| 1 | 8 | Jixie Zhang | 1. Runlist |
|---|---|---|---|
| 2 | 1 | Alexandre Camsonne | |
| 3 | 8 | Jixie Zhang | beam hit the edge of top Ecal |
| 4 | New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100 |
||
| 5 | 1 | Alexandre Camsonne | Run |
| 6 | 777 First run - MWPC trigger - |
||
| 7 | |||
| 8 | 8 | Jixie Zhang | New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000 |
| 9 | 783 Preshower channels set to 2V range in FADC |
||
| 10 | 5 | Alexandre Camsonne | |
| 11 | 8 | Jixie Zhang | 784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals |
| 12 | 785 |
||
| 13 | New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000 |
||
| 14 | 7 | Alexandre Camsonne | 786 TS1 only - beam centered on calorimeter |
| 15 | |||
| 16 | 8 | Jixie Zhang | New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900 |
| 17 | 787 lower HV on preshower |
||
| 18 | 9 | Alexandre Camsonne | |
| 19 | 788 |
||
| 20 | |||
| 21 | 792 |
||
| 22 | 10 | Alexandre Camsonne | |
| 23 | reduce 100 V more on preshower |
||
| 24 | 11 | Alexandre Camsonne | |
| 25 | 12 | Alexandre Camsonne | 793 short run PEB1 crashed |
| 26 | |||
| 27 | switch to FADC only config TiIntelvmeha8 |
||
| 28 | |||
| 29 | 795 |
||
| 30 | 13 | Alexandre Camsonne | |
| 31 | 15 | Alexandre Camsonne | Changing down stream Cerenkov N2 pressure |
| 32 | 13 | Alexandre Camsonne | |
| 33 | 16 | Alexandre Camsonne | 796 move to Top block |
| 34 | 15 | Alexandre Camsonne | |
| 35 | |||
| 36 | 16 | Alexandre Camsonne | 800 beam on the center of the top block, point A |
| 37 | 15 | Alexandre Camsonne | 801 |
| 38 | 802 beam on the center of the right block, point C |
||
| 39 | |||
| 40 | 16 | Alexandre Camsonne | 803 beam on the center of the left block, point A |
| 41 | 1 | Alexandre Camsonne | |
| 42 | 16 | Alexandre Camsonne | 804 beam on the center of 3 modules, 6.5k |
| 43 | 15 | Alexandre Camsonne | |
| 44 | 16 | Alexandre Camsonne | 805 2GeV, beam on the center of 3 modules, 31.7k |
| 45 | |||
| 46 | 806 4GeV, beam on the center of 3 modules, |
||
| 47 | 17 | David Flay | |
| 48 | 818 12 GeV e- |
||
| 49 | 819 12 GeV e- |
||
| 50 | 820 10 GeV e- |
||
| 51 | 821 8 GeV e- |
||
| 52 | 822 6 GeV e- |