h1. *Kaon LT Meetings*
4
5 2 Richard Trotta
----
6
7 1 Richard Trotta
h2. February 22, 2018
8
9
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
10
11
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
12
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
13
* Discussion of Richard's slides on run plan kinematics and preparations -
14
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
15
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
16
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
17
** kinematics plots W-Q2 show that still need to do some optimization
18
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
19
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
20
21
* *Action Items:*
22
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
23
** Update run sheet and kinematic optimization for W/Q2 (Garth)
24
** Circulate elastic calculations for kinematic settings (Samip)
25
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
26
** Test software installation instructions (Pete)
27
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
28
29 2 Richard Trotta
----
30 1 Richard Trotta
31
h2. March 29, 2018
32
33
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
34
35
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
36
* Luminosity scans (Ryan, Andres, Richard, Pete)
37
* Macros, SIDIS analysis (Hem, Anashe)
38
* Elastic data (TBD)
39
40 2 Richard Trotta
----
41 1 Richard Trotta
42
h2. April 26, 2018
43
44
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
45
46
* Discussion luminosity scan analysis (earlier scan) - Richard
47
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
48
** Notes on efficiencies in report file:
49
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
50
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
51
*** Tracking efficiency needs to be checked
52
*** 3/4 trigger efficiency seems ok
53
* Discussion luminosity scan analysis (later scan) - Ryan
54
** Fewer carbon runs than earlier scan
55
** Shown is a tracking-based analysis using data from the ROOT trees
56
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
57
* SIDIS analysis - Hem
58
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
59
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
60
* Analysis of exclusive events in SIDIS - Samip
61
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
62
** Ongoing work on implementing coincidence time into tree
63
* Discussion of run plan, and in particular possible low Q2/low energy
64
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
65
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
66
** Garth will put this together in a draft email
67
68 2 Richard Trotta
----
69
70 1 Richard Trotta
h2. May 10, 2018
71
72
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
73
74
* Luminosity Scans January 2018 (Richard)
75
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
76
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
77
** Efficiency calculation was investigated in detail and applied using scalers from trees
78
** Results for carbon (normalized to 30uA) show large variation - need to understand
79
** *Next steps:*
80
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
81
*** Check stability of pre-scale (Ryan saw changes within runs)
82
*** Check if detector calibrations for runs are implemented correctly
83
*** Analyze with Ryan's cuts
84
85
* Luminosity Scans April 2018 (Ryan)
86
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
87
** Tracking-based analysis for runs 2073-2095
88
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
89
** Included most recent detector calibrations in replay of these runs
90
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
91
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
92
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
93
** *Next steps:*
94
*** Check tracking efficiency
95
96
* *Global comments on Luminosity Scans (so far)*
97
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
98
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
99
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
100
** Uncertainties on current
101
** Detector calibrations
102
** HMS vs. SHMS
103
104
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
105
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
106
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
107
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
108
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
109
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
110
** *Next steps:*
111
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
112
113
* Yield normalized ratios from SIDIS (Hem)
114
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
115
** *Next steps:*
116
*** Check if efficiencies, currents, run time etc. are taken into account correctly
117
118 2 Richard Trotta
----
119 1 Richard Trotta
120
h2. May 17, 2018 
121
122
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
123
124
* Luminosity scans (Richard, Ryan)
125
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
126
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
127
** discussion about pre-scale factors
128
129
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
130
** Add option for looking at yields with cuts on cointime, target window, and missing mass
131
** Add option to look at real peak vs. background level
132
133
* H(e,e'p) kinematics investigation for fall run (Samip)
134
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
135
136
* *Action Items*
137
** Luminosity scans at low rates from January (Richard)
138
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
139
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
140
** Kaon LT detailed run plan (Garth, Pete, Tanja)
141
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
142
143 2 Richard Trotta
----
144
145 1 Richard Trotta
h2. May 31, 2018
146
147
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
148
149 3 Richard Trotta
----
150
151 1 Richard Trotta
h2. June 28, 2018
152
153
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
154
155 6 Richard Trotta
*Action Items:*
156 5 Richard Trotta
157
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
158
* Contact potential run coordinators. (Tanja)
159
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
160
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
161
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
162
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
163
* Develop trigger/detector checkout plan (Tanja, initial draft)
164
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
165
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
166
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
167
168 6 Richard Trotta
*Analysis Updates:*
169 5 Richard Trotta
170 1 Richard Trotta
* Ryan 
171
** resolving differences between his analysis and Richard's
172
173
* Richard
174
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
175
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
176
177 2 Richard Trotta
----
178
179 1 Richard Trotta
h2. July 11, 2018
180
181 2 Richard Trotta
*Ongoing Tasks->* #381 #382 #383 #384
182
183 4 Richard Trotta
*Action items:*
184
185
* Update run plan, e.g. add prescales (Garth)
186
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
187
* Identify additional run coordinators (Tanja)
188
* Encourage collaborators to take shifts, e.g. FIU (Pete)
189
* Draft email about shifts etc. to collaboration (Tanja)
190
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
191
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
192
193
*Discussions:*
194
195
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
196
* HGC: waiting for re-installation
197
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
198
* Shifts
199
* Diagnostics scripts and documentation
200
* Personnel schedules
201
202 2 Richard Trotta
----
203 7 Richard Trotta
204
h2. August 3, 2018
205
206 10 Richard Trotta
*Ongoing Tasks->* #381 #382 #383
207 8 Richard Trotta
*Links to talks->*
208 9 Richard Trotta
209
----
210
211
h2. August 8, 2018
212
213 11 Richard Trotta
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406