Fermilab Test Beam Run » History » Revision 5
« Previous |
Revision 5/12
(diff)
| Next »
David Flay, 01/17/2021 03:55 PM
Fermilab Test Beam Run¶
Run List¶
beam hit the edge of top Ecal
New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100
Run
777 First run - MWPC trigger -
New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000
783 Preshower channels set to 2V range in FADC
784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals
785
New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000
786 TS1 only - beam centered on calorimeter
New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900
787 lower HV on preshower
788
792
reduce 100 V more on preshower
793 short run PEB1 crashed
switch to FADC only config TiIntelvmeha8
795
Changing down stream Cerenkov N2 pressure
796 move to Top block
800 beam on the center of the top block, point A
801
802 beam on the center of the right block, point C
803 beam on the center of the left block, point A
804 beam on the center of 3 modules, 6.5k
805 2GeV, beam on the center of 3 modules, 31.7k
806 4GeV, beam on the center of 3 modules,
818 12 GeV e-
819 12 GeV e-
820 10 GeV e-
821 8 GeV e-
822 6 GeV e-
===========1GeV===================
HV is: 1260, 1280, 760, 860, 880, 1640, 1480, 1800
823
824
825
Switch to TS2 trigger
828
Switch back to TS1
831
839 daq crashed
847 1 GeV
848 6 GeV
849 6 GeV
850 6 GeV
851 6 GeV
Shifter Roles¶
- Leader: Communicate with MCR regarding desired beam energy and other relevant details. Manage the DAQ (start and stop runs)
- Remote: Keep a shift log of actives during the shift. Decode runs as they are completed. Post a shift summary logbook entry at the conclusion of your shift.
VNC Connection Information (for Remote Shifts)¶
- Using terminal, ssh into login and then the computer that has the VNC server on it
ssh -L 5901:localhost:XXXXjanedoe@fnalu.fnal.gov
Replace XXXX with a port number of your choice (avoid 22). Log in using JLab CUE credentials
- In the same session, ssh to the computer:
ssh -L XXXX:localhost:5901a-compton@clrlpc.dhcp.fnal.gov
Log in using JLab CUE credentials for user a-compton.
- On your machine, run the VNC application. When prompted for the VNC Server, use: localhost:5901
Encryption: Let VNC Server choose
Enter password set up on the VNC server
Log in using JLab credentials
How to make beam position plots using the MWPC data¶
The MWPC folder is located at: /home/a-compton/MWPC/
Raw data at: /home/a-compton/MWPC/data
decoder at: /home/a-compton/MWPC/analysis/basic
A script to run decoder and make one figure of beam position is available here:
/home/a-compton/MWPC/analysis/basic/wcsolid.csh
You can run this script at any folder.
Updated by David Flay almost 4 years ago · 5 revisions