Project

General

Profile

Kaon LT Meetings » mtg_23sep07.txt

Garth Huber, 09/08/2023 05:32 PM

 
1
                 Sept 7/23 PionLT/KaonLT Analysis Meeting Notes
2
                 ----------------------------------------------
3
                              (Notes by GH & AH)
4

    
5
                     Today: KaonLT will be discussed first
6

    
7
Please remember to post your slides at:
8
https://redmine.jlab.org/projects/kltexp/wiki/Kaon_LT_Meetings
9

    
10
Present
11
-------
12
Regina - Garth Huber, Nathan Heinrich, Abdennacer Hamdi, Vijay Kumar, Alicia
13
   Postuma
14
CSULA - Konrad Aniol
15
CUA - Richard Trotta, Tanja Horn
16
JLab - Dave Gaskell
17

    
18
Vijay Updates
19
-------------
20
Continuation of SHMS Hodoscope vs. Run number and vs. trigger rate studies
21
- hodoscope 4 has much lower efficiencies than the other planes
22
- most 3/4 planes have efficiency greater than 97% 
23
- Garth: check the drop of efficient with respect to momentum (especially at
24
  low momentum)
25

    
26
Next steps
27
- luminosity study, has started working on scripts
28

    
29
Richard Updates
30
---------------
31
Luminosity scan follow-up from last week
32
- relative yields vs current looks flatter for Carbon than LH2 
33
- doing weighted linear fits now (including error bars)
34
- Carbon Normalized Yield vs Current:
35
  (0.17% +/- 4.3%)/100uA
36
- LH2 Normalized Yield vs Current:
37
  (7.90% +/- 1.8%)/100uA
38
- discussion on "linear regression plots of boiling factor vs current"
39
  - these gave different results, but we think that's due to a
40
    misinterpretation of the text in CarlosY's thesis
41
- concluded that the boiling in Carbon is negligible, and no additional
42
  corrections to the data are required
43
- the 7.9%/100uA factor above should be applied to LH2 data on a run-by-run
44
  basis, depending on the average current for each run
45
  - errors in the boiling factor will also have to be propagated, including
46
    also the uncertainty in the BCM calibration
47

    
48
Kinematic plots per t-bin
49
- Fortran average kin script is working now
50

    
51
Nathan Updates
52
--------------
53
Hodoscope calibrations
54
- we thought they were done, but apparently Jacob never pushed his calibs to
55
  GitHub, so all of the other detector calibrations done to date used online
56
  hodo calib parameters
57
- not only will the hodoscope calibrations have to be done/re-checked, but this
58
  also means (unfortunately) that other detectors (particularly drift chambers)
59
  will have to be rechecked
60
- although a setback, it's good this was caught before we got too much further
61
  in the analysis!
62

    
63
- located Jacob's scripts and calib files in his working area on the ifarm
64
  - SHMS hodo calibs are running now
65
  - HMS: fighting some script issues
66
- hoping that 3 time-walk calibs, a new one each time the hodoscopes were
67
  turned off, will be sufficient
68
- VP calib will be done once per beam energy (not sure what VP stands for,
69
  though)
70

    
71
NPS Run Coordinator duties
72
- Nathan will do Jan 31-Feb 7/2024
73

    
74
Alicia Updates
75
--------------
76
Q2-dependence of sigma_LT'/sigma_0 at fixed xB=0.415, 0.245
77
- displayed next to CLAS-6,12 data
78
- raw data only, no scaling applied to constant t or xB
79
- Q2-dependence at each xB looks fairly flat within scatter of data
80
- probably need to do a t-interpolation of data to a fixed value (right now
81
  just have data within a specific t-range)
82

    
83
- Alicia: It would be nice to have a model to compare the data to, will run
84
  PARTONS
85

    
86
Garth Offset Studies
87
--------------------
88
Out-of-Plane
89
- following procedure on pages 105-106 of Tanja's thesis
90
- obtained BPM-y and SHMS,HMS Matrix Element info from Richard to compute phi
91
  offsets
92
- out-of-plane study reveals large out of plane offsets, probably unphysical
93
- DaveG suggests to check the reverse of the Y-axis, i.e. Pp/Pe instead of
94
  Pe/Pp, as the figure in the thesis might be mis-labeled
95

    
96
In-Plane
97
- received preliminary info from Richard for 6191, 8209, 10585 MeV Heep Coin
98
  data
99
- tried a global fit of in-plane offsets for 8 beam energies, and compared
100
  results to last week's fit for 5 beam energies
101
- angle and momenta offsets are generally comparable, although residuals are
102
  significantly larger for some higher beam energy data
103
- probably have to let HMS momentum offset float for settings where P>5 GeV/c
104
- waiting for Richard final data before continuing study of in-plane offsets
105

    
106
Next Meeting
107
------------
108
- NOTE THE NEW TIME AND ZOOM CONNECTION INFO!
109
- Tues Sept 12 @ 15:00 Eastern/13:00 Regina/12:00 Pacific
110
- PionLT will go first
111

    
112
- we will use this time until the end of October, when USA goes off daylight
113
  savings time
114
- until then, we have to be sure to let Nathan to go earlier, as he has to
115
  leave for TA work no later than 14:15 Regina time
116

    
117

    
(285-285/513)