 slot 7 FADC250_DAC 3300 (for all 16 channels) 
 slot 8 FADC250_DAC 3300 (for all 16 channels) 

 20220620 21:30 
 HV slot    2:      0      0      0      0      0      0      0 
 HV slot 10: 1500 1500 1500 1500      0      0      0      0      0      0      0 

 2925  	 FADC only 
 2926 	 FADC only 
 2927 	 FADC only 
 2928 	 FADC only 
 2929 	 FADC only 

 File not exist for run 2930-2949, debug DAQ 

 20220621 12:20 
 HV slot    2:    900    950    900      0      0      0      0 
 HV slot 10: 1500 1500 1500 1500 1500 1500 1500 1800 1800 1800 

 2950-2956 	 SSP only 
 2957 	 SSP only, trash 
 2958 	 debug DAQ, trash 
 2959 	 First run for FADC+SSP, good data 
 2960 	 good FADC+SSP data 
 2961-2964      DEBUG SSP, all trash 


 20220623 15:50 
 HV slot    2:    900    950    900 1500 1500 1500 1500  
 HV slot 10: 1600 1600 1700 1600 1500 1500 1500 1800 1800 1800 

 From this run, trigger lost due to FIFO has an 100mv offset 
 2965-2968 	 SSP only, no trigger and debug daq, trash 
 2969 	 FADC+SSP, no trigger, trash 
 2970 	 cosmic run, no trigger, trash 
 2971      beam run, no trigger, trash 

 From run 2972, trigger is connected to another FIFO unit which has 0 offset  
 20220624 12:20 
 HV slot    2:    900    950    900 1000 1000 1000 1000  
 HV slot 10: 1600 1600 1700 1600 1500 1500 1500 1800 1800 1800 
 2972 	 debug DAQ, trash 
 2973 	 good FADC+SSP data    <------- First run for good Cherenkov HV 
 2974 
 2975      trash 
 2976-2981 	 good FADC+SSP data  	
 2982 	 trash 
 2983-3002 	 good FADC+SSP data  	
 3003-3005 	 debug DAQ, trash 
 3006-3013 	 good FADC+SSP data  	
 3014-3015 	 cosmic  
 3016 		 daq crash, no output files 
 3017-3018 	 debug daq, trash 
 3019 		 cosmic 
 3020-3021 	 debug daq for DAC values and HV, trash 

 ===================================================================== 

 
 GOOD DATA STARTED ...... 

 
 ===================================================================== 

 For all runs before 3022, slot 7 and slot 8 FADC250_DAC are 3300 for all channels. Therefore some channels might not see signal. 

 20220629 16:20 
 HV slot    2:    900    950    900 1000 1000 1000 1000 
 HV slot 10: 1600 1600 1850 1750 1000 1100 1800 1680 1920 1800 

 slot 8 FADC250_DAC 3000  
 slot 8 FADC250_DAC 3300 3000 3300 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000  

 3022      First production run    <----------------- 
 3023      DAQ crashed 
 3024      production 
 3025      debug run, cosmic, trash 

 ===================================================================== 

 
 Cherenkov ch12 (started from 0) has cabling issue for runs before 3026 

 
 ===================================================================== 

 Change FADC DAC for Ecal channels 
 slot 8    FADC250_DAC 3300 3000 3300 3000 3000 3000 3000 3000 3000 3000 3300 3300 3300 3000 3300 3000  

 3026      production, cosmic at the first 4 hours(~30 events), see beam around 6 pm 
 3027 	 production 
 3028      production   
 3029  	 production, no beam at the beginning (several hours) 
 3030 	 production 
 3031 	 production 
 3032  	 production 
 3033  	 production 
 3034  	 production 
 3035  	 production 
 3036  	 production 
 3037  	 production, daq machine tunl11 has some issue and vncserver crashed, so coda also crashed 
 3038  	 production, first test run after rebooting tunl11 and sbsvme22, data is good 
 3039  	 production, test auto log scripts, data is good 
 3040  	 production  
 3041      cosmic, trash 
 3042  	 debug daq,trash 
 3043      no files, daq crashed 


 FADC config file changed:   
 1) remove slot 9 
 2) slot 7 

 FADC250_ALLCH_DAC 3205 3170 3170 3195 3195 3190 3200 3195 3180 3205 3190 3215 3170 3215 3175 3205 

 3)slot 8 

 FADC250_W_WIDTH 400 

 FADC250_ALLCH_DAC 3500 3200 3460 3190 3220 3210 3190 3220 3220 3190 3500 3520 3510 3500 3490 3450 


 3044  	 cosmic, slot 8 FADC250_W_WIDTH 400 
 3045  	 cosmic, slot 8 FADC250_W_WIDTH 400 


 changed slot 7 FADC250_W_WIDTH from 200 to 400 

 3046  	 both slot 7 and slot 8, FADC250_W_WIDTH = 400 
 3047 	 production 
 3048 	 production 
 3049      1 event only, cosmic, end it for changing config file 

 ::::::::::::::::::::::::GOOD DATA START::::::::::::::::::::::: 

 ============================================================== 

 For both slot #7 and #8, changed to the following 2 lines: 
 FADC250_W_OFFSET 1000 
 FADC250_W_WIDTH 1000 

 3050 	 debug fadc config file,FADC250_W_OFFSET=1000 and FADC250_W_WIDTH=1000 
 3051 	 debug fadc config file,FADC250_W_OFFSET=1000 and FADC250_W_WIDTH=1000 

 ============================================================== 

 for both slot #7 and #8, changed to the following 2 lines: 
 FADC250_W_OFFSET 1060 
 FADC250_W_WIDTH 400 

 3052 	 debug fadc config file,FADC250_W_OFFSET=1060 and FADC250_W_WIDTH=400 
 3053      production 
 3054      production 

 ============================================================== 

 
 HV changed 
 Slot 2 
 Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD 
 HV: 950 980 900 1000 1000 1000 1000 

 Slot 10 
 Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2) 
 HV: 1600 1600 1750 1750 900 1000 1950 1580 1750 1750 

 3055      HV tripped, empty,trash 
 3056      production 
 3057      production 

 ================================================================ 

 HV changed 
 Slot 2 
 Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD 
 HV: 1000 1030 900 1000 1000 1000 1000 

 Slot 10 
 Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2) 
 HV: 1600 1600 1750 1750 880 1000 1950 1550 1800 1750 
 3058      production 
 3059      production 
 3060      production 
 3061      production 
 3062      production 
 3063      cosmic, 6 events 
 3064      production 
 3065      production 
 3066      production 
 3067      production 
 3068      production 
 3069      production 
 3070      production 
 3071      production 
 3072      production 
 3073      production 
 3074      production 
 3075      production 
 3076      production 
 3077      production 
 3078      production 
 3079      pulse trigger 
 3080      pulse trigger 
 3081      pulse trigger 
 3082      pulse trigger 
 3083-3084 trash, no data file 
 3085      debug daq 
 3086      production 