Runlist » History » Revision 26
« Previous |
Revision 26/80
(diff)
| Next »
Jixie Zhang, 01/17/2021 09:30 PM
1. Runlist
beam hit the edge of top Ecal
New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100
Run
777 First run - MWPC trigger -
New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000
783 Preshower channels set to 2V range in FADC
784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals
785
New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000
786 TS1 only - beam centered on calorimeter
New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900
787 lower HV on preshower
788
792
reduce 100 V more on preshower
793 short run PEB1 crashed
switch to FADC only config TiIntelvmeha8
795
Changing down stream Cerenkov N2 pressure
796 move to Top block
800 beam on the center of the top block, point A
801
802 beam on the center of the right block, point C
803 beam on the center of the left block, point A
804 beam on the center of 3 modules, 6.5k
805 2GeV, beam on the center of 3 modules, 31.7k
806 4GeV, beam on the center of 3 modules,
818 12 GeV e-
819 12 GeV e-
820 10 GeV e-
821 8 GeV e-
822 6 GeV e-
===========1GeV===================
HV is: 1260, 1280, 760, 860, 880, 1640, 1480, 1800
823
824
825
Switch to TS2 trigger
828
Switch back to TS1
831
839 daq crashed
847 1 GeV
===========6GeV===================
848 6 GeV
849 6 GeV
850 6 GeV
851 6 GeV
858 bad run
===========16GeV===================
862, ecal HV is using 8GeV setting: 760, 860, 880 bad run, all saturated
863, change ecal HV: 720, 820. 840, bad run, all saturated
864 bad run, all saturated
865, change ecal HV: 700 780,800 bad run, sdu#5 saturated
866 bad run, sdu#5 saturated
===========12GeV===================
867
868
869
870 motion table moved to (1429,315)
871
872 motion table moved to (1452,315)
873
874
875 motion table moved to (1461,315)
876
877 motion table moved to (1451,315)
Updated by Jixie Zhang almost 4 years ago · 26 revisions