Run Plans and Run Sheets » History » Revision 74
Revision 73 (Richard Trotta, 11/27/2018 04:01 PM) → Revision 74/122 (Richard Trotta, 11/27/2018 04:02 PM)
{{>toc}}
h1. Run Plans
* Run Sheets #383
* Run Plan Spread Sheet attachment:kaon_runplan_18nov07.ods
h2. 3.8 GeV Beam
* Run Plan attachment:runplan_3p8gev.pdf
* 3.8 GeV Run list
* Kaon LT Charge and Time Spreadsheet attachment:
h3. 3.8 GeV Run sheets
** Heep attachment:
** Q=0.5, W=2.40 attachment:
h2. 4.9 GeV Beam
* Run Plan attachment:runplan_4p9gev.pdf
* 4.9 GeV Run list
* Kaon LT Charge and Time Spreadsheet attachment:
h3. 4.9 GeV Run sheets
h2. 10.6 GeV Beam
* Run Plan attachment:runplan_10p6gev.pdf
* Scanned run plan (with shift worker and RC notes) attachment:runplan_10p6gev_scan.pdf
* "10.6 GeV Run list":https://redmine.jlab.org/attachments/548/kaonlt_runlist.csv
* Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_106.ods
h3. 10.6 GeV Run sheets
** Heep attachment:heep_10p6.pdf
** Luminosity scan attachment:lumi_10p6.pdf
** Q=2.1, W=2.95 attachment:qsq2p1_w2p95_hieps.pdf
** Q=3.0, W=2.32 attachment:qsq3p0_w2p32_hieps.pdf
** Q=3.0, W=3.14 attachment:qsq3p0_w3p14_hieps.pdf
** Q=4.4, W=2.74 attachment:qsq4p4_w2p74_hieps.pdf
** Q=5.5, W=3.02 attachment:qsq5p5_w3p02_hieps.pdf
h2. 8.5 GeV Beam
* Run Plan attachment:runplan_8p5gev.pdf
h2. 6.4 GeV Beam
* Run Plan attachment:runplan_6p4gev.pdf
h2. 9.4 GeV Beam (archive purposes only)
* Run Plan attachment:runplan_9p4gev.pdf