2022 Run Plans and Run Sheets » History » Version 6
Jacob Murphy, 05/28/2022 05:42 PM
1 | 1 | Jacob Murphy | h1. Summer 2022 Run Plans and Run Sheets |
---|---|---|---|
2 | |||
3 | * Blank Run Sheets |
||
4 | ** New Configuration Sheet attachment:runsheet_pion21.tgif.ps |
||
5 | ** Continuing Configuration Sheet attachment:runsheet_pion21.tgif.ps |
||
6 | |||
7 | 6 | Jacob Murphy | * Run Plan Spread Sheet attachment:pion_hieps_runplan_22May26.ods |
8 | 1 | Jacob Murphy | |
9 | * JLab Beam Schedule attachment:20210316_JLab_ExpSch.pdf attachment:20211004_JLab_ExpSch.pdf attachment:20211122_JLab_ExpSch.pdf |
||
10 | * Beam pipe requirements attachment:beampipe_req.pdf |
||
11 | * SHMS small angle test 21-Jun-09 attachment:angle_test_21jun09.pdf |
||
12 | |||
13 | 2 | Jacob Murphy | h2. 10.6 GeV Beam |
14 | 1 | Jacob Murphy | |
15 | * Run Plan attachment:runplan_9p2gev.pdf |
||
16 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p2gev_scan.pdf |
||
17 | 3 | Jacob Murphy | * 10.6 GeV Run list attachment:runlist_pionLT_2021_Eb_9p173.csv |
18 | * 10.6 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p173.ods attachment:runlist_pionLT_2021_Eb_9p173.pdf |
||
19 | 1 | Jacob Murphy | |
20 | 2 | Jacob Murphy | h3. 10.6 GeV Run sheets |
21 | 1 | Jacob Murphy | |
22 | ** Calibrations #1 (Heep-Coin, Sieve1) attachment:runsheets_9p2gev_calib1.pdf |
||
23 | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p2gev_q21p60_w3p08.pdf |
||
24 | ** Calibrations #2 (Heep-Singles, Lumi, fADC Deadtime) attachment:runsheets_9p2gev_calib2.pdf |
||
25 | ** Physics Q2=6.00, W=3.19 LEFT attachment:runsheets_9p2gev_q26p00_w3p19_left.pdf |
||
26 | ** Physics Q2=6.00, W=3.19 CENTER attachment:runsheets_9p2gev_q26p00_w3p19_center.pdf |
||
27 | ** Physics Q2=8.50, W=2.79 attachment:runsheets_9p2gev_q28p50_w2p79.pdf |
||
28 | |||
29 | 2 | Jacob Murphy | h2. 8.5 GeV Beam |
30 | 1 | Jacob Murphy | |
31 | * Run Plan attachment:runplan_9p9gev.pdf |
||
32 | * Scanned run plan (with shift worker and RC notes) attachment:runplan_9p9gev_scan.pdf |
||
33 | 3 | Jacob Murphy | * 8.5 GeV Run list attachment:runlist_pionLT_2021_Eb_9p876.csv |
34 | * 8.5 GeV Run list (formatted) attachment:runlist_pionLT_2021_Eb_9p876.ods attachment:runlist_pionLT_2021_Eb_9p876.pdf |
||
35 | 1 | Jacob Murphy | |
36 | 2 | Jacob Murphy | h3. 8.5 GeV Run sheets |
37 | 1 | Jacob Murphy | |
38 | ** Calibrations (Heep-Singles, Coin) attachment:runsheets_9p9gev_calib.pdf |
||
39 | ** Physics Q2=1.60, W=3.08 attachment:runsheets_9p9gev_q21p60_w3p08.pdf |
||
40 | ** Physics Q2=3.85, W=3.07 attachment:runsheets_9p9gev_q23p85_w3p07.pdf |
||
41 | ** Physics Q2=5.00, W=2.95 attachment:runsheets_9p9gev_q25p00_w2p95.pdf |
||
42 | ** Physics Q2=6.00, W=3.19 attachment:runsheets_9p9gev_q26p00_w3p19.pdf |
||
43 | |||
44 | 2 | Jacob Murphy | h2. 6.4 GeV Beam |
45 | 1 | Jacob Murphy | |
46 | * Run Plan Part 1 (December) attachment:runplan_8p0gev-1.pdf |
||
47 | * Run Plan Part 2 (Jan/Feb) attachment:runplan_8p0gev-2.pdf |
||
48 | * Scanned run plan (December) (with shift worker and RC notes) attachment:runplan_8p0gev-1_scan.pdf |
||
49 | * Scanned run plan (Jan/Feb) (with shift worker and RC notes) attachment:runplan_8p0gev-2_scan.pdf |
||
50 | * Special EDTM study w/ Cosmics attachment:Runplan_EDTM_21dec01.pdf |
||
51 | 3 | Jacob Murphy | * 6.4 GeV Run list (December) attachment:runlist_pionLT_2021_Eb_7p937_Part1.csv |
52 | * 6.4 GeV Run list (Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937_Part2.csv |
||
53 | * 6.4 GeV Run list (formatted--December) attachment:runlist_pionLT_2021_Eb_7p937_Part1.ods attachment:runlist_pionLT_2021_Eb_7p937_Part1.pdf |
||
54 | * 6.4 GeV Run list (formatted--Jan/Feb) attachment:runlist_pionLT_2021_Eb_7p937_Part2.ods attachment:runlist_pionLT_2021_Eb_7p937_Part2.pdf |
||
55 | 1 | Jacob Murphy | |
56 | 2 | Jacob Murphy | h3. 6.4 GeV Run sheets |
57 | 1 | Jacob Murphy | |
58 | ** Physics #1 pi- (December) attachment:runsheets_8p0gev-1_piminus.pdf |
||
59 | ** Calibrations #1 (Heep-Singles, Lumi, EDTM) attachment:runsheets_8p0gev_calib1.pdf |
||
60 | ** Special EDTM study w/ Cosmics attachment:runsheets_EDTM_21dec01.pdf |
||
61 | ** Physics #2 pi+ (December) attachment:runsheets_8p0gev-2_piplus.pdf |
||
62 | ** Physics #3A pi+ (Jan/Feb) attachment:runsheets_8p0gev-3A_piplus.pdf |
||
63 | ** Physics #3B pi+ (Jan/Feb) attachment:runsheets_8p0gev-3B_piplus.pdf |
||
64 | ** Calibrations #2 (Heep-Coin, fADC Deadtime, Lumi) attachment:runsheets_8p0gev_calib2.pdf |
||
65 | ** Physics #4 pi- (Feb) attachment:runsheets_8p0gev-4_piminus.pdf |