Project

General

Profile

Kaon LT Meetings » History » Version 46

Richard Trotta, 06/14/2019 11:50 AM

1 1 Richard Trotta
{{>toc}}
2
3
h1. *Kaon LT Meetings*
4
5 41 Stephen Kay
Kaon LT collaboration analysis meetings. Please add your talk to the meeting ahead of time. Add the newest meeting to the top of the list!
6
7 2 Richard Trotta
----
8
9 42 Stephen Kay
h2. June 14, 2019
10
11 45 Vijay Kumar
*Links to talks->* 
12 46 Richard Trotta
13 42 Stephen Kay
----
14
15 35 Stephen Kay
h2. June 4, 2019
16 1 Richard Trotta
17 40 Mireille Muhoza
*Links to talks->* "Stephen":https://redmine.jlab.org/documents/56 "Nathan":https://redmine.jlab.org/documents/57 "Vijay":https://redmine.jlab.org/documents/58 "Richard":https://redmine.jlab.org/documents/59 "Hallc Talk Outline":https://redmine.jlab.org/documents/60 "Mireille":https://redmine.jlab.org/documents/61
18 36 Vijay Kumar
19 1 Richard Trotta
20 35 Stephen Kay
----
21 1 Richard Trotta
22 35 Stephen Kay
h2. May 21, 2019
23 1 Richard Trotta
24 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/52 "Mireille":https://redmine.jlab.org/documents/? "Stephen":https://redmine.jlab.org/documents/53 "Nathan":https://redmine.jlab.org/documents/54 "Vijay":https://redmine.jlab.org/documents/55
25
26 1 Richard Trotta
----
27
28 35 Stephen Kay
h2. May 14, 2019
29 1 Richard Trotta
30 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/48 "Carlos' slides":https://redmine.jlab.org/documents/49 "Mireille":https://redmine.jlab.org/documents/50 "Stephen":https://redmine.jlab.org/documents/51
31 1 Richard Trotta
32
----
33
34 35 Stephen Kay
h2. April 30, 2019
35 1 Richard Trotta
36 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/45 "Richard's slides in wiki":https://redmine.jlab.org/projects/kltexp/wiki/Analysis_How-To "Brad Computing":https://redmine.jlab.org/documents/46 "Stephen":https://redmine.jlab.org/documents/47
37 1 Richard Trotta
38
----
39
40 35 Stephen Kay
h2. February 4, 2019
41 1 Richard Trotta
42 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/43 "Stephen":https://redmine.jlab.org/documents/44
43 1 Richard Trotta
44 35 Stephen Kay
----
45 1 Richard Trotta
46 35 Stephen Kay
h2. August 21, 2018
47 1 Richard Trotta
48 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
49 1 Richard Trotta
50 35 Stephen Kay
----
51 1 Richard Trotta
52 35 Stephen Kay
h2. August 8, 2018
53 1 Richard Trotta
54 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #404 #405 #406
55
56 1 Richard Trotta
----
57
58 35 Stephen Kay
h2. August 3, 2018
59 1 Richard Trotta
60 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383
61
*Links to talks->*
62 1 Richard Trotta
63 35 Stephen Kay
----
64 1 Richard Trotta
65 35 Stephen Kay
h2. July 11, 2018
66 1 Richard Trotta
67 35 Stephen Kay
*Ongoing Tasks->* #381 #382 #383 #384
68 1 Richard Trotta
69 35 Stephen Kay
*Action items:*
70 1 Richard Trotta
71 35 Stephen Kay
* Update run plan, e.g. add prescales (Garth)
72
* Check on details of: magnet cycling procedure, minimum angles, MCC fringe field steering, beam energy measurements, optics checks (Tanja)
73
* Identify additional run coordinators (Tanja)
74
* Encourage collaborators to take shifts, e.g. FIU (Pete)
75
* Draft email about shifts etc. to collaboration (Tanja)
76
* Develop diagnostic scripts and kaonLT specific (Richard, Ryan)
77
* Continue documentation development, e.g. checklist, shift taker instructions, HowTo or link to generic Hall C HowTo, task list, web page (Richard, Garth)
78 1 Richard Trotta
79 35 Stephen Kay
*Discussions:*
80 1 Richard Trotta
81 35 Stephen Kay
* SHMS Aerogel Cherenkov: tray has been changed to SP-11 on 10 July, nominal time for change is 8 hours, one tray can stay in the hall to minimize overhead
82
* HGC: waiting for re-installation
83
* Trigger checkout: main items to keep in mind: fADC thresholds, timing HMS/SHMS - leading arm, possible rate limitations
84
* Shifts
85
* Diagnostics scripts and documentation
86
* Personnel schedules
87 1 Richard Trotta
88
----
89
90
h2. June 28, 2018
91
92
*Links to talks->* "Richard":https://redmine.jlab.org/documents/34
93
94
*Action Items:*
95
96
* Develop and post shift schedule. Send out request. Find out who is KAONLT liaison (Tanja)
97
* Contact potential run coordinators. (Tanja)
98
* Aerogel tray exchange for start of experiment and coordination of future exchanges (Vladimir)
99
* Update runplan and prepare documents needed for shift crew, e.g. run sheets (Garth)
100
* Set up a web page to collect and link from Redmine - How-To documents, initial calibrations, etc. (Garth, Richard)
101
* Adapt luminosity scan script to calculate kaon yields by run number for use during experiment by shift crew - has to be simple to use. (Richard)
102
* Develop trigger/detector checkout plan (Tanja, initial draft)
103
** Are all experts available at run start, experts needed: coincidence timing , Harp Scans, BCM calibrations, ...
104
* Find out from JLab what the anticipated settings are for limit switches for both spectrometers and for separation angle in between them. Also find out what magnet cycling procedure should be used for L/T quality separation data (Tanja)
105
* Find out if all aerogel trays needed for experiment can be stored inside Hall C to avoid having to open truck ramp (Vladimir)
106
107
*Analysis Updates:*
108
109
* Ryan 
110
** resolving differences between his analysis and Richard's
111
112
* Richard
113
** Discussed with Mark Jones and is cross checking his January luminosity scan analysis against Mark's. Realized that BCM calibrations (gains, offsets etc) are different - currently working on fixing that, presents current results - low curent point is ~10% below unity, discussion that this seems to indicate that BCM offsets are the issue as low current points would be most sensitive, is planning to also double-check the BCM calibration procedure - had discussion with Dave Mack at JLab
114
** Presents a script developed for luminosity scans that determines yields for a run number input on command line. Discussion this could be good to adapt for kaon counting during experiment.
115
116
----
117
118 35 Stephen Kay
h2. May 31, 2018
119 1 Richard Trotta
120 35 Stephen Kay
*Links to talks->* "Samip":https://redmine.jlab.org/documents/30
121 1 Richard Trotta
122 35 Stephen Kay
----
123 1 Richard Trotta
124 35 Stephen Kay
h2. May 17, 2018 
125 1 Richard Trotta
126 35 Stephen Kay
*Links to talks->* "Richard":https://redmine.jlab.org/documents/29, "Ryan":https://hallcweb.jlab.org/DocDB/0009/000968/001/Presentation.pdf, "Samip":https://redmine.jlab.org/documents/30
127 2 Richard Trotta
128 35 Stephen Kay
* Luminosity scans (Richard, Ryan)
129
** Carbon scan from April seems consistent with no boiling, LH2 and LD2 show deviation from unity, should check effect of EDTM events on efficiencies
130
** Carbon scans from January (low rates) have large deviations from unity, in particular behavior at higher currents (>40uA), e.g. cpu dead time, that is not yet understood
131
** discussion about pre-scale factors
132 1 Richard Trotta
133 35 Stephen Kay
* Discussion about Richard's script extracting and printing information from report files and trees including histograms
134
** Add option for looking at yields with cuts on cointime, target window, and missing mass
135
** Add option to look at real peak vs. background level
136 1 Richard Trotta
137 35 Stephen Kay
* H(e,e'p) kinematics investigation for fall run (Samip)
138
** Optimal range is between electron angles of 17-20 degrees, time required ranges from ~1 hour at 17 degrees to ~3 hour at 20 degrees, other angles may be of interest for disentangling charge and current dependent effects
139 1 Richard Trotta
140 35 Stephen Kay
* *Action Items*
141
** Luminosity scans at low rates from January (Richard)
142
** Luminosity scans from April with corrected efficiencies, e.d. DT (Ryan)
143
** H(e,e'p) and H(e,e') kinematics for upcoming Kaon LT run (Samip)
144
** Kaon LT detailed run plan (Garth, Pete, Tanja)
145
** Preparations, e.g. report files, diagnostic histograms and real time monitoring, shift worker instructions, optimization of trees (all)
146 1 Richard Trotta
147
----
148
149 35 Stephen Kay
h2. May 10, 2018
150 1 Richard Trotta
151 35 Stephen Kay
*Links to talks->* "Hem":https://redmine.jlab.org/documents/24, "Richard":https://redmine.jlab.org/documents/23, "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/26
152 2 Richard Trotta
153 35 Stephen Kay
* Luminosity Scans January 2018 (Richard)
154
** Tracking-based analysis for Runs 1415-1423, .. for now focus on HMS, typical HMS S1X rates are <
155
** Cuts applied: PID for electrons (Cer, Cal), acceptance (delta)
156
** Efficiency calculation was investigated in detail and applied using scalers from trees
157
** Results for carbon (normalized to 30uA) show large variation - need to understand
158
** *Next steps:*
159
*** Double check calculation of computer lifetime, look for differences in TRIG and PRETRIG scalers
160
*** Check stability of pre-scale (Ryan saw changes within runs)
161
*** Check if detector calibrations for runs are implemented correctly
162
*** Analyze with Ryan's cuts
163 1 Richard Trotta
164 35 Stephen Kay
* Luminosity Scans April 2018 (Ryan)
165
** Confirms Richard's earlier finding that scaler-based analysis is not reliable and that it's best to analyze event-by-event
166
** Tracking-based analysis for runs 2073-2095
167
** Cuts applied: PID for electrons (TOF, Cal, Chi2), acceptance (delta and angles), BCM4a
168
** Included most recent detector calibrations in replay of these runs
169
** Efficiencies from report file mainly, may need to update tracking efficiency implementation
170
** Found that calculations of computer deadtime requires different set of scalers for runs from January to those from April 2018
171
** Results show carbon yields consistent with unity within error (0.5% error bars), and boiling for hydrogen and deuterium
172
** *Next steps:*
173
*** Check tracking efficiency
174 5 Richard Trotta
175 35 Stephen Kay
* *Global comments on Luminosity Scans (so far)*
176
** April 2018 scans show hydrogen and deuterium target boiling on level of 3-4%, Carbon is consistent with no boiling, as expected - based on description, new targets are expected to have less boiling than those used previously, e.g. in FPI2. Double check this.
177
** Efficiencies in report files need to be updated, e.g. CPU deadtime (Richard)
178
** Check if BCM4a is the one closest to the target - get a map of the hall (Richard, Ryan)
179
** Uncertainties on current
180
** Detector calibrations
181
** HMS vs. SHMS
182 1 Richard Trotta
183 35 Stephen Kay
* eK+ coincidence time from SIDIS Spring 2018 run (Samip)
184
** Worked with Mark Jones on coincidence time calculation - now available in hcana (see Samip's 10 May 2018 email for more details)
185
** runs used in this analysis: 3423 with Q2=3.1 GeV2 and W=2.78 GeV
186
** Coincidence time spectrum shows peak separations >2 ns corresponding to different accelerator frequency
187
** Missing mass spectra: Kaon peak clearly visible, also see pions even after cuts
188
** Found that pions appear localized in phase space - seems to be due to end point in kinematic phase space
189
** *Next steps:*
190
*** Look for a run with kaon momentum closer to 3 GeV/c (aerogel threshold is ~3 GeV/c for kaons for n=1.015)
191 2 Richard Trotta
192 35 Stephen Kay
* Yield normalized ratios from SIDIS (Hem)
193
** Yield ratios of data to MC match well in shape, but normalization seems not quite right
194
** *Next steps:*
195
*** Check if efficiencies, currents, run time etc. are taken into account correctly
196 4 Richard Trotta
197
----
198
199 35 Stephen Kay
h2. April 26, 2018
200 4 Richard Trotta
201 35 Stephen Kay
*Links to talks->* "Richard,":https://redmine.jlab.org/documents/18 "Ryan, ":https://redmine.jlab.org/documents/20 "Samip":https://redmine.jlab.org/documents/25
202 4 Richard Trotta
203 35 Stephen Kay
* Discussion luminosity scan analysis (earlier scan) - Richard
204
** Shown is a scaler-based analysis using scalers from report file and from ROOT tree - the values are different, why that is has to be checked
205
** Notes on efficiencies in report file:
206
*** DT (EDTM) is not electronic deadtime. Instead use for now 50ns* trigger rate for HMS and 100ns* trigger rate for SHMS
207
*** Cherenkov efficiency seems low (check if that is due to PID, thresholds, pi/e, etc)
208
*** Tracking efficiency needs to be checked
209
*** 3/4 trigger efficiency seems ok
210
* Discussion luminosity scan analysis (later scan) - Ryan
211
** Fewer carbon runs than earlier scan
212
** Shown is a tracking-based analysis using data from the ROOT trees
213
** First results for carbon, LH2, and LD2, but efficiencies need to be checked
214
* SIDIS analysis - Hem
215
** Shown is a data/MC comparison for different kinematic settings. Agreement in shape is very good. Normalization has yet to be applied.
216
** Discussion about agreement in z and apparent offset - relation of this offset with spectrometer offset
217
* Analysis of exclusive events in SIDIS - Samip
218
** Shown is a look at the first kaon events in exclusive limit of SIDIS data
219
** Ongoing work on implementing coincidence time into tree
220
* Discussion of run plan, and in particular possible low Q2/low energy
221
** Assume that kaon low Q2=0.4 already included - have kinematics with specified beam energies, if needed
222
** For pion form factor and LT, have two possible settings that can use the prescribed beam energies: Q2=1.45 and 0.35 GeV2 - prioritize towards the higher Q2 as not as sensitive to offsets
223
** Garth will put this together in a draft email
224
225 12 Richard Trotta
----
226
227 35 Stephen Kay
h2. March 29, 2018
228 12 Richard Trotta
229 35 Stephen Kay
*Links to talks->* "Richard, ":https://redmine.jlab.org/documents/16 "Samip":https://redmine.jlab.org/documents/27
230 13 Richard Trotta
231 35 Stephen Kay
* Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
232
* Luminosity scans (Ryan, Andres, Richard, Pete)
233
* Macros, SIDIS analysis (Hem, Anashe)
234
* Elastic data (TBD)
235
236 14 Richard Trotta
----
237 18 Richard Trotta
238 35 Stephen Kay
h2. February 22, 2018
239 18 Richard Trotta
240 35 Stephen Kay
*Links to talks->* "Andres":https://redmine.jlab.org/documents/19
241 18 Richard Trotta
242 35 Stephen Kay
*  Discussion of Andres' slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
243
* Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics
244
* Discussion of Richard's slides on run plan kinematics and preparations -
245
** everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
246
** before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
247
** for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
248
** kinematics plots W-Q2 show that still need to do some optimization
249
** run sheets: include raster size, update coincidence count labeling, and carbon target labeling
250
* Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
251 26 Richard Trotta
252 35 Stephen Kay
* *Action Items:*
253
** Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
254
** Update run sheet and kinematic optimization for W/Q2 (Garth)
255
** Circulate elastic calculations for kinematic settings (Samip)
256
** Continue investigation of elastic data and run plan kinematics (Andres/Richard)
257
** Test software installation instructions (Pete)
258
** Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja) 
259 32 Stephen Kay
260
----