Project

General

Profile

2022 Run Plans and Run Sheets » History » Revision 44

Revision 43 (Stephen Kay, 08/10/2022 01:30 AM) → Revision 44/77 (Muhammad Junaid, 08/10/2022 04:58 PM)

h1. Summer 2022 Run Plans and Run Sheets 

 * Blank Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps 
 ** Continuing Configuration Sheet attachment:runsheet2_pion21.tgif.ps 
 ** To print, use command lpr -# n runsheet.tgif.ps from the command line, where n is the number of copies desired  
 ** To view, use command gv from command line 
 * Run Plan Spread Sheet attachment:pion_hieps_runplan_22aug04.ods 
 * JLab Beam Schedule attachment:20220610_JLab_ExpSch.pdf attachment:20220724_JLab_ExpSch.pdf 

 h2. 10.6 GeV Beam 

 * Run Plan attachment:10_549_GeV_Runplan.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment: 
 * 10.6 GeV Run list attachment:runlist_pionLT_2022_Eb_10p549.csv 
 * 10.6 GeV Run list (formatted) attachment: 

 h3. 10.6 GeV Run sheets 

 ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf 
 ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf 
 ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf 
 ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf 
 ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf 
 ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf 

 

 h2. 8.5 GeV Beam 

 * Run Plan attachment:runplan_8p487GeV_v10.pdf attachment:runplan_8p487GeV_v9.pdf .pdf  
 * Scanned run plan (with shift worker and RC notes) attachment: 
 * 8.5 GeV Run list attachment: 
 * 8.5 GeV Run list (formatted) attachment: 

 h3. 8.5 GeV Run sheets 

 ** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf 
 ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf 
 ** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf 
 ** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf 
 ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf 

 

 h2. 6.4 GeV Beam 

 * Run Plan Part attachment:2022Runplan6p4GeV.pdf 
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p4gev_scan.pdf 
 * 6.4 GeV Run list attachment:runlist_pionLT_2021_Eb_6p4.csv 
 * 6.4 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_6p4.ods attachment:runlist_pionLT_2021_Eb_6p4.pdf 

 h3. 6.4 GeV Run sheets 

 ** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf 
 ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf 
 ** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf 
 ** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf 
 ** Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf 
 ** Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf 
 ** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf 
 ** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf