Run Plans and Run Sheets » History » Revision 119
Revision 118 (Garth Huber, 07/17/2019 11:06 PM) → Revision 119/122 (Richard Trotta, 06/29/2022 12:53 AM)
{{>toc}}
h1. Run Plans and Run Sheets
* Run Sheets #383
* Run Plan Spread Sheet attachment:kaon_runplan_19mar11.ods
h2. 6.2 GeV Beam
* Run Plan attachment:runplan_6p2gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_6p2gev_scan.pdf
* "6.2 GeV Run list":https://redmine.jlab.org/attachments/768/kaonlt_runlist_8p2-6p2.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_82-62.ods
h3. 6.2 GeV Run sheets
** Sieve attachment:sieve_6p2.pdf
** Heep attachment:heep_6p2.pdf
** Luminosity scan attachment:lumi_6p2.pdf
** Q2=3.0 W=2.32 x=0.40 attachment:qsq3p0_w2p32_loeps.pdf
** Q2=2.115 W=2.95 x=0.21 attachment:qsq2p115_w2p95_loeps.pdf
h2. 8.2 GeV Beam
* Run Plan attachment:runplan_8p2gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_8p2gev_scan.pdf
* "8.2 GeV Run list":https://redmine.jlab.org/attachments/768/kaonlt_runlist_8p2-6p2.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_82-62.ods
h3. 8.2 GeV Run sheets
** Sieve attachment:sieve_8p2.pdf
** Heep attachment:heep_8p2.pdf
** Luminosity scan attachment:lumi_8p2.pdf
** Q2=4.4 W=2.74 x=0.40 attachment:qsq4p4_w2p74_loeps.pdf
** Q2=3.0 W=3.14 x=0.25 attachment:qsq3p0_w3p14_loeps.pdf
** Q2=5.5 W=3.02 x=0.40 attachment:qsq5p5_w3p02_loeps.pdf
h2. 3.8 GeV Beam
* Run Plan attachment:runplan_3p8gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_3p8_4p9_scan.pdf
* "3.8 GeV Run list":https://redmine.jlab.org/attachments/611/kaonlt_runlist_3p8-4p9.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_38-49.ods
h3. 3.8 GeV Run sheets
** Heep attachment:heep_3p8.pdf
** Q=0.5, W=2.40 Center Part 1 attachment:qsq0p5_loeps_cent.pdf
** Q=0.5, W=2.40 Left attachment:qsq0p5_loeps_left.pdf
** Q=0.5, W=2.40 Center Part 2 attachment:qsq0p5_loeps_cent-2.pdf
h2. 4.9 GeV Beam
* Run Plan attachment:runplan_4p9gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_3p8_4p9_scan.pdf
* "4.9 GeV Run list":https://redmine.jlab.org/attachments/611/kaonlt_runlist_3p8-4p9.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_38-49.ods
h3. 4.9 GeV Run sheets
** Heep attachment:heep_4p9.pdf
** Q=0.5, W=2.40 Center attachment:qsq0p5_hieps_cent.pdf
** Q=0.5, W=2.40 Left attachment:qsq0p5_hieps_left.pdf
** Q=0.5, W=2.40 Right attachment:qsq0p5_hieps_right.pdf
h2. 9.4 GeV Beam
* Run Plan attachment:runplan_10p6gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_10p6gev_scan.pdf
* "10.6 GeV Run list":https://redmine.jlab.org/attachments/548/kaonlt_runlist.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_106.ods
h3. 9.4 GeV Run sheets
** Heep attachment:heep_10p6.pdf
** Luminosity scan attachment:lumi_10p6.pdf
** Q=2.1, W=2.95 attachment:qsq2p1_w2p95_hieps.pdf
** Q=3.0, W=2.32 attachment:qsq3p0_w2p32_hieps.pdf
** Q=3.0, W=3.14 attachment:qsq3p0_w3p14_hieps.pdf
** Q=4.4, W=2.74 attachment:qsq4p4_w2p74_hieps.pdf
** Q=5.5, W=3.02 attachment:qsq5p5_w3p02_hieps.pdf
h2. 10.6 GeV Beam
* Run Plan attachment:runplan_10p6gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_10p6gev_scan.pdf
* "10.6 GeV Run list":https://redmine.jlab.org/attachments/548/kaonlt_runlist.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_106.ods
h3. 10.6 GeV Run sheets
** Heep attachment:heep_10p6.pdf
** Luminosity scan attachment:lumi_10p6.pdf
** Q=2.1, W=2.95 attachment:qsq2p1_w2p95_hieps.pdf
** Q=3.0, W=2.32 attachment:qsq3p0_w2p32_hieps.pdf
** Q=3.0, W=3.14 attachment:qsq3p0_w3p14_hieps.pdf
** Q=4.4, W=2.74 attachment:qsq4p4_w2p74_hieps.pdf
** Q=5.5, W=3.02 attachment:qsq5p5_w3p02_hieps.pdf