Project

General

Profile

Actions

Task #1161

open

HES HODO Frame broken - wood branch supports top side

Added by Kotaro Nishi 6 days ago. Updated about 22 hours ago.

Status:
New
Priority:
Normal
Assignee:
-
Start date:
01/30/2026
Due date:
% Done:

20%

Estimated time:

Description

One of HES HODO frame bolts are missing (HES ch30-58 frame's TOP side)
Temporary, wood branch supports instead of this lost bolt.
We don't know why this branch was used.


Files

Wood.jpg (3.05 MB) Wood.jpg Kotaro Nishi, 01/30/2026 09:38 PM
Wood2.jpg (3.18 MB) Wood2.jpg Kotaro Nishi, 01/30/2026 09:38 PM
Wood4.jpg (4.05 MB) Wood4.jpg Kotaro Nishi, 01/30/2026 09:39 PM
Wood3.jpg (4.74 MB) Wood3.jpg Kotaro Nishi, 01/30/2026 09:39 PM
IMG20260202101414.jpg (2.65 MB) IMG20260202101414.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202101328.jpg (3.67 MB) IMG20260202101328.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202101321.jpg (3.25 MB) IMG20260202101321.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202101316.jpg (3.96 MB) IMG20260202101316.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202101312.jpg (4.03 MB) IMG20260202101312.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202101306.jpg (3.62 MB) IMG20260202101306.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202101301.jpg (3.94 MB) IMG20260202101301.jpg Kotaro Nishi, 02/02/2026 10:24 AM
IMG20260202100933.jpg (3.16 MB) IMG20260202100933.jpg Kotaro Nishi, 02/02/2026 10:24 AM
Actions #1

Updated by Kotaro Nishi 4 days ago

Confirmed a sheared bolt is embedded in the hole.

​Located the bolt head and confirmed it is made of a lightweight, plastic-like material.

​The component is currently secured by a bolt on the left and a cable tie (zip tie) on the right.

Actions #2

Updated by Kotaro Nishi about 22 hours ago

  • Priority changed from High to Normal

Bill will solve this problem with engineering group

Actions

Also available in: Atom PDF