Project

General

Profile

2021 Run Plans and Run Sheets » History » Revision 6

Revision 5 (Garth Huber, 07/21/2021 02:45 PM) → Revision 6/53 (Garth Huber, 08/11/2021 06:47 PM)

h1. Fall 2021 Run Plans and Run Sheets 

 * Blank Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion21.tgif.pdf 
 ** Continuing Configuration Sheet attachment:runsheet2_pion21.tgif.pdf 

 * Run Plan Spread Sheet attachment:pion_loweps_runplan_21aug11.ods attachment:pion_loweps_runplan_21jul20.ods 

 * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf 
 * Beam pipe requirements attachment:beampipe_req.pdf 
 * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf 

 h2. 9.2 GeV Beam 

 * Run Plan attachment:runplan_9p2gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf 
 * 9.2 GeV Run list attachment:pionlt_runlist_9p2.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p2.ods 

 h3. 9.2 GeV Run sheets 

 ** Heep attachment:heep_9p2.pdf 
 ** Luminosity scan attachment:lumi_9p2.pdf 
 ** Physics runs attachment:physics_9p2_loweps.pdf 

 h2. 8.0 GeV Beam 

 * Run Plan attachment:runplan_8p0gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_8p0gev_scan.pdf 
 * 8.0 GeV Run list attachment:pionlt_runlist_8p0.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_8p0.ods 

 h3. 8.0 GeV Run sheets 

 ** Heep attachment:heep_8p0.pdf 
 ** Luminosity scan attachment:lumi_8p0.pdf 
 ** Physics runs attachment:physics_8p0_loweps.pdf 

 h2. 9.9 GeV Beam 

 * Run Plan attachment:runplan_9p9gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf 
 * 9.9 GeV Run list attachment:pionlt_runlist_9p9.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_9p9.ods 

 h3. 9.9 GeV Run sheets 

 ** Heep attachment:heep_9p9.pdf 
 ** Luminosity scan attachment:lumi_9p9.pdf 
 ** Physics runs attachment:physics_9p9_loweps.pdf 

 h2. 6.0 GeV Beam 

 * Run Plan attachment:runplan_6p0gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p0gev_scan.pdf 
 * 9.9 GeV Run list attachment:pionlt_runlist_6p0.csv 
 * Pion-LT Charge and Time Spreadsheet attachment:PionLT_PhysicsSettings_6p0.ods 

 h3. 6.0 GeV Run sheets 

 ** Heep attachment:heep_6p0.pdf 
 ** Physics runs attachment:physics_6p0_loweps.pdf