May 21th 2026
*Updates
  • GEM
    • uRGroove, held HV overnight, seems better than at lab. Bottle 2000 psi, leak in system - need more N2 -
    • Miss one 2 slots backplane, can get from electronics group ( 4 ) , need 2 more adapters from Kondo
    • if leak fixed can do cosmics and source
    • miss one GEM from UVA
    • Ibrahim will sign off on different gas system for MRPC, Cerenkov...
    • uRWell and uRGroove don't have resistor, high current at beginning, need to ramp slowly - need procedure to power the detector ( order matters )
    • could make a script to ramp HV
    • might try VMM next week
  • DAQ
    • tried to get two crates working, need to update TI library and try again
    • will test 2 crates separate with FADC and GEM DAQ
    • Hall C : FADC is setup , need to setup vfTDC and GEMs
    • will set up ESB later

    • **ECAL
    • cosmics calibration and large angle in Hall C
    • holder for cosmics - maybe Michael can help
      **Cerenkov
    • need calibration
    • setup
      MRPC
      *Gas in Hall A
    • need N2 to flush
    • making adapter for NINO
    • still need setup waveform sampler and SAMPIC
      **Installation June 1st - 2 weeks