2022 Run Plans and Run Sheets » History » Revision 57
Revision 56 (Jacob Murphy, 08/14/2022 12:03 PM) → Revision 57/77 (Stephen Kay, 08/16/2022 11:28 AM)
h1. Summer 2022 Run Plans and Run Sheets * Blank Run Sheets ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps ** Continuing Configuration Sheet attachment:runsheet2_pion21.tgif.ps ** To print, use command lpr -# n runsheet.tgif.ps from the command line, where n is the number of copies desired ** To view, use command gv from command line * Run Plan Spread Sheet attachment:pion_hieps_runplan_22aug11.ods * JLab Beam Schedule attachment:20220610_JLab_ExpSch.pdf attachment:20220724_JLab_ExpSch.pdf h2. 10.6 GeV Beam * Run Plan attachment:10_549_GeV_Runplan.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_10p6gev_scan.pdf * 10.6 GeV Run list attachment:runlist_pionLT_2022_Eb_10p549.csv * 10.6 GeV Run list (formatted) attachment: h3. 10.6 GeV Run sheets ** Optics #1 (Sieve1,TriggerCheck) attachment:runsheets_10p6gev_Optics1.pdf ** Optics/HeepSing attachment:runsheets_10p6gev_OpticsHeep.pdf ** Special Heep (HMS 6 GeV/c) attachment:runsheets_10p6gev_Heep6HMS.pdf ** Heep Coin attachment:runsheets_10p6gev_HeepCoin.pdf ** Physics Q2=2.45, W=3.20 attachment:runsheets_10p6gev_q22p45_w3p20.pdf ** Physics Q2=2.73, W=2.63 attachment:runsheets_10p6gev_q22p73_w2p63.pdf ** Physics Q2=3.85, W=2.02 attachment:runsheets_10p6gev_q23p85_w2p02.pdf ** Physics Q2=3.85, W=2.62 attachment:runsheets_10p6gev_q23p85_w2p62.pdf attachment:runsheets_10p6gev_q23p85_w2p62_minus.pdf ** Physics Q2=3.85, W=3.07 attachment:runsheets_10p6gev_q23p85_w3p07.pdf attachment:runsheets_10p6gev_q23p85_w3p07_minus.pdf ** Physics Q2=5.00, W=2.95 attachment:runsheets_10p6gev_q25p00_w2p95.pdf ** Physics Q2=6.00, W=2.40 attachment:runsheets_10p6gev_q26p00_w2p40-1.pdf attachment:runsheets_10p6gev_q26p00_w2p40-2.pdf attachment:runsheets_10p6gev_q26p00_w2p40_minus.pdf ** Physics Q2=6.00, W=3.19 attachment:runsheets_10p6gev_q26p00_w3p19-1.pdf attachment:runsheets_10p6gev_q26p00_w3p19-2.pdf ** Physics Q2=8.50, W=2.79 attachment:runsheets_10p6gev_q28p50_w2p79.pdf h2. 8.5 GeV Beam * Run Plan attachment:runplan_8p487GeV_v11.pdf * Run Plan addendum for HeeP Singles and Optics attachment:8_GeV_Runplan_Adendum.pdf * Scanned run plan (with shift worker and RC notes) attachment: * 8.5 GeV Run list attachment:runlist_pionLT_2022_Eb_8p479.csv attachment: * 8.5 GeV Run list (formatted) attachment: h3. 8.5 GeV Run sheets ** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf ** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf ** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf h2. 6.4 GeV Beam * Run Plan Part attachment:2022Runplan6p4GeV.pdf * Scanned run plan (with shift worker and RC notes) attachment:runplan_6p4gev_scan.pdf * 6.4 GeV Run list attachment:runlist_pionLT_2021_Eb_6p4.csv * 6.4 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_6p4.ods attachment:runlist_pionLT_2021_Eb_6p4.pdf h3. 6.4 GeV Run sheets ** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf ** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf ** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf ** Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf ** Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf ** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf ** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf