Actions
Wiki » History » Revision 1
Revision 1/12
| Next »
Richard Trotta, 05/07/2018 12:27 PM
Notes from Meeting February 22, 2018¶
- Discussion of Andres's slides on elastic W calculation in hcana - initial issue with negative W values seems to be due to outdated information in standard.kinematics file. Additional investigation ongoing.
*Brief description of Samip's work - working on coincidence timing decoding with JLab staff and re-optimization of kinematics - Discussion of Richard's slides on run plan kinematics and preparations -
- everyone agrees that in general want to have as many L/T cross section separations as possible in a robust run plan balancing statistics vs. systematics
- before actual run may want to do a 3D optimization in all kinematic variables to get the best possible delta(epsilon) for the L/T separations
- for each setting will need 1-2 shifts for calibrations - need to negotiate with other experiments in run group
- kinematics plots W-Q2 show that still need to do some optimization
- run sheets: include raster size, update coincidence count labeling, and carbon target labeling
- Discussion of next meeting. Garth at JLab 8-16 March - might have meeting during that time.
- Action Items:
- Post slides/notes from this meeting and procedure to set up hcana in Redmine (Tanja)
- Update run sheet and kinematic optimization for W/Q2 (Garth)
- Circulate elastic calculations for kinematic settings (Samip)
- Continue investigation of elastic data and run plan kinematics (Andres/Richard)
- Test software installation instructions (Pete)
- Draft email to JLab management about need for small angle beam pipe - need to have HMS minimum angle of less than 13 degrees for kaon L/T separations (Tanja)
Notes from Meeting March 29, 2018¶
- Details of adding points to fall run plan - will be ready sooner, likely in week of 4/1 (Garth, Samip, Tanja)
- Luminosity scans (Ryan, Andres, Richard, Pete)
- Macros, SIDIS analysis (Hem, Anashe)
- Elastic data (TBD)
Updated by Richard Trotta over 6 years ago · 1 revisions