Runlist » History » Revision 9
Revision 8 (Jixie Zhang, 01/14/2021 10:22 PM) → Revision 9/80 (Alexandre Camsonne, 01/14/2021 10:25 PM)
1. Runlist beam hit the edge of top Ecal New HV is: 1260, 1300, 920, 960, 940, 1940, 1780, 2100 Run 777 First run - MWPC trigger - New HV is: 1260, 1300, 920, 960, 940, 1840, 1680, 2000 783 Preshower channels set to 2V range in FADC 784 TS1 and TS2 - move detector position so beam is hitting the center of three ECals 785 New HV is: 1160, 1200, 820, 860, 840, 1840, 1680, 2000 786 TS1 only - beam centered on calorimeter New HV is: 1260, 1300, 820, 860, 840, 1740, 1580, 1900 787 lower HV on preshower 788 792