1. Runlist 

 beam hit the edge of top Ecal 
 New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100 
 Run      
 777    First run - MWPC trigger -  

 New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000 
 783 Preshower channels set to 2V range in FADC 

 784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals 
 785 
 New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000  
 786 TS1 only - beam centered on calorimeter 

 New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900 
 787 lower HV on preshower 

 788 

 792 

 reduce 100 V more on preshower 

 793 short run PEB1 crashed 

 switch to FADC only config TiIntelvmeha8 

 795  

 Changing down stream Cerenkov N2 pressure 

 796 move to     Top block  


 800 beam on the center of the top left block, point A B 
 801 
 802 beam on the center of the right block, point C 

 803 beam on the center of the left top block, point A 

 804 beam on the center of 3 modules, 6.5k modules 

 805 2GeV, beam on the center of 3 modules, 31.7k 

 806 4GeV, beam on the center of 3 modules, modules