p0gev-2_scan.pdf 
 * 8.0 GeV Run list (December) attachment:pionlt_runlist_8p0-1.csv 
 * 8.0 GeV Run list (Jan/Feb) attachment:pionlt_runlist_8p0-2.csv attachment:pionlt_runlist_8p0.csv 

 h3. 8.0 GeV Run sheets 

 ** Physics #1 LD- attachment:runsheets_8p0gev_LD-.pdf Heep attachment:heep_8p0.pdf 
 ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf Luminosity scan attachment:lumi_8p0.pdf 
 ** Physics #2 LH+ LD+ (December) attachment:runsheets_8p0gev-2dec.pdf 
 ** Physics #3 LH+ LD+ (Jan/Feb) attachment:runsheets_8p0gev-3jan.pdf 
 ** Calibrations #2 (Heep-Coin, fADC Deadtime, Delta scan) attachment:runsheets_8p0gev_calib2.pdf 




 runs attachment:physics_8p0_loweps.pdf