Project

General

Profile

2022 Run Plans and Run Sheets » History » Version 4

Jacob Murphy, 05/28/2022 05:40 PM

1 1 Jacob Murphy
h1. Summer 2022 Run Plans and Run Sheets
2
3
* Blank Run Sheets
4
** New Configuration Sheet attachment:runsheet_pion21.tgif.ps
5
** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps
6
7 4 Jacob Murphy
* Run Plan Spread Sheet attachment:pion_hiweps_runplan_22May26.ods
8 1 Jacob Murphy
9
* JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf  attachment:20211004_JLab_ExpSch.pdf  attachment:20211122_JLab_ExpSch.pdf
10
* Beam pipe requirements attachment:beampipe_req.pdf
11
* SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf
12
13 2 Jacob Murphy
h2. 10.6 GeV Beam
14 1 Jacob Murphy
15
* Run Plan attachment:runplan_9p2gev.pdf 
16
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf
17 3 Jacob Murphy
* 10.6 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv 
18
* 10.6 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p173.ods attachment:runlist_pionLT_2021_Eb_9p173.pdf
19 1 Jacob Murphy
20 2 Jacob Murphy
h3. 10.6 GeV Run sheets
21 1 Jacob Murphy
22
** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf
23
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf
24
** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf
25
** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf
26
** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf
27
** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf
28
29 2 Jacob Murphy
h2. 8.5 GeV Beam
30 1 Jacob Murphy
31
* Run Plan attachment:runplan_9p9gev.pdf 
32
* Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf
33 3 Jacob Murphy
* 8.5 GeV Run list attachment:runlist_pionLT_2021_Eb_9p876.csv
34
* 8.5 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p876.ods attachment:runlist_pionLT_2021_Eb_9p876.pdf
35 1 Jacob Murphy
36 2 Jacob Murphy
h3. 8.5 GeV Run sheets
37 1 Jacob Murphy
38
** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf
39
** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf
40
** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf
41
** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf
42
** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf
43
44 2 Jacob Murphy
h2. 6.4 GeV Beam
45 1 Jacob Murphy
46
* Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf
47
* Run Plan Part 2 (Jan/Feb) attachment:runplan_8p0gev-2.pdf 
48
* Scanned run plan (December) (with shift worker and RC notes) attachment:runplan_8p0gev-1_scan.pdf
49
* Scanned run plan (Jan/Feb) (with shift worker and RC notes) attachment:runplan_8p0gev-2_scan.pdf
50
* Special EDTM study w/ Cosmics attachment:Runplan_EDTM_21dec01.pdf
51 3 Jacob Murphy
* 6.4 GeV Run list (December) attachment:runlist_pionLT_2021_Eb_7p937_Part1.csv
52
* 6.4 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937_Part2.csv
53
* 6.4 GeV Run list (formatted--December) attachment:runlist_pionLT_2021_Eb_7p937_Part1.ods attachment:runlist_pionLT_2021_Eb_7p937_Part1.pdf
54
* 6.4 GeV Run list (formatted--Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937_Part2.ods attachment:runlist_pionLT_2021_Eb_7p937_Part2.pdf
55 1 Jacob Murphy
56 2 Jacob Murphy
h3. 6.4 GeV Run sheets
57 1 Jacob Murphy
58
** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf
59
** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf
60
** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf
61
** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf
62
** Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf
63
** Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf
64
** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf
65
** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf