May 7th 2026 » History » Revision 2
Revision 1 (Alexandre Camsonne, 05/07/2026 01:23 PM) → Revision 2/3 (Alexandre Camsonne, 05/07/2026 01:24 PM)
h1. May 7th 2026 *Updates * May 25th going in - 2 weeks ** 1 UVA 2 Hall B GEM, Cerenkov, Ecal, Sctinillatorrs, 3 Hall B uRWell, uRwell UVA , uRGroove - ** *Run plan ** what we need to do at beginning ** what needs to be measured **GEM *** need set up cosmics setup *** Can we test all MPGDs at same time ? *** test GEM one by one *** trigger : cosmics trigger *** add small scintillator for effciency *** plateau scan ? *** make stand to take cosmics with most or all of MPGDs - use actual stand and put veritcal maybe *** all APVs, MPDs , need one slot backplane only for uRGroove and uRWell *** need config with both ADC and GEM **PMTs ***put 1 scinitillor - can take data, need to figure latency. *** copied simple decoder but need to adjust windows **Software *** start with simple decoder *** all SBS online installed in container with Penguin and Podd **Counting house *** setup CODA on solidpc2 *** basic config with TI in Hall C *** prepare FADC and GEM