This figure shows how each detector is connected to fadc and HV crate (at jlab).
HV map for FTBF beam test¶
HV for FADC channel 0 to 7:
SC1 SC2 Ecal1 Ecal2 Ecal3 PrSh1 PrSh2 PrSh3
-1260 -1280 -760 -860 -880 -1640 -1480 -1800 <<== 1~8GeV
-1260 -1280 -720 -820 -840 -1640 -1480 -1800 <<== 8~12GeV
-1260 -1280 -600 -680 -720 -1640 -1480 -1760 <<== 12~16GeV
This setting was also used for some 1GeV calibrations
-1260 -1300 -880 -920 -940 -1640 -1440 -1800 <<== <1GeV