Project

General

Profile

Actions

Hallc beamtest runlist » History » Revision 5

« Previous | Revision 5/9 (diff) | Next »
Jixie Zhang, 10/11/2022 08:59 PM


#This file record the run list for solid ecal beamtest in HallC.
#Do not delete

5-pass beam, 10.549 GeV

=================================================================
slot 7 FADC250_DAC 3300 (for all 16 channels)
slot 8 FADC250_DAC 3300 (for all 16 channels)

20220620 21:30
HV slot 2: 0 0 0 0 0 0 0
HV slot 10: 1500 1500 1500 1500 0 0 0 0 0 0 0

2925 FADC only
2926 FADC only
2927 FADC only
2928 FADC only
2929 FADC only

File not exist for run 2930-2949, debug DAQ

20220621 12:20
HV slot 2: 900 950 900 0 0 0 0
HV slot 10: 1500 1500 1500 1500 1500 1500 1500 1800 1800 1800

2950-2956 SSP only
2957 SSP only, trash
2958 debug DAQ, trash
2959 First run for FADC+SSP, good data
2960 good FADC+SSP data
2961-2964 DEBUG SSP, all trash

20220623 15:50
HV slot 2: 900 950 900 1500 1500 1500 1500
HV slot 10: 1600 1600 1700 1600 1500 1500 1500 1800 1800 1800

From this run, trigger lost due to FIFO has an 100mv offset
2965-2968 SSP only, no trigger and debug daq, trash
2969 FADC+SSP, no trigger, trash
2970 cosmic run, no trigger, trash
2971 beam run, no trigger, trash

From run 2972, trigger is connected to another FIFO unit which has 0 offset
20220624 12:20
HV slot 2: 900 950 900 1000 1000 1000 1000
HV slot 10: 1600 1600 1700 1600 1500 1500 1500 1800 1800 1800
2972 debug DAQ, trash
2973 good FADC+SSP data <------- First run for good Cherenkov HV
2974
2975 trash
2976-2981 good FADC+SSP data
2982 trash
2983-3002 good FADC+SSP data
3003-3005 debug DAQ, trash
3006-3013 good FADC+SSP data
3014-3015 cosmic
3016 daq crash, no output files
3017-3018 debug daq, trash
3019 cosmic
3020-3021 debug daq for DAC values and HV, trash =====================================================================
GOOD DATA STARTED ...... =====================================================================
For all runs before 3022, slot 7 and slot 8 FADC250_DAC are 3300 for all channels. Therefore some channels might not see signal.

20220629 16:20
HV slot 2: 900 950 900 1000 1000 1000 1000
HV slot 10: 1600 1600 1850 1750 1000 1100 1800 1680 1920 1800

slot 8 FADC250_DAC 3000
slot 8 FADC250_DAC 3300 3000 3300 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000

3022 First production run <-----------------
3023 DAQ crashed
3024 production
3025 debug run, cosmic, trash

=====================================================================
Cherenkov ch12 (started from 0) has cabling issue for runs before 3026 =====================================================================

Change FADC DAC for Ecal channels
slot 8 FADC250_DAC 3300 3000 3300 3000 3000 3000 3000 3000 3000 3000 3300 3300 3300 3000 3300 3000

3026 production, cosmic at the first 4 hours(~30 events), see beam around 6 pm
3027 production
3028 production
3029 production, no beam at the beginning (several hours)
3030 production
3031 production
3032 production
3033 production
3034 production
3035 production
3036 production
3037 production, daq machine tunl11 has some issue and vncserver crashed, so coda also crashed
3038 production, first test run after rebooting tunl11 and sbsvme22, data is good
3039 production, test auto log scripts, data is good
3040 production
3041 cosmic, trash
3042 debug daq,trash
3043 no files, daq crashed

FADC config file changed:
1) remove slot 9
2) slot 7

FADC250_ALLCH_DAC 3205 3170 3170 3195 3195 3190 3200 3195 3180 3205 3190 3215 3170 3215 3175 3205

3)slot 8

FADC250_W_WIDTH 400

FADC250_ALLCH_DAC 3500 3200 3460 3190 3220 3210 3190 3220 3220 3190 3500 3520 3510 3500 3490 3450

3044 cosmic, slot 8 FADC250_W_WIDTH 400
3045 cosmic, slot 8 FADC250_W_WIDTH 400

changed slot 7 FADC250_W_WIDTH from 200 to 400

3046 both slot 7 and slot 8, FADC250_W_WIDTH = 400
3047 production
3048 production
3049 1 event only, cosmic, end it for changing config file

==============================================================
:::::::::::::::::::::::USEFUL DATA START::::::::::::::::::::::
Before run 3050, only part of the pulse was recorded, therefore all these runs are gabages.
Runs 3050 - 3057 could be useful, but their HVs are not perfect. ==============================================================
for both slot #7 and #8, changed to the following 2 lines:
FADC250_W_OFFSET 1000
FADC250_W_WIDTH 1000

3050 debug fadc config file,FADC250_W_OFFSET=1000 and FADC250_W_WIDTH=1000
3051 debug fadc config file,FADC250_W_OFFSET=1000 and FADC250_W_WIDTH=1000

==============================================================
for both slot #7 and #8, changed to the following 2 lines:
FADC250_W_OFFSET 1060
FADC250_W_WIDTH 400

3052 debug fadc config file,FADC250_W_OFFSET=1060 and FADC250_W_WIDTH=400
3053 production
3054 production

==============================================================
HV changed
Slot 2
Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD
HV: 950 980 900 1000 1000 1000 1000

Slot 10
Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2)
HV: 1600 1600 1750 1750 900 1000 1950 1580 1750 1750

3055 HV tripped, empty,trash
3056 production
3057 production

================================================================
::::::::::::::::::::::::GOODEN DATA START::::::::::::::::::::::: ================================================================
HV changed
Slot 2
Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD
HV: 1000 1030 900 1000 1000 1000 1000

Slot 10
Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2)
HV: 1600 1600 1750 1750 880 1000 1950 1550 1800 1750
3058 production, 05:15 July 9th - 03:50, target=Loop 2 LH2,shms_p=8.035,shms_theta=7.83,hms_p=-2.398,hms_theta=28.19,
13:10 target changed to dummy, I=38uA,
18:43 target changed to Loop 2 LH2, I=38uA

3059 production, 03:56-15:24 July 10th,target=Loop 2 LH2,shms_p=8.035,shms_theta=7.83,hms_p=-2.398,hms_theta=28.19,
3060 production, 15:25-00:35, target=Loop 2 LH2,shms_p=8.035,shms_theta=7.83,hms_p=-2.398,hms_theta=28.19,
3061 production, 00:36-09:41 July 11th,target=Loop 2 LH2,shms_p=8.035,shms_theta=7.83,hms_p=-2.398,hms_theta=28.19,
05:55 SHMS rotated to 9.83deg, shms_p=8.035,shms_theta=9.83,hms_p=-2.398,hms_theta=28.19,

3062 production, 09:41-10:15 July 11th,target=Loop 2 LH2,shms_p=8.035,shms_theta=9.83,hms_p=-2.398,hms_theta=28.19,
3063 cosmic, 6 events

12:53 SHMS rotated to 5.65deg

3064 production, 16:06-11:19 July 12th,target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19

3065 production, 11:19-18:02 July 12th,target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
3066 production, 18:02-00:43,target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
3067 production, 00:45-11:48 July 13th,target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
3068 production, 11:48-02:04, target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
13:15, target ladder moved to home, no target (absolute empty)
14:50, target changed to dummy
23:28, target changed to Loop 2 10cm LH2

3069 production, 02:04-09:54 July 14th, target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
3070 production, 09:55 July 14th - 10:16 July 15th, target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
3071 production, 10:16-03:26 July 15th, target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
16:38 target changed to dummy
19:33 target changed to Loop 2 LH2

3072 production, 03:27-16:39 July 16th, target=Loop 2 LH2,shms_p=8.035,shms_theta=5.65,hms_p=-2.398,hms_theta=28.19
13:29 SHMS rotated to 9.65deg, tried to get I=80uA

3073 production, 16:42-14:26 July 17th,target=Loop 2 LH2,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
3074 production, 14:26-02:11,target=Loop 2 LH2,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
3075 production, 02:11-10:35 July 18th,target=Loop 2 LH2,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
3076 production, 10:16-00:39, target=Loop 2 LH2,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
3077 production, 00:39-09:42 July 19th, target=Loop 2 LH2,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
06:51 target changed to dummy

3078 production, 09:43-00:29 July 20th, target=dummy,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
10:04 target changed to Loop 2 LH2, target=Loop 2 LH2,shms_p=8.035,shms_theta=9.66,hms_p=-2.398,hms_theta=28.19
12:00-ish, SHMS rotated to 8.68deg, HMS rotated to 34.15deg,
target_type=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15, ===========================================================
3079 pulse trigger
3080 pulse trigger
3081 pulse trigger
3082 pulse trigger ===========================================================
3083-3084 trash, no data file
3085 debug daq
3086 production, 03:11-09:42 July 21st, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3087 production, 09:43-16:07 July 21st, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3088 production, 16:07-12:23 July 22nd, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3089 production, 12:23-04:28 July 23rd, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3090 production, 04:28-15:44 July 23rd, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3091 production, 15:47-05:28 July 24th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3092 production, 05:28-18:22 July 24th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3093 production, 18:22-09:32 July 25th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3094 production, 09:33-23:40 July 25th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3095 production, 23:41-09:29 July 26th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
3096 production, 09:29-15:35,July 26th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
13:45 target changed to dummy
beam stopped at ~15:10 due to thunderstorm.

beam stopped at 19:00-ish, no beam for whole day of July 20th

3097 production, 15:35 July 26th - 04:56 July 28th, target=dummy,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
Dummy target when this run was started. At 22:45 July 26, target ladder was changed to home(empty).
Tune beam cane at 11:27 July 27th.
12:15 July 27th, beam was stable to reach 65uA, changed target to Loop 2 LH2.
target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15
17:06 July 27th, changed target to dummy.
22:06 July 27th, changed target to Loop 2 LH2.

3098 production, 04:56-09:48 July 28th, target=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15

updating readout list ......
Bryan added a feature to run the fixed pulser at some frequency until some number of sync events.
It's currently configured (ti_list.c) with the structure:

typedef struct {
int enable; // enable (1) / disable (0)
int interval; // 1 sync event every interval events
int pedestal; // disable (0) / Disable after pedestal sync events
int current; // sync event counter for pedestal feature
int pulser_arg1; // fixed pulser argument. Units of 120ns.
} TI_SYNCEVENT_CONFIG;

TI_SYNCEVENT_CONFIG tiSyncEventConfig = {1, 1000, 100, 0, 83};

using hallc_ti configuation, with new ti_list.c
HV is off
3100 pulse, HV off, beam off
3101 pulse, HV off, beam off
3102 pulse, HV off, beam off

HV is on
3103 pulse, HV on, beam on
3104 pulse, HV on, beam on
3105 pulse, HV on, beam on

==========================================================================
go back to use hallc_fadc_ssp configuration, with new ti_list.c
3106 production, 11:41-12:19, target_type=Loop 2 10cm LH2,shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,

FADC config changed to make pedestal arround 100
slot 7:
#FADC250_ALLCH_DAC 3205 3170 3170 3195 3195 3190 3200 3195 3180 3205 3190 3215 3170 3215 3175 3205
FADC250_ALLCH_DAC 3150 3120 3120 3150 3150 3140 3150 3150 3130 3160 3140 3270 3120 3170 3130 3160

slot 8:
#FADC250_ALLCH_DAC 3500 3200 3460 3190 3220 3210 3190 3220 3220 3190 3500 3520 3510 3500 3490 3450
FADC250_ALLCH_DAC 3450 3150 3390 3140 3160 3150 3140 3170 3170 3130 3450 3470 3460 3450 3440 3390

3107-3111 debug daq, could be good for pedestal
3112 production, daq crashed, could be good for pedestal

3113 no data file, coda can not start

==========================================================================
Reboot tunl11 and sbsvme22

3114 production, 03:02-16:52,target_type=dummy, shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
11:21, target changed to Loop 2 10cm LH2, shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,

3115 production, 16:53-14:10 July 31st,target=Loop 2 10cm LH2, shms_p=7.913,shms_theta=8.68,hms_p=-2.341,hms_theta=34.15,
17:14 SHMS rotated to 10.86deg, HMS rotated to 13.43deg,
beam came back at 19:35, target=Loop 2 10cm LH2, shms_p=6.265,shms_theta=10.86,hms_p=-4.256,hms_theta=13.43,
01:01 target changed to dummy,
01:50 SHMS rotated to 8.86 deg,
01:53 target changed back to Loop 2 10cm LH2, shms_p=6.265,shms_theta=8.86,hms_p=-4.256,hms_theta=13.43,
05:12 target changed to dummy,
06:31 target changed back to Loop 2 10cm LH2,
13:12 SHMS rotated to 6.76deg, shms_p=6.265,shms_theta=6.76,hms_p=-4.256,hms_theta=13.43,

3116 production, 14:10-23:18 July 31st, target_type=Loop 2 10cm LH2,shms_p=6.265,shms_theta=6.76,hms_p=-4.256,hms_theta=13.43,I=40uA
Target changed to dummp at 14:35, then changed back to Loop 2 at 15:34,
17:58 SHMS angle changed to 7.91 deg, shms_p=6.538,shms_theta=7.91,hms_p=-3.944,hms_theta=17.5,I=40-65uA

3117 production, 23:18-09:24, target_type=Loop 2 10cm LH2,shms_p=6.538,shms_theta=7.91,hms_p=-3.944,hms_theta=17.5, I=40uA
Target changed to dummy at 01:40, then to Loop 1 10 cm LD2 at 02:40, beam stopped at 05:00

3118 production, 09:24-21:59, target_type=Loop 1 10cm LD2,shms_p=6.538,shms_theta=7.91,hms_p=-3.944,hms_theta=17.5, I=40uA
3119 production, 21:59-11:40, target_type=Loop 1 10cm LD2,shms_p=6.538,shms_theta=7.91,hms_p=-3.944,hms_theta=17.5, I=40uA,
SHMS rotated to 9.915deg at 5:25 20220802, after that, shms_p=6.538,shms_theta=9.91,hms_p=-3.944,hms_theta=17.5, I=50-65uA

3120 production,11:42-23:49, target_type=Loop 1 10cm LD2,shms_p=6.538,shms_theta=9.91,hms_p=-3.944,hms_theta=17.5
Target changed to 10cm dummy at 17:39, then changed to Loop 2 10 cm LH2 at 18:47, this run finished at 23:49

3121 production, 23:51-08:56, target_type=Loop 2 10cm LH2,shms_p=6.538,shms_theta=9.91,hms_p=-3.944,hms_theta=17.5, I=70uA
no beam for the fisrt 8 hours

GEM gas bottle might be emtpy ... need to verify from data

3122 production, 08:56-11:14, target_type=Loop 2 10cm LH2,shms_p=6.538,shms_theta=9.91,hms_p=-3.944,hms_theta=17.5, I=70uA
SHMS rotated to 11.91 deg at 10:25, shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5,

3123 production, 11:14-14:47, target_type=Loop 2 10cm LH2,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA
3124 production, 14:48-17:39, target_type=Loop 2 10cm LH2,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA

GEM HV is off

3125 production, 17:45-20:07, target_type=Loop 2 10cm LH2,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA

change target to dummy
3126 production, 20:22-21:07, target_type=dummy,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA

====================================================================
FADC slot 7.11 DAC value changed from 3270 to 3170
slot 7:
#FADC250_ALLCH_DAC 3205 3170 3170 3195 3195 3190 3200 3195 3180 3205 3190 3215 3170 3215 3175 3205
#FADC250_ALLCH_DAC 3150 3120 3120 3150 3150 3140 3150 3150 3130 3160 3140 3270 3120 3170 3130 3160
FADC250_ALLCH_DAC 3150 3120 3120 3150 3150 3140 3150 3150 3130 3160 3140 3170 3120 3170 3130 3160

3127 production, 20:22-21:07, target_type=dummy,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA
about 85k events only, but they are good events

changed target to Loop 1

3128 production, 21:11-22:41, target_type=Loop 1 10cm LD2,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA
3129 production, 22:42-02:35, target_type=Loop 1 10cm LD2,shms_p=6.538,shms_theta=11.91,hms_p=-3.944,hms_theta=17.5, I=70uA

changed target to Loop 2 LH2, then changed target to Loop 2 LH2.
HMS was rotated 20.57deg, SHMS was rotated to 8.46deg.

3130 production, 02:41-08:15, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=8.46,hms_p=-3.716,hms_theta=20.58,
3131 production, 08:16-12:41, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=8.46,hms_p=-3.716,hms_theta=20.58,
3132 production, 12:41-17:03, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=8.46,hms_p=-3.716,hms_theta=20.58,
no beam since 15:30, thunderstorems affect accelerator

changed target to dummy

3133 no beam, pedestal run, 17:05-17:05
3134 no beam, pedestal run, 17:07-17:07
3135 production, 17:11-21:06, target_type=dummy,shms_p=6.719,shms_theta=8.46,hms_p=-3.716,hms_theta=20.58,
no beam for the first 100k events
3136 production, 17:11-23:58, target_type=dummy,shms_p=6.719,shms_theta=8.46,hms_p=-3.716,hms_theta=20.58, I=40uA
no beam for the first 100k events
3137 production, 23:58-0:16, target_type=dummy,shms_p=6.719,shms_theta=8.46,hms_p=-3.716,hms_theta=20.58, I=40uA
SHMS rotated to 10.475deg at 0:08
3138 production, 0:16-1:09, target_type=dummy,shms_p=6.719,shms_theta=10.475,hms_p=-3.716,hms_theta=20.58, I=40uA
3139 production, 1:10-02:11, target_type=dummy,shms_p=6.719,shms_theta=10.475,hms_p=-3.716,hms_theta=20.58, I=40uA

changed target to Loop 2 10cm LH2

3140 production, 2:13-8:25, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=10.475,hms_p=-3.716,hms_theta=20.58, I=40uA
3141 no beam, pedestal run

08:43 HV is off
10:23 HV is ON

3142 no beam, pedestal run
3143 no beam, pedestal run

3144 production, 14:08-21:39, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=10.475,hms_p=-3.716,hms_theta=20.58, I=40uA
no beam during the first 100k events. Beam was on for just several minutes.
3145 production, 21:40-11:20, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=10.475,hms_p=-3.716,hms_theta=20.58, I=70uA
no beam during the first 100k events. beam started at 4:05
3146 production, 11:20-15:44, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=10.475,hms_p=-3.716,hms_theta=20.58, I=70uA
SHMS angle changed to 12.49 deg at 12:16

3147 production, 15:44-01:39 August 7th, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=12.49,hms_p=-3.716,hms_theta=20.58
daq rate 1.5kHz @ I=70uA
18:20 target changed to dummy
22:00 target changed to Loop 2 LH2, I=70uA

3148 production, 01:39-07:24 August 7th, target_type=Loop 2 10cm LH2,shms_p=6.719,shms_theta=12.49,hms_p=-3.716,hms_theta=20.58
beam stopped at 7:00

7:30 SHMS rotated 12.28 deg, HMS rotated to 15.06 deg, target was changed to Loop 1 10cm LD2

===================================================================
FADC250_W_WIDTH = 240 for both slot7 and slot8

3149 pedestal run, no beam
3150 pedestal run, no beam
3151 production, 07:34-13:32, target_type=Loop 1 10cm LD2,
shms_p=-5.127,shms_theta=12.29,hms_p=-5.309,hms_theta=15.04, I=75uA
From 10:47 to 11:11, target was changed to dummy (I=40uA), at
11:42 target was changed back to Loop 1 10cm LD2, I=75uA
At 12:42, SHMS was ratated to 14.29deg, at this angle, daq rate 5.5kHz
subrun 0-50: SHMS=12.29deg
subrun 51: SHMS=12.29deg and 14.29deg
subrun 52-60: SHMS=14.29deg

3152 production, 13:32-17:50 August 7th, target_type=Loop 1 10cm LD2,
shms_p=-5.127,shms_theta=14.29,hms_p=-5.309,hms_theta=15.04,
I=75uA, daq rate 5.5kHz
16:37 target changed to dummy, I=40uA
17:25 target changed to Loop 1 10cm LD2, I=75uA
17:42 SHMS rotated to 16.28deg, I=75uA, daq rate 5.5kHz

subrun 0-42:  SHMS=14.29deg
subrun 43: SHMS=14.29deg and 16.28deg
subrun 44-45: SHMS=16.28deg

3153 production, 17:50-19:26, target_type=Loop 1 10cm LD2, shms_p=-5.127,shms_theta=16.28,hms_p=-5.309,hms_theta=15.04,I=75uA

3154 production, 19:26-00:01, target_type=Loop 1 10cm LD2, shms_p=-5.127,shms_theta=16.28,hms_p=-5.309,hms_theta=15.04,I=75uA
23:35 changed to dummy target,I=40uA, daq rate 1.6kHz

3155 production, 00:02-00:33, target_type=dummy, shms_p=-5.127,shms_theta=16.28,hms_p=-5.309,hms_theta=15.04,I=40uA,
daq rate 1.6kHz, beam stopped at 00:14

20220808 00:14, rotated SHMS to 16.91 deg, HMS to 19.92 deg

3156 production, 00:37-01:48, target_type=dummy,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91,I=40uA,
daq rate 1.6kHz,
target changed to Loop 1 10cm LD2 at 01:16,
target_type=Loop 1 10cm LD2,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=75uA

3157 production, 00:37-03:11, target_type=Loop 1 10cm LD2,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=75uA
daq rate 5.6kHz

3158 production, 03:11-09:11, target_type=Loop 1 10cm LD2,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=75uA
no beam for the fisrt 100k events, daq rate 5.6kHz

3159 production, 09:11-10:09, target_type=Loop 1 10cm LD2,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=75uA
daq rate 5.6kHz

3160 production, 10:10-13:24, target_type=Loop 1 10cm LD2,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=75uA
daq rate 5.6kHz

3161 production, 13:24-15:44, target_type=Loop 1 10cm LD2,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=75uA
daq rate 5.6kHz
target changed to dummy at 15:18, I=40uA

3162 production, 15:44-16:32, target_type=dummy,shms_p=-5.512,shms_theta=16.94,hms_p=-4.752,hms_theta=19.91, I=40uA
beam stop at 16:03 to prepare for optic

16:09 target changed to single foil Carbon 0.5%, SHMS rotated to 6.8deg and HMS ratated to 12.5deg

3163 production, 16:32-17:22, target_type=Carbon 0.5%, shms_p=-8.55,shms_theta=6.8,hms_p=-5.587,hms_theta=12.48,I=75uA
no beam for the first 100k events, daq rate 160Hz

Target move to Optics 1 +/- 8cm, 2 Foils Carbon

3164 production, 17:22-17:47, target_type=Optics 1 z=+/-8cm, 2 Foil, shms_p=-8.55,shms_theta=6.8,hms_p=-5.587,hms_theta=12.48,I=50uA
no beam for the first 100k events, daq rate 80Hz

3165 production, 17:47-18:02, target_type=Optics 1 z=+/-8cm, 2 Foil, shms_p=-8.55,shms_theta=6.8,hms_p=-5.587,hms_theta=12.48,I=50uA
only 30k triggers

18:00 target changed to Loop 2 10cm LH2

3166 production, 18:05-18:57, target_type=Loop2 10cm LH2, shms_p=-8.55,shms_theta=6.8,hms_p=-5.587,hms_theta=12.48,
I=60uA (18:06), then 20uA(18:08) then 10uA(18:10)
daq rate 130Hz @20uA, 65Hz @10uA
SHMS rotated to 7.5deg at 18:28, shms_p=-8.55,shms_theta=7.5,hms_p=-5.587,hms_theta=12.48,I=15uA

18:57 Target changet to Optics 1 /- 8 cm
3167 production, 18:59-19:37, target_type=Optics 1 z=
/-8cm, shms_p=-8.55,shms_theta=7.5,hms_p=-5.587,hms_theta=12.48,I=50uA
daq rate 90Hz @50uA
target changed to Carbon 0.5% at 19:20, I=75uA

19:38 SHMS rotated to 8.3 deg

3168 production, 19:39-19:54, target_type=Carbon 0.5%, shms_p=-8.55,shms_theta=8.3,hms_p=-5.587,hms_theta=12.48,I=75uA

19:54 Target changet to Optics 1 +/- 8 cm

3169 production, 19:54-20:34, target_type=Optics 1 z=+/-8cm, shms_p=-8.55,shms_theta=8.3,hms_p=-5.587,hms_theta=12.48,I=50uA
no beam for the first 100k events,
daq rate 90Hz @50uA
20:24 target changed to Loop 2 10cm LH2, beam came back at 20:29

3170 production, 20:34-21:23, target_type=Loop 2 10cm LH2, shms_p=-8.55,shms_theta=8.3,hms_p=-5.587,hms_theta=12.48,I=20uA
daq rate 160Hz @20uA, beam stopped at 21:06

===================================================
HV map for FTBF beam test

HV for FADC channel 0 to 7:
  1. # SDU#4 SDU#5 THU#2 SDU#2 SDU#1 THU#1
    SC1 SC2 Ecal1 Ecal2 Ecal3 PrSh1 PrSh2 PrSh3
    -1260 -1280 -760 -860 -880 -1640 -1480 -1800 <<== 1~8GeV

This setting was also used for some 1GeV calibrations
-1260 -1300 -880 -920 -940 -1640 -1440 -1800 <<== <1GeV

---------------------------------------
4GeV calibration start
1009 Moved table to (1505, 337), center on the left block 51,563 events
1010 Moved table to (1389, 337), center on the right block 77621 events
1011 Moved table to (1447, 243), center on the top block 52034 events
4GeV calibration end
---------------------------------------

---------------------------------------
1GeV calibration start, MWPC 1 is not working
796 move to Top block, use this New HV: 1260, 1300, 880, 920, 940, 1640, 1440, 1800, FADC ch11 and ch12 swapped.
These two channels are down stream Cherenkov. After swapped, Down cherenkov inner PMT is in ch12.
797

798 move to left block, point B (1498,347)
799
800 beam on the center of the left block, point B
801
802 beam on the center of the right block, point C (1382,347)

803 beam on the center of the top block, point A (1440, 252)
1GeV calibration end
--------------------------------------- =====================================================

-----------------------------------------------
change HV to the same as FermiLab
  1. # SDU#4 SDU#5 THU#2 SDU#2 SDU#1 THU#1
    SC1 SC2 Ecal1 Ecal2 Ecal3 PrSh1 PrSh2 PrSh3
    -1260 -1280 -760 -860 -880 -1640 -1480 -1800 <<== 1~8GeV
    ===>

slot10.7(SDU#1) slot10.8(THU#1) slot10.9(SDU#2)
-1480 -1800 -1640

slot2.0(SDU#4) slot2.1(THU#2) slot2.2(SDU#5)
760 -880 -860
----------------------------------------------

21:40 SHMS rotated to 12.25deg, HMS rotated to 15.7deg


22:11 target changed to dummy

3171 production, 22:10-22:21,target_type=dummy,shms_p=-8.035,shms_theta=12.25,hms_p=-6.792,hms_theta=15.69,I=40uA
no beam at the first 100k triggers

22:34 SHMS rotated to 13.15deg, HMS rotated to 17.72deg

3172 production, 22:22-23:22,target_type=dummy,shms_p=-8.035,shms_theta=13.15,hms_p=-6.792,hms_theta=17.72,
no beam at the first 100k triggers, beam came at 22:32. only 9 minutes of dummy data
22:41 stopped beam to changed target to Loop 2 10cm LH2
22:46 beam came back and then went away at 22:53 due to HMS Q1 interlock,
23:12 beam came back again, shms_p=-8.035,shms_theta=13.15,hms_p=-6.792,hms_theta=17.72, I=60uA,
daq rate 1.1kHz, 10 minutes of LH2 data

3173 production, 23:22-23:52 August 8th,
target=Loop 2 10cm LH2, shms_p=-8.035,shms_theta=13.15,hms_p=-6.792,hms_theta=17.72, I=60uA
daq rate 1.1kHz
beam stopped at 23:38 then SHMS rotated to 14.02 deg and HMS rotated to 19.86deg
beam came back at 23:49, I=75uA, shms_p=-8.035,shms_theta=14.02,hms_p=-6.792,hms_theta=19.86,

subrun 0:  SHMS=13.15deg
subrun 1: SHMS=13.15deg and 14.02deg

3174 production, 23:52-02:03 August 9th,
target=Loop 2 10cm LH2, shms_p=-8.035,shms_theta=14.02,hms_p=-6.792,hms_theta=19.86, I=75uA
daq rate 1.9kHz
0:51 target changed to dummy, I=40uA,
01:16 SHMS rotated to 14.895deg, shms_p=-8.035,shms_theta=14.9,hms_p=-6.792,hms_theta=19.86, I=75uA
01:45 target changed to Loop 2 LH2, beam came back at 01:49 but stopped at 01:58
subrun 0-3 are for 14.02 deg SHMS
subrun 4 are for both 14.02 and 14.9 deg SHMS
subrun 5-6 are for 14.9 deg SHMS

3175 production, 02:03-08:35,target=Loop 2 10cm LH2, shms_p=-8.035,shms_theta=14.9,hms_p=-6.792,hms_theta=19.86,I=75uA
no beam at the first 100k triggers,beam came back at 03:18,
04:45, SHMS rotated to 15.785deg, shms_p=-8.035,shms_theta=15.79,hms_p=-6.792,hms_theta=19.86,I=70uA
06:05, target changed to dummy, I=40uA, took 8 minutes of data
06:25, SHMS rotated to 13.58deg, took 8 minutes of data for dummy, I=40uA,
06:47, changed target to Loop2 LH2, shms_p=-7.913,shms_theta=13.58,hms_p=-6.792,hms_theta=19.86,
08:00, SHMS rotated to 12.69deg, took 4 minutes of data till beam stopped at 08:04 to change pass,
shms_p=-8.035,shms_theta=12.69,hms_p=-6.792,hms_theta=16.03,I=70uA

==============================================================================================================
Aug 9th 08:05 Accelerator changed beam from 5-pass to 4-pass for Hall C. Beam energy is 8.494GeV

3176 pedestal, 100k pulse triggers, no beam
3177 pedestal, 100k pulse triggers, no beam

08:48 HMS rotated to 20.905deg, SHMS rotated to 6.93deg

3178 production, 09:02-15:08, target=Loop 2 LH2, shms_p=6.265,shms_theta=6.93,hms_p=-2.193,hms_theta=20.89,
no beam at the first 100k triggers,beam came back at 14:02,
14:00 target changed to Carbon Hole, I=5uA for 6 minutes,
14:18 target changed to Loop 2 LH2, I=35uA, beam came back at 14:20, daq rate 220Hz, beam stopped at 14:46

3179 production, 15:09-21:31, target=Loop 2 10cm LH2, shms_p=6.265,shms_theta=6.93,hms_p=-2.193,hms_theta=20.89,
no beam at the first 100k triggers,beam came back at 17:31, I=60uA

22:37 target changed to dummy

3180 production, 21:31-22:28, target=dummy, shms_p=6.265,shms_theta=6.93,hms_p=-2.193,hms_theta=20.89
no beam for the first 100k triggers,
21:35 beam arrived, beam current linear ran up from 3uA to 23uA at 21:55 to do Ion Chamber calibration
From 21:56, I=40UA till 22:15
22:15 SHMS rotated to 8.93 deg, beam came back at 22:20
target=dummy, shms_p=6.265,shms_theta=8.93,hms_p=-2.193,hms_theta=20.89

3181 production, 22:28-22:44, target=dummy, shms_p=6.265,shms_theta=8.93,hms_p=-2.193,hms_theta=20.89

22:46 target changed to Loop 2 LH2

3182 production, 22:48-00:05 August 10th,
target=Loop 2 10cm LH2, shms_p=6.265,shms_theta=8.93,hms_p=-2.193,hms_theta=20.89, I=80uA
no beam for the first 100k triggers,daq rate 770Hz

3183 production, 00:05-01:22,
target=Loop 2 10cm LH2, shms_p=6.265,shms_theta=8.93,hms_p=-2.193,hms_theta=20.89, I=80uA
daq rate 770Hz, beam stopped at 00:49 due to Vacuum issue at VBV3H08A

3184 pedestal, pulse run, 01:23-10:26, no beam for the whole run,1000006 events
3185 pedestal, pulse run, 11:29-11:29, no beam =========================================================================================
Add "PreSh_t && Shower_t" into TS#2, 20220810

3186 pedestal, pulse run, 14:54-15:19, no beam
3187 pedestal, pulse run, 15:47-15:47, no beam

16:00 SHMS rotated to 5.5 deg.

3188 production, 17:21-23:07, target=Loop 2 10cm LH2, shms_p=6.265,shms_theta=5.53,hms_p=-2.193,hms_theta=20.89,
no beam for the sirst 100k triggers, tune beam arrived at 17:52, real beam arrived at 21:34

23:09 Changed FADC slot8.9 DAC value from 3130 to 3440. After feed it into FIFO, its pedestal changed

3189 production,23:10-02:38 August 11th,
target=Loop 2 LH2, shms_p=6.265,shms_theta=5.53,hms_p=-2.193,hms_theta=20.89,I=30uA
daq rate 320Hz

3190 production,02:38-04:38, target=Loop 2 LH2, shms_p=6.265,shms_theta=5.53,hms_p=-2.193,hms_theta=20.89,I=30uA
daq rate 320Hz
03:05 target changed to dummy, I=40uA
03:45 HMS rotated to 28.41deg,
target=dummy,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41, I=40uA, daq rate 320Hz

3191 production, 04:39-09:03, target=dummy,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
I=40uA, daq rate 320Hz
4:50 target chagned to Loop 2 LH2, I=35uA
target=Loop 2 LH2, shms_p=6.265,shms_theta=5.53,hms_p=-2.193,hms_theta=28.41,I=35uA
Acceleration maintenence started from 6:30

3192 production, 19:55-01:52 August 12th, target=Loop 2 LH2,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
no beam for the first 100k triggers, tune beam came back at 23:32

3193 production, 01:52-09:28, target=Loop 2 LH2,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
daq rate = 400Hz @ I=38uA. Beam stopped at 09:10

09:21 A beam energy measurement is scheduled at 9:30-ish AM. Target parked at 'home'.
11:29 Target changed to Loop 2 LH2

3194 production, 11:35-12:26, target=Loop 2 LH2,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
no beam for the first 100k triggers, beam came back at 11:50 and went away at 12:01

3195 production, 14:05-14:41, target=Loop 2 LH2,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
daq rate = 400Hz @ I=38uA.

3196 production, 14:42-16:46, target=Loop 2 LH2,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
no beam for the first 100k triggers, beam came back at 14:49
beam stopped at 16:12

3197 production, 16:49-00:54 August 13th, target=Loop 2 LH2,
shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
no beam for the first 100k triggers, beam came back at 17:48

3198 production, 00:54-02:28, target=Loop 2 LH2,shms_p=6.538,shms_theta=5.53,hms_p=-1.882,hms_theta=28.41,
daq rate = 450Hz @ I=40uA.
01:09 SHMS rotated to 7.47 deg, trying to ramp beam current up to 80uA
subrun 0: 5.53deg and 7.47deg
subrun 1-3: 7.47deg

3199 production, 02:28-12:05, target=Loop 2 LH2,shms_p=6.538,shms_theta=7.47,hms_p=-1.882,hms_theta=28.41,
daq rate = 1024Hz @ I=79uA.

3200 production, 12:05-14:42, target=Loop 2 LH2,shms_p=6.538,shms_theta=7.47,hms_p=-1.882,hms_theta=28.41,
daq rate = 1024Hz @ I=79uA.
14:28 target changed to dummy, I=40uA, daq rate 320Hz

3201 production, 14:42-16:01, target=dummy,shms_p=6.538,shms_theta=7.47,hms_p=-1.882,hms_theta=28.41,
I=40uA, daq rate 320Hz

16:01 SHMS rotated to 9.5deg, target changed to Loop 2 LH2

3202 production, 14:01-17:29, target=Loop 2 LH2,shms_p=6.538,shms_theta=9.5,hms_p=-1.882,hms_theta=28.41,
no beam for the first 100k triggers, beam came back 16:04
daq rate = 1024Hz @ I=79uA.
beam stopped at 17:13, 4th pass separation issue

3203 production, 17:37-00:35 August 14th, target=Loop 2 LH2,shms_p=6.538,shms_theta=9.5,hms_p=-1.882,hms_theta=28.41,
no beam for the first 100k triggers, beam came back 17:41
daq rate 1.5kHz @ I=80uA

3204 production, 00:35-03:53 August 14th, target=Loop 2 LH2,shms_p=6.538,shms_theta=9.5,hms_p=-1.882,hms_theta=28.41,
daq rate 1.5kHz @ I=80uA
03:31 target changed to dummy, I=40uA

3205 production, 03:53-04:13, target=dummy,shms_p=6.538,shms_theta=9.5,hms_p=-1.882,hms_theta=28.41,
I=40uA, daq rate 512Hz

3206 production, 04:13-04:31, target=dummy,shms_p=6.538,shms_theta=9.5,hms_p=-1.882,hms_theta=28.41,
I=40uA, daq rate 512Hz

04:38 target changed to Loop 2 LH2
04:50 SHMS rotated to 8.93 deg, HMS rotated to 20.89deg

3207 production, 05:01-13:02, target=Loop 2 LH2,shms_p=6.265,shms_theta=8.93,hms_p=-2.193,hms_theta=20.89,
no beam for the first 100k triggers, beam came back 7:35, I=80uA
beam stopped at 10:32, then came back at 12:15
~11:00 SHMS rotated to 30.02deg, HMS rotated to 19.56deg
target=Loop 2 LH2,shms_p=3.731,shms_theta=30.02,hms_p=-5.587,hms_theta=19.56
---> SHMS=8.93deg for subrun 0-3, SHMS=30.02deg for subrun 5 to 10, subrun 4 contains both angles <---

3208 production, 13:02-13:14, target=Loop 2 LH2,shms_p=3.731,shms_theta=30.02,hms_p=-5.587,hms_theta=19.56,I=80uA
At 13:07, target changed to dummy, I=40uA. Only 2 minutes of LH2 target then 2 minutes of dummy target

3209 production, 13:14-13:25, target=dummy,shms_p=3.731,shms_theta=30.02,hms_p=-5.587,hms_theta=19.56,
daq rate 1.5kHz @ I=40uA

3210 production, 13:25-13:30, target=dummy,shms_p=3.731,shms_theta=30.02,hms_p=-5.587,hms_theta=19.56,
daq rate 1.5kHz @ I=40uA, only 2 minutes of data then beam stopped for target change

13:32 target changed to Loop 2 LH2,
13:32 SHMS rotated to 28.355deg. HMS rotated to 20.905deg

3211 production, 13:33-13:44, target=Loop 2 LH2, shms_p=3.996,shms_theta=28.40,hms_p=-5.321,hms_theta=20.91,
daq rate 1.8kHz @ I=80uA, beam stopped at 13:41

3212 production, 13:45-14:39, target=Loop 2 LH2, shms_p=3.996,shms_theta=28.40,hms_p=-5.321,hms_theta=20.91,
daq rate 1.8kHz @ I=80uA,
I stopped coda at 13:44 for previous run because HallC coda was stopped at 13:41 in order to adjust
SHMS angle from 28.44 to 28.355.
I was taking data during this adjustment. This change should not affect the ecal setup.

14:40 target changed to dummy

3213 production, 14:41-14:58. target=dummy, shms_p=3.996,shms_theta=28.355,hms_p=-5.321,hms_theta=20.91,
I=40uA, daq rate 620Hz

15:00 target changed to Loop 2 LH2,
15:30 Set HMS angle to 15.065 and SHMS angle to 9.455 deg, but stayed at 15.05 deg and 9.53deg

3214 production, 15:01-17:03, target=Loop 2 LH2, shms_p=-7.559,shms_theta=9.53,hms_p=-6.477,hms_theta=15.05,
no beam for the first 100k triggers, beam came back 15:37, I=20uA
15:51 target changed to dummy,shms_p=-7.559,shms_theta=9.53,hms_p=-6.477,hms_theta=15.05,
16:38 SHMS rotated to 11.97 deg,HMS rotated to 15.62 deg
target=dummy, shms_p=-7.106,shms_theta=11.97,hms_p=-5.878,hms_theta=15.62,
17:02 target changed to Loop 2 LH2, shms_p=-7.106,shms_theta=11.97,hms_p=-5.878,hms_theta=15.62,
subrun 0: SHMS=9.455deg and 11.97deg
subrun 1: SHMS=11.97deg

3215 production, 17:05-17:50, target=Loop 2 LH2, shms_p=-7.106,shms_theta=11.97,hms_p=-5.878,hms_theta=15.62,
no beam for the first 100k triggers, beam came back at 15:11, I=10uA,
beam went away at 17:24 due to injector problem, only 3~4 minutes of beam in this run, 175k events

3216 production, 17:57-19:49, target=Loop 2 LH2, shms_p=-7.106,shms_theta=11.97,hms_p=-5.878,hms_theta=15.62,
no beam for the first 100k triggers, beam came back at 18:17, I=10uA till 18:45
18:47 SHMS rotated to 13.92, HMS rotated to 17.96deg, beam came at 19:13, I=55uA
target=Loop 2 LH2, shms_p=-6.72,shms_theta=13.92,hms_p=-5.878,hms_theta=17.96,
subrun 0: SHMS=11.97deg and 13.92deg
subrun 1-4: SHMS=13.92deg

3217 production, 19:49-19:54, target=Loop 2 LH2, shms_p=-6.72,shms_theta=13.92,hms_p=-5.878,hms_theta=17.96,
beam stopped at 19:51, only 256k events

19:56 target changed to dummy

3218 production, 19:57-20:11, target=dummy, shms_p=-6.72,shms_theta=13.92,hms_p=-5.878,hms_theta=17.96,

20:12 SHMS rotated to 14.82 deg, HMS rotated to 20.37deg

3219 production, 20:13-20:36, target=dummy, shms_p=-6.538,shms_theta=14.82,hms_p=-5.878,hms_theta=20.37,
no beam for the first 100k triggers, beam came back at 20:20, I=40uA, daq rate 1920Hz

20:35 target changed to Loop 2 LH2

3220 production, 20:40:21:16, target=Loop 2 LH2, shms_p=-6.538,shms_theta=14.82,hms_p=-5.878,hms_theta=20.37,
no beam for the first 100k triggers, beam came back at 20:42, I=80uA,
beam stopped at 21:12 to prepare optics runs

21:18 HMS rotated to 13 deg, target changed to Carbon 0.5%

3221 production, 21:16-22:05, target=Carbon 0.5%,
Sieve Optics,shms_p=-6.538,shms_theta=14.82,hms_p=-5.878,hms_theta=12.98,
no beam for the first 100k triggers, beam came back at 21:30,
I=4.5uA --> daq rate 64Hz,
I=13uA --> daq rate 192Hz,
I=80uA --> daq rate 1216Hz,
22:02 target changed to optics 1, Carbon +/- 8cm, I=3uA

3222 production, 22:05-23:21, target=Opitcs 1, Carbon 2-foils +/- 8cm,
Sieve Optics,shms_p=-6.538,shms_theta=14.82,hms_p=-5.878,hms_theta=12.98,
ramp currunet from 2uA till 40 uA
I= 10uA --> daq rate 128Hz
I= 15uA --> daq rate 192Hz
I= 20uA --> daq rate 256Hz
I= 49.5uA --> daq rate 576Hz

23:24 target changed to Loop LH2
23:30 SHMS rotated to 16.100deg, HMS rotated to 17.235deg

3223 production, 23:27-00:06, target=Loop 2 LH2, shms_p=-6,shms_theta=16.17,hms_p=-5.587,hms_theta=17.23,
no beam for the first 100k triggers, beam came back 23:47,
daq rate is 1.2kHz @ I=25uA

3224 production, 00:06-00:30, target=Loop 2 LH2, shms_p=-6,shms_theta=16.17,hms_p=-5.587,hms_theta=17.23,
daq rate is 1.280Hz @ I=25uA

00:30 target changed to dummy

3225 production, 00:32-01:24, target=dummy, shms_p=-6,shms_theta=16.17,hms_p=-5.587,hms_theta=17.23,
no beam for the first 100k triggers, beam came back 00:35,not staple until 00:42
daq rate 1.8 kHz @ I=40uA

3226 production, 01:24-01:36, target=dummy, shms_p=-6,shms_theta=16.17,hms_p=-5.587,hms_theta=17.23,

01:38 SHMS rotated to 19.20deg, HMS rotated to 19.505deg

3227 production, 01:39-03:02, target=dummy, shms_p=-5.646,shms_theta=19.28,hms_p=-5.587,hms_theta=19.5,
no beam for the first 100k triggers, beam came back 02:42,

03:05 changed target to Loop 2 LH2

3228 production, 03:04-03:48, target=Loop 2 LH2,shms_p=-5.646,shms_theta=19.28,hms_p=-5.587,hms_theta=19.5,
daq rate 3.7 kHz I=73uA
daq rate 3.9 kHz
I=77uA

03:51 SHMS Rotated to 23.3 degrees, HMS Rotated to 21.875 degrees

3229 production, 03:53-5:44, target=Loop 2 LH2, shms_p=-4.902,shms_theta=23.2,hms_p=-5.587,hms_theta=21.875,
no beam for the first 100k triggers, beam came back at 04:37,
daq rate 3.9 kHz @ I=77uA

05:45 changed target to dummy

3230 production, 05:48-06:04, target=dummy, shms_p=-4.902,shms_theta=23.2,hms_p=-5.587,hms_theta=21.875,
no beam for the first 100k triggers, beam came back at 05:53, stopped at 5:58
daq rate 1.8 kHz @ I=40uA

3231 production, 6:06-06:18, target=dummy, shms_p=-4.902,shms_theta=23.2,hms_p=-5.587,hms_theta=21.875,
daq rate 1.8 kHz @ I=40uA

06:18 Rotated SHMS to 25.1 deg, rotated HMS to 40 deg, change momenta for both of them,

3232 pedestal run, internal pulse, no beam since 06:18
Something went wrong, Hall C configuration change could not finish within 45 minutes and further more
the injector has some problem. HallC has been scheduled a controlled access up to six hours from 8AM
for the aerogel exchange.

11:46 target changed to Loop 2 LH2
12:40 SHMS rotated to 18.9deg, HMS rotaed to 12.11deg

3233 production, 13:36-14:03, target=Loop 2 LH2, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,
daq rate 4.0 kHz @ I=79uA

3234 production, 14:03-15:10, target=Loop 2 LH2, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,
daq rate 3.9 kHz @ I=77uA

3235 production, 15:11-15:53, target=Loop 2 LH2, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,

3236 production, 15:53-16:15, target=Loop 2 LH2, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,

3237 production, 16:16-17:58, target=Loop 2 LH2, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,
no beam for the first 100k triggers, beam came back at 16:40,
daq rate 4.0 kHz @ I=79uA

18:00 changed target to dummy

3238 production, 18:02-18:16, target=dummy, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,
no beam for the first 100k triggers, beam came back at 18:04,
daq rate 1.9 kHz @ I=40uA

3239 production, 18:17-19:09, target=dummy, shms_p=2.792,shms_theta=18.9,hms_p=-5.587,hms_theta=12.11,
daq rate 1.9 kHz @ I=40uA

19:10 target changed to Loop 2 10 cm LH2
19:12 SHMS rotated to 21.22deg

3240 production, 19:14-20:38, target=Loop 2 LH2, shms_p=2.792,shms_theta=21.22,hms_p=-5.587,hms_theta=12.11,
daq rate 4.0 kHz @ I=79uA

3241 production, 20:39-21:41, target=Loop 2 LH2, shms_p=2.792,shms_theta=21.22,hms_p=-5.587,hms_theta=12.11,
daq rate 4.0 kHz @ I=79uA
21:35 target changed to dummy, beam came back at 21:40,
the last one minutes is dummy events, I=40uA, daq rate 1.8kHz

3242 production, 21:41-22:14, target=dummy, shms_p=2.792,shms_theta=21.22,hms_p=-5.587,hms_theta=12.11,
I=40uA, daq rate 1.8kHz

22:15 target changed to Loop 2 LH2, SHMS rotated to 23.215deg, actually it is 22.9deg

3243 production, 22:17-23:28, target=LH2, shms_p=2.792,shms_theta=22.9,hms_p=-5.587,hms_theta=12.11,
I=76uA, daq rate 3.9kHz

3244 production, 23:28-00:05, target=LH2, shms_p=2.792,shms_theta=22.9,hms_p=-5.587,hms_theta=12.11, I=80uA
23:35 beam stopped, changed to dummy target, beam came back at 23:44, I=40uA
subrun 0 --> LH2
subrun 1 --> part LH2 and part dummy
subrun 2 --> dummy

00:11 SHMS rotated to 21.22 deg on camera(true angle is 20.9 after subtracting offset), target changed to LH2
The SHMS angle in HallC log is 22.17, that is a typo

3245 production, 00:05-00:51, target=LH2, shms_p=2.792,shms_theta=20.9,hms_p=-5.587,hms_theta=12.11
no beam for the first 100k triggers, beam came back at 00:16,
beam went away at 00:25 due to accelerator issue, 129k events

3246 production, 00:59-04:21, target=LH2, shms_p=2.792,shms_theta=20.9,hms_p=-5.587,hms_theta=12.11
no beam for the first 100k triggers, beam came back at 03:15,
1kHz I=20uA
3.2kHz
I=65uA

3247 production, 04:21-05:02, target=LH2, shms_p=2.792,shms_theta=20.9,hms_p=-5.587,hms_theta=12.11
1.4kHz @ I=29uA

05:03 changed to dummy target

3248 production, 05:07-05:36, target=dummy, shms_p=2.792,shms_theta=20.9,hms_p=-5.587,hms_theta=12.11
1.4kHz @ I=30uA

3249 production, 05:37-10:28, target=dummy, shms_p=2.792,shms_theta=20.9,hms_p=-5.587,hms_theta=12.11
no beam for the first 100k triggers, beam came back at 5:55 last till 6:03.
Since 6:03, HMS Q1 was tripped, Hall C could not take beam.
06:37 target changed to LH2
08:03, beam was back again, I=12uA, target=LH2, shms_p=2.792,shms_theta=20.9,hms_p=-5.587,hms_theta=12.11,
09:10, beam stopped for pass changed
subrun 0 has both dummy and LH2 target
subrun 1 and 2 are for LH2 target only

=======================================================================================================
09:15 August 16th, started to change to 3-pass beam , E = 6.399 GeV

09:30 SHMS rotated to 17.91 deg, camera shows 18.23 due to the encoder offset 0.32.

12:00 Reset SHMS angle offset to zero so the camera shows the same value as the encoder.
Set the SHMS to 17.86 degrees and the HMS to 18.31.
3250 pedestal, pulse run, cosmic 12:42 August 16th - 12:05 August 17th, 100203 events
3251 pedestal, pulse run, cosmic, 12:41-14:38, 1000021 events

memeory upgraded to 24G in daq machine tunl11.jlab.org

tune beam came back to Hall C
17:17 target changed to carbon hole

3252 16:58-17:04 pedestal, pulse run,
3253-3255 debug daq, trash

17:48 target changed to Loop2 LH2

3256 17:52-18:01 pedestal, pulse run, debug daq, good for pedestal only

3257 production, 18:08-18:16, target=LH2,shms_p=2.412,shms_theta=17.86,hms_p=-3.921,hms_theta=13.81,

3258 production, 18:22-19:35, target=LH2,shms_p=2.412,shms_theta=17.86,hms_p=-3.921,hms_theta=13.81,
daq rate 1152Hz I=25uA
daq rate 2.3kHz
I=50uA

19:36 target changed to dummy

3259 production, 19:36-20:02, target=dummy,shms_p=2.412,shms_theta=17.86,hms_p=-3.921,hms_theta=13.81,
no beam for the first 100k triggers, beam came back at 19:40,
daq rate 1664Hz @ I=40uA

20:02 SHMS rotated to 19.86 deg

3260 production, 20:03-20:24, target=dummy, shms_p=2.412,shms_theta=19.86,hms_p=-3.921,hms_theta=13.81,
no beam for the first 100k triggers, beam came back at 20:07,
daq rate 1664Hz @ I=40uA

20:24 target changed to LH2

3261 production, 20:26-20:35, target=LH2, shms_p=2.412,shms_theta=19.86,hms_p=-3.921,hms_theta=13.81,
no beam for the first 100k triggers, beam came back at 20:28,

3262 production, 20:42-21:01, target=Loop 2 LH2, shms_p=2.412,shms_theta=19.86,hms_p=-3.921,hms_theta=13.81,
daq rate 2.7kHz @ I=60uA

3263 production, 21:03-21:39, target=Loop 2 LH2, shms_p=2.412,shms_theta=19.86,hms_p=-3.921,hms_theta=13.81,
no beam for the first 100k triggers, beam came back at 21:16,
daq rate 2.7kHz @ I=60uA

3264 production, 21:39-21:52, target=Loop 2 LH2, shms_p=2.412,shms_theta=19.86,hms_p=-3.921,hms_theta=13.81,
daq rate 2.7kHz @ I=60uA

3265 production, 21:54-22:23, target=Loop 2 LH2, shms_p=2.412,shms_theta=19.86,hms_p=-3.921,hms_theta=13.81,
daq rate 2.8kHz @ I=60uA

-------- 22:25 SHMS spectrometer change to 21.85-------------

3266 production, 22:28-22:47, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81,
daq rate 3.2kHz I=70uA. Note, it seems they were pushing to reach 80 uA, so the current and rate is may fluctuate
3267 production, 22:47-23:14, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81
daq rate 3.6kHz
I=80uA
no beam for the first 100k triggers, beam came back at 22:49
3268 production, 23:15-23:43, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81
daq rate 3.6kHz I=80uA
3269 production, 23:43-23:55, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81
daq rate 3.6kHz
I=80uA
3270 production, 23:56-24:04, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81
daq rate 3.60kHz @ I=0uA
no beam for the first 100k triggers, beam was off for 10 minutes due to accelerator issues

3271 production, 00:07-00:15, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81
daq rate 3.6kHz @ I=80uA

---------- 00:20 Switch target to Dummy ---------

3272 production, 00:19-00:45, target=10 cm Dummy, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.81
no beam for the first 100k triggers, beam returned at 00:24
daq rate 1.6kHz @ I=40uA

---------00:50 Switch target to LH2-------

3273 production, 00:56-02:22, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.85,hms_p=-3.921,hms_theta=13.8
daq rate 1.8kHz @ I=40uA

3274 production, 02:23-3:04, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.86,hms_p=-3.921,hms_theta=13.8
daq rate 850Hz I=20uA
daq rate 512Hz
I=12uA

3275 production, 03:04-04:44, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.86,hms_p=-3.921,hms_theta=13.8
daq rate 512Hz @ I=12uA

3276 production, 04:44-8:49, target=Loop 2 LH2, shms_p=2.412,shms_theta=21.86,hms_p=-3.921,hms_theta=13.8
daq rate 512Hz @ I=12uA
HallC was doing FADC dead time study. current changed from 12uA, to 60uA then to 30uA

06:27 HMS rotated to 18.595deg, SHMS roated to 37.97deg
07:00 I=75UA, target=LH2, shms_p=2.412,shms_theta=38,hms_p=-4.752,hms_theta=18.61,
07:28 target changed to dummy, I=40uA
07:48 HMS rotated to 21.095deg, SHMS rotated to 34.465deg
target=dummy, shms_p=2.792,shms_theta=34.49,hms_p=-4.391,hms_theta=21.11,
08:15 target changed to LH2, I=75uA
target=LH2, shms_p=2.792,shms_theta=34.49,hms_p=-4.391,hms_theta=21.11,
subrun   0-6: SHMS=21.86deg
subrun 7: SHMS=21.86deg and 37.97deg
subrun 8-11: SHMS=37.97deg
subrun 12: SHMS=37.97deg and 34.49deg
subrun 13-16: SHMS=34.49deg

08:59 HMS rotated to 26.55deg, SHMS rotated to 28.46deg

3277 production, 08:53-10:45, target=LH2, shms_p=3.493,shms_theta=28.47,hms_p=-3.727,hms_theta=26.56,
no beam for the first 100k triggers, beam returned at 09:30, I=75uA
10:10 target changed to dummy, I=40uA
10:27 beam stopped

===================20020818 Install VTP board=========================
From here EPICS variables are inserted into ER

SHMS at 7.66deg and HMS at 28.78deg.

3278-3283 debug daq runs. HV are off. no beam. good for pedestal
HV are turned on in the middle of run 3283, but no beam after HV is on.

3284 production, 20:20-23:14, target=LH2,shms_p=4.605,shms_theta=7.66,hms_p=-1.727,hms_theta=28.78,
no beam for the first 100k triggers, beam came back at 21:11
daq rate 750Hz I=75UA
22:00 target changed to dummy
22:40 SHMS rotated to 9.66deg, target changed to LH2
target=LH2,shms_p=4.605,shms_theta=9.66,hms_p=-1.727,hms_theta=28.78,
daq rate 1235Hz
I=75UA
subrun 0 contains data for SHMS=7.66deg
subrun 1 contains data for both 7.66deg and 9.66
subrun 2-3 contains data for SHMS=9.66deg

3285 production, 23:19-00:52 August 19th, target=LH2,shms_p=4.605,shms_theta=9.66,hms_p=-1.727,hms_theta=28.78,
daq rate 1235Hz @ I=75UA

3286 production, 00:54-05:28, target=LH2,shms_p=4.605,shms_theta=9.66,hms_p=-1.727,hms_theta=28.78,
coda lost roc3 at 01:15 and did not take data since then.
03:00 changed target to dummy
03:23 SHMS rotated to 11.66deg,
03:50 target changed to LH2,shms_p=4.605,shms_theta=11.67,hms_p=-1.727,hms_theta=28.78,

3287 production, 05:29-12:57,target=LH2, shms_p=4.605,shms_theta=11.67,hms_p=-1.727,hms_theta=28.78,
8:25 SHMS rotated to 10deg and HMS to 42.23deg
target=LH2,shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
no beam between 10:09 and 11:20
daq rate 1.5kHz @ I=77uA
subrun 0-19: 11.67deg
subrun 20: 11.67deg and 10deg
subrun 21-29: 10deg

3288 production, 12:57-18:12, target=LH2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 1.5kHz @ I=77uA

3289 production, 18:14-18:31, target=LH2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 1.5kHz @ I=77uA

3290 production, 18:31-00:06 August 20th, target=LH2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 1.5kHz I=77uA
22:09 target changed to dummy, I=40uA
daq rate 512Hz
I=40uA

3291 production, 00:08-00:34 August 20th, target=dummy, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 512Hz @ I=40uA
0:26 target changed to LD2
Ion chamber calibration start from 00:31

3292 production, 00:34-00:49 August 20th, target=LD2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
beam current ramped up from 0 to 32uA for Ion chamber calibration

3293 production, 00:50-08:50 August 20th, target=LD2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 3.2kHz @ I=77uA

3294 production, 08:51-14:18 August 20th, target=LD2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 3.2kHz I=77uA
10:36 SHMS rotated to 8deg,
target=LD2, shms_p=5.127,shms_theta=8,hms_p=-1.158,hms_theta=42.26, daq rate 2.0kHz
I=78.5uA

subrun 0-12: SHMS=10 deg
subrun 13: SHMS=10 deg and 8 deg
subrun 14-30: SHMS=8deg

3295 production, 14:18-01:19 August 21st, target=LD2, shms_p=5.127,shms_theta=8,hms_p=-1.158,hms_theta=42.26,
daq rate 2.0kHz @ I=78.5uA
00:18 taret changed to dummy, I=40uA

subrun 0-48: LD2
subrun 49: LD2 and dummy
subrun 50: dummy

3296 production, 14:18-01:21 August 21st, target=dummy, shms_p=5.127,shms_theta=8,hms_p=-1.158,hms_theta=42.26,
just 106k events

3297 production, 01:24-02:54 August 21st, target=dummy, shms_p=5.127,shms_theta=8,hms_p=-1.158,hms_theta=42.26,
daq rate 500Hz @ I=40uA
02:36 changed to LH2 target, I=80uA

3298 production, 02:55-14:46 August 21st, target=LH2, shms_p=5.127,shms_theta=8,hms_p=-1.158,hms_theta=42.26,
daq rate 1000Hz @ I=78uA

3299 production, 14:46-19:00 August 21st, target=LH2, shms_p=5.127,shms_theta=8,hms_p=-1.158,hms_theta=42.26,
daq rate 1000Hz @ I=78uA

19:01 SHMS rotated to 10deg

3300 production, 19:02-00:57 August 22th, target=LH2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 1500Hz @ I=78uA
23:47 target changed to LD2

3301 production, 00:57-02:51 August 22nd, target=LD2, shms_p=5.127,shms_theta=10,hms_p=-1.158,hms_theta=42.26,
daq rate 3.5 kHz @ I=80uA
beam stopped at 02:41

02:55 target changed to LH2
03:00 SHMS rotated to 7.5deg, HMS rotated to 29.55deg

03:00 HMS Q1 interlock happened and SHMS Dipole did not response. Hall is in controlled access.
05:00 Accelerator fire alarm, no beam.

3302 pedestal, 02:51-09:09 August 22nd, no beam

10:50 SHMS rotated to 5.5deg,

3303 production, 15:01-01:04 August 23rd, target=LH2, shms_p=5.422,shms_theta=5.49,hms_p=-0.96,hms_theta=29.57,
no beam until 16:20
daq rate 500Hz @ I=40uA

3304 production, 01:04-04:02 August 23rd, target=LH2, shms_p=5.422,shms_theta=5.49,hms_p=-0.96,hms_theta=29.57,
daq rate 500Hz @ I=40uA
03:00 changed to dummy target
beam stop at 03:15, Trim rack W301B13 negative bulk supply fail

3305 production, 04:04-11:33 August 23rd, target=dummy, shms_p=5.422,shms_theta=5.49,hms_p=-0.96,hms_theta=29.57,
no beam at the beginning until 04:58
06:25 target changed to LD2
11:23 target changed to 'home' (absolute empty) for BCM calibration

==================================================================================
run 3171-3305 were using the same HV as FermiLab, but the HV for Shower_L is too low,
the amplitude of the signal is about 10mv.

Here is the new HVs:
Slot 2
Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD
HV: 1080 1100 930 1050 1050 1050 1050

Slot 10
Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2)
HV: 1600 1600 1700 1750 850 1000 1950 1550 1800 1750

12:54 target changed to Loop 1 10cm LD2

3306 procudtion, 12:55-14:20 August 23rd, target=LD2, shms_p=5.422,shms_theta=5.49,hms_p=-0.96,hms_theta=29.57,
no beam for the first 100k triggers, beam came back at 13:18
daq rate = 2.7kHz I=31uA
daq rate = 3.0kHz
I=33uA
This daq rate is too high comparing to run 3307. The beam might scratch the target frame.

==========HV changed=======
Lower HVs for preshower_top and all 3 Ecal blocks

Slot 2
Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD
HV: 1030 1050 900 1050 1050 1050 1050

Slot 10
Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2)
HV: 1600 1600 1700 1750 850 1000 1950 1550 1800 1700

3307 procudtion, 14:23-18:23 August 23rd, target=LD2, shms_p=5.422,shms_theta=5.49,hms_p=-0.96,hms_theta=29.57,
daq rate = 1.7kHz @ I=31uA

==========HV changed=======
18:24 Adjusted TOP preshower (-40V) and top shower HVs (-30V)

Slot 2
Name: Shower_L(SDU#4), Shower_R(THU#2), Shower_T(SDU#5), CherA, CherB, CherC, CherD
HV: 1030 1050 870 1050 1050 1050 1050

Slot 10
Name: SC0_T, SC0_B, SC1_T, SC1_B, LASPD_T, LASPD_B, SPD, Preshower_L(SDU#1), Preshower_R(THU#1), Preshower_T(SDU#2)
HV: 1600 1600 1700 1750 850 1000 1950 1550 1800 1660

3308 procudtion, 18:25-18:34 August 23rd, target=LD2, shms_p=5.422,shms_theta=5.49,hms_p=-0.96,hms_theta=29.57,
daq rate = 1.0kHz @ I=31uA

==========HV changed=======
SC1_top 1700 > 1680
Top preshower 1660
> 1640
Top SHower 870 -> 850

06:45 SHMS rotated to 7.5 deg

3309 procudtion, 18:48-20:08 August 23rd, target=LD2, shms_p=5.422,shms_theta=7.5,hms_p=-0.96,hms_theta=29.57,
no beam for the first 100k triggers, beam came back at 19:36
beam stopped at 19:54 due to accelerator issue.

3310 production, 20:11-03:17 August 24th, target=LD2, shms_p=5.422,shms_theta=7.5,hms_p=-0.96,hms_theta=29.57,
daq rate 1.7kHz @I=80uA

3311 procudtion, 03:17-12:33 August 24th, target=LD2, shms_p=5.422,shms_theta=7.5,hms_p=-0.96,hms_theta=29.57,
no beam for the first 100k triggers, beam came back at 03:18
daq rate 1.7kHz @I=80uA
8:38 changed target to dummy, I=40uA
10:40 changed target to 'home'(absolute empty) for beam energy measurement, I=100nA, daq rate=1.2kHz

3312 trash, 12:38-12:44 August 24th, target=empty(?), shms_p=5.422,shms_theta=7.5,hms_p=-0.96,hms_theta=29.57,
daq rate=1.2kHz @ I=0.1uA, the beam must have scratched something, 173k events
beam energy measurement result: beam = 6394.694 +/- 3.055 MeV

15:42 changed target to Loop2 LH2

3313 procudtion, 12:52-01:06 August 25th, target=LH2, shms_p=5.422,shms_theta=7.5,hms_p=-0.96,hms_theta=29.57,
no beam for the first 100k triggers, beam came back at 15:38
daq rate=750Hz @ I=78uA,

3314 procudtion, 01:07-08:56 August 25th, target=LH2, shms_p=5.422,shms_theta=7.5,hms_p=-0.96,hms_theta=29.57,
daq rate=750Hz @ I=78uA,
03:00 Rotated SHMS to 26.82 deg, HMS to 28.41 deg, shms_p=3.706,shms_theta=26.82,hms_p=-3.514,hms_theta=28.41,
04:16 changed target to dummy, I=40uA
04:35 Rotated SHMS to 23.13 deg, HMS to 33.37 deg, shms_p=4.22,shms_theta=23.13,hms_p=-3.014,hms_theta=33.37,
05:15 changed target to LH2

3315 procudtion, 08:57-10:27 August 25th, target=LH2, shms_p=4.22,shms_theta=23.13,hms_p=-3.014,hms_theta=33.37,
daq rate=3.0kHz @ I=78uA,
beam stopped at 09:03, 777k evnets

09:30 Rotated SHMS to 8.0 deg and HMS to 42.23deg

SBSVME22 lost connection. USB stick failed. No access until next accelerator maintenance day.
can not control MPOD utill the 20220916. ==============================================================================================

3318 pedestal, test daq, no beam, HV on
3319 pedestal, test daq, no beam, HV on

20220917 23:23

3320 gem pedestal run, GEM HV was not on for this run

3321 trash run, pulser event enabled, unable to check GEM signal

first 100k pulse event are disabled

3322 beam seems stopped
23:51 still no beam
00:28 no beam
01:50 still no beam
02:22 beam delivery suspended due to transport ion chamber failure

3323 Latency check, initial latency value 49
3324 initial latency value 49 -- (49 is too late)
3325 & 3326 scan for value 52
3327 & 3328 scan for value 55 -- (this seems good, also consistent with Ezekiel's INFN setup)
3329 & 3330 & 3331 & 3332 scan for value 58 (seems too early)
3333 & 3334 scan for value 64 -- (64 is too early)
3335 & 3336 scan for value 60 -- (too early)

3337 production, 00:25 - 11:06 Sep. 19th, run with new GEM latency 55, (55 is too early)

3338 procudtion, 11:24 Sep 19th - 18:34 Sep. 20th, run with slightly modifed latency 52.
target=Fe, shms_p=-8.55,shms_theta=8.3,hms_p=1.82,hms_theta=48.3,
13:10 Sep 19th, changed target to B10
14:16 Sep 19th, changed target to B4C-11
16:00 Sep 19th, beam stopped till 00:24 Sep 20th
05:03 Sep 20th, changed target to Ca40, HMS roated to 66.4deg, HMS_p was set to 1.325
target=Ca40,shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
09:00 Sep 20th, RF study started, no beam till 21:12

3339 production, 01:58 - 12:43 Sep 21st,
beam was bad, accelarator worked at about 50% efficiency
target=Ca40,shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
10:44, SHMS Q1 vacuum issiu. Beam stopped.
11:54, Beam came back but last for 10 minutes only then went away.

3340 production,13:07 Sep 21st - 12:03 Sep 22nd,
target=Ca40,shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,

3341 production,12:04 Sep 22nd - 23:35 Sep 22nd,
target=Ca40,shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,

3342 production,23:36 Sep 22nd - 15:21 Sep 23rd,
target=Ca40,shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
beam stopped due to vacuum issue at around 9:16.

3343 production,20:06 Sep 23rd -
target=Ca40,shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
daq crashed at 02:22 Sep 25th

Tunl11 lost mounting disk, vncserver can not start properly
3344 daq crashed, no data file

3345 productin, 21:02 Sep 25th - 03:51 Sep 26th
target=carbon, shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
daq rate 250Hz

target changed to B4C-10
3346 production, 03:59 - 11:18 Sep 26th
target=B4C-10, shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
beam stopped at ~05:45

3347 production, 11:20 Sep 26th - 20:34 Sep 27th, no beam until 20:12 Sep 26th.
target=B4C-10, shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
20:30 target changed to Ca48
target=Ca48,shms_p=-8.55,shms_theta=8.3,hms_p=1.82,hms_theta=48.33,
03:51 Sep 27th, target changed to Ca40
04:19 Sep 27th, target changed to Carbon
04:35 Sep 27th, target changed to Beryllium
05:12 Sep 27th, target changed to B4C-10
05:40 Sep 27th, target changed to B4C-11
06:00 Sep 27th, target changed to Beryllium
13:42 Sep 27th, target changed to B4C-10
beam stopped at 17:20, Sep 27th

3348 production, 20:51, Sep 27th - 15:27 Sep 28th, no beam until 02:49 Sep 28th.
22:18 Sep 27th, target changed to B4C-11
target=B4C-11, shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4,
09:59 Sep 28th, target changed to B4C-10
14:35 Sep 28th, target changed to Beryllium

3349 production, 15:28, Sep 28th - 10:40 Sep 29th, no beam until 20:12 Sep 26th.
target=Beryllium, shms_p=-8.55,shms_theta=8.3,hms_p=1.325,hms_theta=66.4, rate=500Hz
18:51 target changed to Loop 1 LD2
20:20 target changed to Fe
beam stopped at 7:00 Sep 29th.

TS#3 enabled, which is ShowerSum

3350 trash, daq test

18:14 SHMS rotated to 26deg

3351 pedestal, 18:21 - 18:27 Sep 29th, no beam

3352 production, 18:28 Sep 29th - 22:32 Oct 1st, no beam until 22:34
23:04 Sep 29th, target changed to Carbon hole
target=Carbon Hole, shms_p=-4.935,shms_theta=26.02,hms_p=6.476,hms_theta=20.69,
23:30 Sep 29th, beam stopped
23:31 Sep 29th, target changed to Loop 2 LH2
10:04 Oct 1st, tune beam came back
target=LH2, shms_p=-4.935,shms_theta=26.02,hms_p=6.476,hms_theta=20.69,
15:38 Oct 1st, target changed to Caron
15:57 Oct 1st, Target changed to LH2
17:01 Oct 1st, SHMS at 9.24 deg and HMS at 29.39 deg
target=LH2, shms_p=-8,shms_theta=9.24,hms_p=4.17,hms_theta=29.41,
daq crashed at 18:34
20:28 Oct 1st, SHMS rotated to 10.77, HMS to 31.73
shms_p=-8,shms_theta=10.77,hms_p=3.76,hms_theta=31.73,

subrun 00-01:  SHMS=26, Carbon hole + LH2
subrun 02-23: SHMS=26deg, LH2
subrun 24: SHMS=26deg, LH2 + carbon target
subrun 25: SHMS=26deg, Carbon
subrun 26: SHMS=26deg, carbon + SHMS=9.24deg LH2 target
subrun 27-42: shms_theta=9.24, LH2

3353 production, 22:35 Oct 1st - 23:01 Oct 1st, daq crashed at about 22:55
target=LH2, shms_p=-8,shms_theta=10.77,hms_p=3.76,hms_theta=31.73,
22:38 Oct 1st, SHMS rotated to 16.55, HMS to 29.4
target=LH2, shms_p=-8,shms_theta=16.55,hms_p=4.17,hms_theta=29.4, daq rate=7kHz

3354 production, 23:02 Oct 1st - 23:40 OCt 1st,
target=LH2, shms_p=-8,shms_theta=16.55,hms_p=4.17,hms_theta=29.4, daq rate=7kHz
23:25 target changed to dummy
target=dummy, shms_p=-8,shms_theta=16.55,hms_p=4.17,hms_theta=29.4, daq rate=6.7kHz

TS#3 prescale factor set to 10

3355 production, 23:42 Oct 1st - 20:43 Oct 2nd
target=dummy, shms_p=-8,shms_theta=16.55,hms_p=4.17,hms_theta=29.4, daq rate=2.4kHz
23:55 Oct 1st, SHMS rotated to 15.09deg
00:15 Oct 2nd, target change to LH2
target=LH2,shms_p=-8,shms_theta=15.09,hms_p=3.77,hms_theta=31.72,
00:51 Oct 2nd, SHMS rotated to 13.67deg
01:07 Oct 2nd, target change to dummy
target=dummy,shms_p=-8,shms_theta=13.67,hms_p=3.35,hms_theta=34.36,
01:37 Oct 2nd, SHMS rotated to 12.24deg
target=dummy,shms_p=-8,shms_theta=12.24,hms_p=2.94,hms_theta=37.37,
02:08 Oct 2nd,target changed to LH2
02:25 Oct 2nd, SHMS rotated to 10.78deg
target=LH2,shms_p=-8,shms_theta=10.78,hms_p=2.51,hms_theta=40.97,
02:57 Oct 2nd,target changed to dummy
03:25 Oct 2nd, SHMS rotated to 9.25deg
target=dummy,shms_p=-8,shms_theta=9.25,hms_p=2.08,hms_theta=45.36,
03:42 Oct 2nd,target changed to LH2
04:30 Oct 2nd, SHMS rotated to 26.02deg
target=LH2,shms_p=-4.935,shms_theta=26.02,hms_p=6.476,hms_theta=19.55,
12:29 Oct 2nd,target changed to dummy
13:30 Oct 2nd, SHMS rotated to 20.02deg
target=dummy,shms_p=-6.286,shms_theta=20.02,hms_p=5.107,hms_theta=24.91,
14:02 Oct 2nd,target changed to LH2
15:30 Oct 2nd, SHMS rotated to 15.01deg
target=LH2,shms_p=-7.626,shms_theta=15.01,hms_p=3.738,hms_theta=31.89,
16:05 Oct 2nd,target changed to dummy
16:30 Oct 2nd, SHMS rotated to 10.02deg
target=dummy,shms_p=-9.005,shms_theta=10.02,hms_p=2.289,hms_theta=43.13,
17:55 Oct 2nd,target changed to LH2
18:40 Oct 2nd, SHMS rotated to 10.02deg
target=LH2,shms_p=-9.2,shms_theta=9.26,hms_p=2.076,hms_theta=45.39,
19:05 Oct 2nd,target changed to dummy
19:35 Oct 2nd, SHMS rotated to 7.995deg
target=dummy,shms_p=-9.502,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,
21:30 Oct 2nd,target changed to LH2
21:54 Oct 2nd,SJMS sieve in
22:18 Oct 2nd,target changed to Beryllium,
target=Be,SHMS Sieve Slit in,shms_p=-9.502,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,

3356 production, 20:44 Oct 2nd - 17:05 Oct 3rd
target=dummy, shms_p=-9.502,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,
22:52 Oct 2nd,target changed to LH2
target=LH2,SHMS Sieve Slit in,shms_p=-9.502,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,
23:28 Oct 2nd,target changed to dummy, SHMS sieve still in
target=dummy,SHMS Sieve Slit in,shms_p=-9.502,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,
23:45 Oct 2nd, SHMS momentum set to -8.55
00:08 Oct 3rd,target changed to LH2
target=LH2,SHMS Sieve Slit in,shms_p=-8.55,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,

00:49 Oct 3rd,target changed to Beryllium,
target=Beryllium,SHMS Sieve Slit in,shms_p=-8.55,shms_theta=7.995,hms_p=1.739,hms_theta=49.53,
01:28 Oct 3rd,target changed to LH2
01:42 roated SHMS and HMS. Spectrometer Emergency Stop Detected, Hall is open for trouble shooting.
beam stopped from 1:38.
Accelerator can not deliver beam since 04:10 Oct 3rd
SHMS roated to 20.02deg, HMS to 20deg

3357 production, 18:20 Oct 3rd - 12:14 Oct 4th
23:45 Oct 3rd, tune beam
target=LH2,shms_p=-4,shms_theta=20.02,hms_p=-4,hms_theta=20.0,
01:05 SHMS and HMS rotated to 25deg
target=LH2,shms_p=-3.5,shms_theta=25.02,hms_p=-3.5,hms_theta=25.0,
03:22 SHMS and HMS rotated to 25deg
target=LH2,shms_p=-2.5,shms_theta=35.02,hms_p=-2.5,hms_theta=35.0,
05:27 change momentum to 1.24GeV SHMS
target=LH2,shms_p=-1.24,shms_theta=35.02,hms_p=-2.5,hms_theta=35.0,
08:19 SHMS rotated to 8 deg, momentum is set to -9.2GeV
08:45 target changed to LD2
target=LD2,shms_p=-9.2,shms_theta=8,hms_p=-2.5,hms_theta=35.0,
08:45 target changed to C12
target=Carbon,shms_p=-9.2,shms_theta=8,hms_p=-2.5,hms_theta=35.0,

10:40 Beam is off

3358 cosmic, 13:30 Oct 4th - 13:40 Oct 5th, no beam for the whole run

3359 cosmic, 13:42 Oct 5th - 13:49 Oct 6th, no beam for the whole run

3360 cosmic, 13:51 Oct 6th - 15:24 Oct 6th, no beam for the whole run

change TS#3 prescale factor to 1

3361 cosmic, 15:26 Oct 6th - 17:45 Oct 6th, no beam for the whole run

enable TS#4, which is VME DSC ELC output ch4

3362 production, 17:47 Oct 6th - 01:02 Oct 10th, no beam until 04:09 Oct 9th

beam stopped at 19:05 Oct 9th

3363 production, 01:02 Oct 10th - 18:23 Oct 10th

3364 production, 18:24 Oct 10th - 14:52 Oct 11th
daq rate 6.4kHz
daq crashed at 06:07 Oct 11th

3365 production, 14:54 Oct 11th - 20:56 Oct 11th

3366 production, 20:58 Oct 11th - ? Oct 12th

daq rate 6.7kHz

Updated by Jixie Zhang over 1 year ago · 5 revisions