Project

General

Profile

Runlist » History » Revision 24

Revision 23 (Jixie Zhang, 01/16/2021 11:34 AM) → Revision 24/80 (David Flay, 01/16/2021 10:58 PM)

1. Runlist 

 beam hit the edge of top Ecal 
 New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100 
 Run      
 777    First run - MWPC trigger -  

 New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000 
 783 Preshower channels set to 2V range in FADC 

 784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals 
 785 
 New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000  
 786 TS1 only - beam centered on calorimeter 

 New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900 
 787 lower HV on preshower 

 788 

 792 

 reduce 100 V more on preshower 

 793 short run PEB1 crashed 

 switch to FADC only config TiIntelvmeha8 

 795  

 Changing down stream Cerenkov N2 pressure 

 796 move to Top block  


 800 beam on the center of the top block, point A 
 801 
 802 beam on the center of the right block, point C 

 803 beam on the center of the left block, point A 

 804 beam on the center of 3 modules, 6.5k 

 805 2GeV, beam on the center of 3 modules, 31.7k 

 806 4GeV, beam on the center of 3 modules, 

 818 12 GeV e-  
 819 12 GeV e-  
 820 10 GeV e-  
 821 8 GeV e- 
 822 6 GeV e-  

 ===========1GeV=================== 
 HV is: 1260, 1280, 760, 860, 880, 1640, 1480, 1800 
 823 
 824 
 825 
 Switch to TS2 trigger 

 828  

 Switch back to TS1 

 831  

 839    daq crashed 

 847 1 GeV 
 848 6 GeV 
 849 6 GeV 
 850 6 GeV 
 851 6 GeV