2022 Run Plans and Run Sheets » History » Revision 15
Revision 14 (Jacob Murphy, 06/06/2022 04:19 PM) → Revision 15/77 (Jacob Murphy, 06/08/2022 12:05 AM)
h1. Summer 2022 Run Plans and Run Sheets * Blank Run Sheets ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps * Run Plan Spread Sheet attachment:pion_hieps_runplan_22May26.ods * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf attachment:20211122_JLab_ExpSch.pdf * Beam pipe requirements attachment:beampipe_req.pdf * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf h2. 10.6 GeV Beam * Run Plan attachment:10_56_GeV_Runplan.pdf * Scanned run plan (with shift worker and RC notes) attachment: * 10.6 GeV Run list attachment: * 10.6 GeV Run list (formatted) attachment: h3. 10.6 GeV Run sheets ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf h2. 8.5 GeV Beam * Run Plan attachment:runplan_8p487GeV.pdf * Scanned run plan (with shift worker and RC notes) attachment: * 8.5 GeV Run list attachment: * 8.5 GeV Run list (formatted) attachment: h3. 8.5 GeV Run sheets ** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf ** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf ** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf h2. 6.4 GeV Beam * Run Plan Part attachment:runplan_6p4gev.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p4gev_scan.pdf * 6.4 GeV Run list attachment:runlist_pionLT_2021_Eb_6p4.csv * 6.4 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_6p4.ods attachment:runlist_pionLT_2021_Eb_6p4.pdf h3. 6.4 GeV Run sheets ** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf ** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf ** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf ** Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf ** Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf ** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf ** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf