Project

General

Profile

Actions

Task #1133

open

Slow Controls

Added by Ole Hansen 1 day ago. Updated 1 day ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Slow Controls
Start date:
09/02/2025
Due date:
% Done:

0%

Estimated time:
(Total: 0.00 h)
Responsible:

Description

Set up and configure the MOLLER slow controls.

As much as possible, controls should be based on Control System Studio, although there will be some vendor-specific or proprietary components as well.


Subtasks 2 (2 open0 closed)

Task #1134: High-voltage controlsNew09/02/2025

Actions
Task #1136: Low-voltage controlsNew09/02/2025

Actions

No data to display

Actions

Also available in: Atom PDF