Project

General

Profile

Actions

Task #1133

open

Slow Controls

Added by Ole Hansen 4 months ago. Updated 17 days ago.

Status:
In Progress
Priority:
Normal
Assignee:
-
Category:
Slow Controls
Start date:
09/02/2025
Due date:
% Done:

20%

Estimated time:
(Total: 0.00 h)
Responsible:

Description

Set up and configure the MOLLER slow controls.

As much as possible, controls should be based on Control System Studio, although there will be some vendor-specific or proprietary components as well.


Subtasks 6 (6 open0 closed)

Task #1134: High-voltage controlsNew09/02/2025

Actions
Task #1136: Low-voltage controlsIn Progress01/15/2026

Actions
Task #1145: Display/GUIsIn ProgressSanghwa Park01/15/2026

Actions
Task #1152: US/DS scanner motion controlIn Progress01/15/2026

Actions
Task #1167: Shower Max screensIn ProgressSanghwa Park02/05/2026

Actions
Task #1216: Main Detector screensIn ProgressSanghwa Park01/15/2026

Actions
Actions #1

Updated by Sanghwa Park 24 days ago

  • Status changed from New to In Progress
Actions

Also available in: Atom PDF