Project

General

Profile

Other Technical Notes » History » Revision 9

Revision 8 (Richard Trotta, 12/03/2020 10:45 AM) → Revision 9/10 (Richard Trotta, 11/08/2025 11:29 AM)

h1. Other Technical Notes 

 * "Carlos Yero: Hall C Analysis Procedure":https://redmine.jlab.org/attachments/download/915/analysis_notes_Yero.pdf 

 * "Dave Mack: A closer look at long term stability of BCM1,2 for Fall '18 thru Summer '19":https://hallcweb.jlab.org/doc-public/ShowDocument?docid=1034 

 * "Garth Huber: pi- analysis technical note":https://hallcweb.jlab.org/doc-private/ShowDocument?docid=773 
 ** Goes through a lot of details on tracking efficiencies at very high rates, luminosity scans, and trigger blocking corrections 

 * "Hall C Standard Equipment Manual":https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf