2022 Run Plans and Run Sheets » History » Version 24
  Garth Huber, 06/19/2022 07:02 AM 
  
| 1 | 1 | Jacob Murphy | h1. Summer 2022 Run Plans and Run Sheets  | 
|---|---|---|---|
| 2 | |||
| 3 | * Blank Run Sheets  | 
||
| 4 | ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps  | 
||
| 5 | 21 | Garth Huber | ** Continuing Configuration Sheet attachment:runsheet2_pion21.tgif.ps  | 
| 6 | 1 | Jacob Murphy | |
| 7 | 20 | Jacob Murphy | * Run Plan Spread Sheet attachment:pion_hieps_runplan_22June13.ods  | 
| 8 | 24 | Garth Huber | * JLab Beam Schedule attachment:20220610_JLab_ExpSch.pdf  | 
| 9 | 1 | Jacob Murphy | |
| 10 | 2 | Jacob Murphy | h2. 10.6 GeV Beam  | 
| 11 | 1 | Jacob Murphy | |
| 12 | 19 | Jacob Murphy | * Run Plan attachment:10_549_GeV_Runplan.pdf  | 
| 13 | 8 | Jacob Murphy | * Scanned run plan (with shift worker and RC notes) attachment:  | 
| 14 | * 10.6 GeV Run list attachment:  | 
||
| 15 | * 10.6 GeV Run list (formatted) attachment:  | 
||
| 16 | 1 | Jacob Murphy | |
| 17 | 2 | Jacob Murphy | h3. 10.6 GeV Run sheets  | 
| 18 | 1 | Jacob Murphy | |
| 19 | ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf  | 
||
| 20 | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf  | 
||
| 21 | ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf  | 
||
| 22 | ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf  | 
||
| 23 | ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf  | 
||
| 24 | ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf  | 
||
| 25 | |||
| 26 | 2 | Jacob Murphy | h2. 8.5 GeV Beam  | 
| 27 | 1 | Jacob Murphy | |
| 28 | 10 | Muhammad Junaid | * Run Plan attachment:runplan_8p487GeV.pdf  | 
| 29 | 12 | Muhammad Junaid | * Scanned run plan (with shift worker and RC notes) attachment:  | 
| 30 | 11 | Muhammad Junaid | * 8.5 GeV Run list attachment:  | 
| 31 | * 8.5 GeV Run list (formatted) attachment:  | 
||
| 32 | 1 | Jacob Murphy | |
| 33 | 2 | Jacob Murphy | h3. 8.5 GeV Run sheets  | 
| 34 | 1 | Jacob Murphy | |
| 35 | ** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf  | 
||
| 36 | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf  | 
||
| 37 | ** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf  | 
||
| 38 | ** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf  | 
||
| 39 | ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf  | 
||
| 40 | |||
| 41 | 2 | Jacob Murphy | h2. 6.4 GeV Beam  | 
| 42 | 1 | Jacob Murphy | |
| 43 | 7 | Nathan Heinrich | * Run Plan Part attachment:runplan_6p4gev.pdf  | 
| 44 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p4gev_scan.pdf  | 
||
| 45 | * 6.4 GeV Run list attachment:runlist_pionLT_2021_Eb_6p4.csv  | 
||
| 46 | * 6.4 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_6p4.ods attachment:runlist_pionLT_2021_Eb_6p4.pdf  | 
||
| 47 | 1 | Jacob Murphy | |
| 48 | 2 | Jacob Murphy | h3. 6.4 GeV Run sheets  | 
| 49 | 1 | Jacob Murphy | |
| 50 | ** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf  | 
||
| 51 | ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf  | 
||
| 52 | ** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf  | 
||
| 53 | ** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf  | 
||
| 54 | ** Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf  | 
||
| 55 | ** Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf  | 
||
| 56 | ** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf  | 
||
| 57 | ** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf  |