2021 Run Plans and Run Sheets » History » Revision 44
Revision 43 (Garth Huber, 12/15/2021 05:46 PM) → Revision 44/53 (Garth Huber, 12/15/2021 05:49 PM)
h1. Fall 2021 Run Plans and Run Sheets
* Blank Run Sheets
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
* Run Plan Spread Sheet attachment:pion_loweps_runplan_21dec20.ods
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf attachment:20211122_JLab_ExpSch.pdf
* Beam pipe requirements attachment:beampipe_req.pdf
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
h2. 9.2 GeV Beam
* Run Plan attachment:runplan_9p2gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
* 9.2 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv
h3. 9.2 GeV Run sheets
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf
h2. 6.0 GeV Beam
* Run Plan attachment:runplan_6p0gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf
* 6.0 GeV Run list attachment:runlist_pionLT_2021_Eb_5p985.csv
h3. 6.0 GeV Run sheets attachment:runsheets_6p0gev.pdf
h2. 9.9 GeV Beam
* Run Plan attachment:runplan_9p9gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
* 9.9 GeV Run list attachment:runlist_pionLT_2021_Eb_9p876.csv
h3. 9.9 GeV Run sheets
** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf
** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf
** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf
** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf
h2. 8.0 GeV Beam
* Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf
* Run Plan Part 2 (Jan/Feb) attachment:runplan_8p0gev-2.pdf
* Scanned run plan (December) (with shift worker and RC notes) attachment:runplan_8p0gev-1_scan.pdf
* Scanned run plan (Jan/Feb) (with shift worker and RC notes) attachment:runplan_8p0gev-2_scan.pdf
* Special EDTM study w/ Cosmics attachment:Runplan_EDTM_21dec01.pdf
* 8.0 GeV Run list (December) attachment:runlist_pionLT_2021_Eb_7p937-1.csv
* 8.0 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937-2.csv
h3. 8.0 GeV Run sheets
** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf
** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf
** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf
** Physics #3 pi+ (Jan/Feb) attachment:runsheets_8p0gev-3_piplus.pdf
** Calibrations #2 (Heep-Coin, fADC Deadtime, Delta scan, Lumi) attachment:runsheets_8p0gev_calib2.pdf
** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf