January 8th 2026 » History » Revision 2
Revision 1 (Alexandre Camsonne, 01/08/2026 01:17 PM) → Revision 2/3 (Alexandre Camsonne, 01/08/2026 01:22 PM)
h1. January 8th 2026 * Updates ESB ** Network pulled and put switch should have network 196 ** GEM *** booted MPD crate *** tried to boot VTP crate, issue with controller *** Ching can pull out extension cable from SBS, can give extension *** 2 payload boars for up to 8 MPDs *** 9 MPDs in crate *** can setup SBS backplane with one or a few APVs to take pedestals and test software *** Zhiwen gave github to previous GEM software, need to discuss and figure out what decoders are needed *** VMM : use ethernet readout and might use long cables as back up for supply *** need to check for power supply for VMM, need to check if we can use electronics group one or use the MPOD. *** Harsh getting started with VMM readout *** 30 m HDMI found if needed : need to check how many - 10 m x 20 ** ECal *** Zhongling moved boards to crate, just need to hook up network and boot the crate *** he will move the computer to the test area **MRPC *** moved cables on table near other racks *** Sanghwa started installing software for NALU chips on laptop ** HV *** need to get some up and controls *** Lecroy *** MPOD bring crate and set up - start with web interface *** CAEN crate *** controls EPICS * To do list : ** network *** check with network people if we can have dedicated fiber **check in Hall : electronics rack location and network connection * ECal electronics for Zhihong ** FADC, SD, TI , VTP, old VME CPU - need to check all working before shipping ** CAEN controller : will try to run with CODA * Test stand detector group ** will meet detector group at 2 :30 to setup FADC for PMTs LED tests