Project

General

Profile

2019 Run Plans and Run Sheets » History » Revision 21

Revision 20 (Garth Huber, 07/06/2019 11:35 PM) → Revision 21/37 (Garth Huber, 07/13/2019 02:22 PM)

h1. Run Plans and Run Sheets 

 h2. Summer 2019 Run Period 

 * Blank Run Sheets 
 ** New Configuration Sheet attachment:runsheet_pion.tgif.pdf 
 ** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf 

 * Run Plans 
 ** Run Plan Spread Sheet attachment:pion_lowEkin_runplan.ods 
 ** Run Plan attachment:runplan_lowQ2.pdf  
 ** SIMC Plots (low Q2 Fpi) attachment:tphi_lowQ2.pdf  
 ** Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf 

 * Run List 
 ** Runlist CSV file attachment:pion_runlist_summer19.csv  

 * Run Sheets 
 ** 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) attachment:optics_2p7gev.pdf 
 ** 2.7 GeV Run Sheets attachment:runsheets_2p7gev.pdf 
 ** 3.6 GeV Run Sheets attachment:runsheets_3p6gev.pdf 
 ** 4.5 GeV Run Sheets attachment:runsheets_4p5gev.pdf 

 h2. Later high energy running 

 * Beam pipe requirements attachment:beampipe_req.pdf