h1. January 8th 2026 
 * Updates ESB 
 ** Network pulled and put switch should have network 196  
 ** GEM 
 *** booted MPD crate 
 *** tried to boot VTP crate, issue with controller  
 *** Ching can pull out extension cable from SBS, can give extension 
 *** 2 payload boars for up to 8 MPDs 
 *** 9 MPDs in crate 
 *** can setup SBS backplane with one or a few APVs to take pedestals and test software 
 *** Zhiwen gave github to previous GEM software, need to discuss and figure out what decoders are needed 
 *** VMM : use ethernet readout and might use long cables as back up for supply 
 *** need to check for power supply for VMM, need to check if we can use electronics group one or use the MPOD. 
 *** Harsh getting started with VMM readout 
 *** 30 m HDMI found if needed : need to check how many - 10 m x 20 
 ** ECal 
 *** Zhongling moved boards to crate, just need to hook up    network and boot the crate 
 *** he will move the computer to the test area 
 **MRPC 
 *** moved cables on table near other racks 
 *** Sanghwa started installing software for NALU chips on laptop 
 ** HV 
 *** need to get some up and controls 
 *** Lecroy  
 *** MPOD bring crate and set up - start with web interface 
 *** CAEN crate  
 *** controls EPICS 

 * To do list : 
 ** network 
 *** check with network people if we can have dedicated fiber 
 **check in Hall : electronics rack location and network connection 

 * ECal electronics for Zhihong 
 ** FADC, SD, TI , VTP, old VME CPU - need to check all working before shipping 
 ** CAEN controller : will try to run with CODA 

 * Test stand detector group  
 ** will meet detector group at 2 :30 to setup FADC for PMTs LED tests