2021 Run Plans and Run Sheets » History » Version 5
Garth Huber, 07/21/2021 02:45 PM
1 | 2 | Garth Huber | h1. Fall 2021 Run Plans and Run Sheets |
---|---|---|---|
2 | |||
3 | * Blank Run Sheets |
||
4 | 4 | Garth Huber | ** New Configuration Sheet attachment:runsheet_pion21.tgif.pdf |
5 | ** Continuing Configuration Sheet attachment:runsheet2_pion21.tgif.pdf |
||
6 | 2 | Garth Huber | |
7 | 5 | Garth Huber | * Run Plan Spread Sheet attachment:pion_loweps_runplan_21jul20.ods |
8 | 2 | Garth Huber | |
9 | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf |
||
10 | * Beam pipe requirements attachment:beampipe_req.pdf |
||
11 | 3 | Garth Huber | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
12 | 2 | Garth Huber | |
13 | h2. 9.2 GeV Beam |
||
14 | |||
15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
17 | * 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv |
||
18 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods |
||
19 | |||
20 | h3. 9.2 GeV Run sheets |
||
21 | |||
22 | ** Heep attachment:heep_9p2.pdf |
||
23 | ** Luminosity scan attachment:lumi_9p2.pdf |
||
24 | ** Physics runs attachment:physics_9p2_loweps.pdf |
||
25 | |||
26 | h2. 8.0 GeV Beam |
||
27 | |||
28 | * Run Plan attachment:runplan_8p0gev.pdf |
||
29 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf |
||
30 | * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv |
||
31 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods |
||
32 | |||
33 | h3. 8.0 GeV Run sheets |
||
34 | |||
35 | ** Heep attachment:heep_8p0.pdf |
||
36 | ** Luminosity scan attachment:lumi_8p0.pdf |
||
37 | ** Physics runs attachment:physics_8p0_loweps.pdf |
||
38 | |||
39 | h2. 9.9 GeV Beam |
||
40 | |||
41 | * Run Plan attachment:runplan_9p9gev.pdf |
||
42 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
43 | * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv |
||
44 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods |
||
45 | |||
46 | h3. 9.9 GeV Run sheets |
||
47 | |||
48 | ** Heep attachment:heep_9p9.pdf |
||
49 | ** Luminosity scan attachment:lumi_9p9.pdf |
||
50 | ** Physics runs attachment:physics_9p9_loweps.pdf |
||
51 | |||
52 | h2. 6.0 GeV Beam |
||
53 | |||
54 | * Run Plan attachment:runplan_6p0gev.pdf |
||
55 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf |
||
56 | * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv |
||
57 | * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods |
||
58 | |||
59 | h3. 6.0 GeV Run sheets |
||
60 | |||
61 | ** Heep attachment:heep_6p0.pdf |
||
62 | ** Physics runs attachment:physics_6p0_loweps.pdf |