Project

General

Profile

Daily Reports » History » Version 9

Xiaochao Zheng, 01/14/2021 10:19 AM

1 1 Xiaochao Zheng
h1. Daily Reports
2
3
*Jixie  9:04 PM
4
daily report 1/13/2021*
5
A busy and tired day! At least our DAQ is ready to take beam with our own trigger!
6
# Start installation from 7AM. Finished installing detectors and cabling by 1PM
7
# Put the rack in the control room so no access needed for daq work. Our daq machines are also in the control room.
8
# David came to site. Help a lot in setting up computers. Xinzhan and I are working on detectors and daq cabling. Both desktops are online. CODA runs well.
9
# Operational Readiness Clearance (ORC) meeting started from 1 PM. Detectors are all good. However, JLab made VME cards were suggested to change fuse at the beginning...... After some long negotiation, we were requested to put kapton tape to cover the power interface. We also received some suggestions to run the experiment safely. We might get all signature by tomorrow
10
# We connected HV and signal cables to the patch panel. All PMT signals have been checked using an oscilloscope. All detectors work well. We do not have enough time to modify daq to take the FTBF trigger. FTBF has 3 channels for Cherenkov, none of them add into our FADC yet. (Need to find cable and do fan in fan out...) MWPC daq does not have a veto input, it can not take our busy status immediately. We have to form a new trigger then feed it. We will do this in the morning of Thursday.
11
# Accelerator is down. One magnet is not functioning. They are waiting for the radiation to cool down so they can fix it tomorrow morning. Beam might be available in the afternoon.
12
13
_To do:_
14
# Do FTBF controlled access leader training in Thursday morning 9AM
15
# MWPC daq is a well integrated machine (looks like a laptop). It does not provide L1A signal. We need to learn deep about this system to find out a possible way to take thrit L1A. We will then veto it using out busy status. Need to spend time here Thursday.
16
# connect cherenkov into our FADC.
17
18
Pictures under useful pictures with prefix 20200113_xx
19 2 Alexandre Camsonne
20 8 Alexandre Camsonne
21 9 Xiaochao Zheng
!{width:25%}https://redmine.jlab.org/attachments/download/1159/IMG_20210113_085123.jpg! !{width:25%}https://redmine.jlab.org/attachments/download/1160/IMG_20210113_160026.jpg! !{width:25%}https://redmine.jlab.org/attachments/download/1161/IMG_20210113_141747.jpg!
22
!{width:25%}https://redmine.jlab.org/attachments/download/1161/IMG_20210113_141747.jpg! !{width:25%}https://redmine.jlab.org/attachments/download/1162/IMG_20210113_141726.jpg!
23
24
*Jixie  8:02 PM daily update 1/12/2021*
25
# Took radiation practical training, both of Jixie and Xinzhan
26
# Met Lorenzo, have a long and deep conversation with him. He helped us setting up the gateway machine, which is soliddaq. Right now solidaq has 2 network interfaces, one of them is borrowed from FTBF.  soliddaq can access the public network, it also serves as the gateway of the private network. Because IP forward function is not enabled, right now private network members can not access public networks yet. (I need help from an expert to enable this.)
27
# If you want to access to clrlpc, you have to access to solidaq using fermilab linux account, then ssh from soliddaq into clrlpc using a-compton account. If you want to do that, send me your fermilab username. I can add your username into the name lists that allows you to login soliddaq using a-compton account.
28
# David brought the hard drive and pcie to usb3.1 convert card here. Two 5T hard drive (2.5") were installed into the usb hub provided by Alex. Tested the data transfer speed. It can reach 130MB/s when the CPU is idle. Data transfer speed changes a lot when coda is running. 
29
# JLab experts are working on DSC issues. The Fan-In-Fan-out module degrades the input signal too much, which is part of the reason that DSC lost signal.  We borrowed one from FTBF.  JLab experts are also checking and fixing the software.  Right now we can see TDC in the output file. Alex is still working on it to make sure it does not lose data.
30
# David is working on ORC form.
31
       
32
_Here is how we transfer data back to jlab:_
33
# make a copy of data into soliddaq, this copy will also be our backup of all raw data
34
# sent data from soliddaq to jlab
35
_To Do:_
36
# The beam will be off by 6AM Wednesday. We will start installation from 7 AM. We aim to finish cabling and installation by 1 PM.
37
# ROC inspection is scheduled at 1 PM Wednesday. I will show in person. David will join remotely.
38
# The beam is scheduled to be delivered by 5:30 PM.  Look forward to taking beam! (edited)