Project

General

Profile

Run Plans and Run Sheets » History » Revision 76

Revision 75 (Richard Trotta, 11/27/2018 04:02 PM) → Revision 76/122 (Richard Trotta, 11/27/2018 05:55 PM)

{{>toc}} 

 h1. Run Plans 

 * Run Sheets #383 
 * Run Plan Spread Sheet attachment:kaon_runplan_18nov07.ods 

 h2. 3.8 GeV Beam 

 * Run Plan attachment:runplan_3p8gev.pdf  
 * 3.8 GeV Run list 
 * Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_38.ods attachment: 

 h3. 3.8 GeV Run sheets 

 ** Heep attachment: 
 ** Q=0.5, W=2.40 attachment: 

 h2. 4.9 GeV Beam 

 * Run Plan attachment:runplan_4p9gev.pdf  
 * 4.9 GeV Run list 
 * Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_49.ods attachment: 

 h3. 4.9 GeV Run sheets 

 ** Heep attachment: 
 ** Q=0.5, W=2.40 attachment: 

 h2. 10.6 GeV Beam 

 * Run Plan attachment:runplan_10p6gev.pdf  
 * Scanned run plan (with shift worker and RC notes) attachment:runplan_10p6gev_scan.pdf 
 * "10.6 GeV Run list":https://redmine.jlab.org/attachments/548/kaonlt_runlist.csv 
 * Kaon LT Charge and Time Spreadsheet attachment:KaonLT_PhysicsSettings_106.ods 

 h3. 10.6 GeV Run sheets 

 ** Heep attachment:heep_10p6.pdf 
 ** Luminosity scan attachment:lumi_10p6.pdf 
 ** Q=2.1, W=2.95 attachment:qsq2p1_w2p95_hieps.pdf 
 ** Q=3.0, W=2.32 attachment:qsq3p0_w2p32_hieps.pdf 
 ** Q=3.0, W=3.14 attachment:qsq3p0_w3p14_hieps.pdf 
 ** Q=4.4, W=2.74 attachment:qsq4p4_w2p74_hieps.pdf 
 ** Q=5.5, W=3.02 attachment:qsq5p5_w3p02_hieps.pdf 

 h2. 8.5 GeV Beam 

 * Run Plan attachment:runplan_8p5gev.pdf  

 h2. 6.4 GeV Beam 

 * Run Plan attachment:runplan_6p4gev.pdf 

 h2. 9.4 GeV Beam (archive purposes only) 

 * Run Plan attachment:runplan_9p4gev.pdf