Actions
May 21th 2026
*Updates
- GEM
- uRGroove, held HV overnight, seems better than at lab. Bottle 2000 psi, leak in system - need more N2 -
- Miss one 2 slots backplane, can get from electronics group ( 4 ) , need 2 more adapters from Kondo
- if leak fixed can do cosmics and source
- miss one GEM from UVA
- Ibrahim will sign off on different gas system for MRPC, Cerenkov...
- uRWell and uRGroove don't have resistor, high current at beginning, need to ramp slowly - need procedure to power the detector ( order matters )
- could make a script to ramp HV
- might try VMM next week
- DAQ
- tried to get two crates working, need to update TI library and try again
- will test 2 crates separate with FADC and GEM DAQ
- Hall C : FADC is setup , need to setup vfTDC and GEMs
- will set up ESB later
-
**ECAL
- cosmics calibration and large angle in Hall C
- holder for cosmics - maybe Michael can help
**Cerenkov
- need calibration
- setup
MRPC
*Gas in Hall A
- need N2 to flush
- making adapter for NINO
- still need setup waveform sampler and SAMPIC
**Installation June 1st - 2 weeks
- uRGroove, held HV overnight, seems better than at lab. Bottle 2000 psi, leak in system - need more N2 -
- Miss one 2 slots backplane, can get from electronics group ( 4 ) , need 2 more adapters from Kondo
- if leak fixed can do cosmics and source
- miss one GEM from UVA
- Ibrahim will sign off on different gas system for MRPC, Cerenkov...
- uRWell and uRGroove don't have resistor, high current at beginning, need to ramp slowly - need procedure to power the detector ( order matters )
- could make a script to ramp HV
- might try VMM next week
- tried to get two crates working, need to update TI library and try again
- will test 2 crates separate with FADC and GEM DAQ
- Hall C : FADC is setup , need to setup vfTDC and GEMs
- will set up ESB later
-
**ECAL - cosmics calibration and large angle in Hall C
- holder for cosmics - maybe Michael can help
**Cerenkov - need calibration
- setup
MRPC
*Gas in Hall A - need N2 to flush
- making adapter for NINO
- still need setup waveform sampler and SAMPIC
**Installation June 1st - 2 weeks
Updated by Alexandre Camsonne 3 days ago · 1 revisions