Project

General

Profile

Actions

HV map

This figure shows how each detector is connected to fadc and HV crate (at jlab).

HV map for FTBF beam test

HV for FADC channel 0 to 7:
SC1 SC2 Ecal1 Ecal2 Ecal3 PrSh1 PrSh2 PrSh3
-1260 -1280 -760 -860 -880 -1640 -1480 -1800 <<== 1~8GeV
-1260 -1280 -720 -820 -840 -1640 -1480 -1800 <<== 8~12GeV
-1260 -1280 -600 -680 -720 -1640 -1480 -1760 <<== 12~16GeV

This setting was also used for some 1GeV calibrations
-1260 -1300 -880 -920 -940 -1640 -1440 -1800 <<== <1GeV

Updated by Jixie Zhang about 3 years ago · 5 revisions