General

Profile

Kotaro Nishi

  • Login: nishi
  • Registered on: 05/22/2025
  • Last connection: 02/06/2026

Issues

open closed Total
Assigned issues 6 0 6
Reported issues 12 0 12

Projects

Project Roles Registered on
Hypernuclear Developer, Reporter 05/22/2025
Enge SciFi Manager, Developer, Reporter 05/22/2025
HES DC Developer, Reporter 06/19/2025
HES Hodo Manager, Developer, Reporter 07/03/2025
HKS DAQ Manager, Developer, Reporter 05/22/2025
HKS DC Developer, Reporter 06/19/2025
HKS Hodo Manager, Developer, Reporter 07/03/2025
HKS WC Developer, Reporter 05/22/2025
HYP Software Developer, Reporter 05/22/2025
Hypernuclear ERR Developer, Reporter 05/22/2025
MRPC for hypernucler Developer, Reporter 05/22/2025

Activity

02/05/2026

11:12 AM HES Hodo Task #1158: Paddle end is fogged
Bill prepared sandpaper(#600).
Finer sandpapers should be ordered
Kotaro Nishi
11:10 AM HES Hodo Task #1160: HES HODO's cables (HV & Signal) repariment
Heat shrink cabling doesn't work.
Bill will ask electronics group for new connectors
Kotaro Nishi
11:09 AM HES Hodo Task #1161: HES HODO Frame broken - wood branch supports top side
Bill will solve this problem with engineering group Kotaro Nishi
11:08 AM HKS Hodo Task #1165: Where is KTOF2Y
KTOF2Y is low priority Kotaro Nishi

02/02/2026

10:24 AM HES Hodo Task #1161: HES HODO Frame broken - wood branch supports top side
Confirmed a sheared bolt is embedded in the hole.
​Located the bolt head and confirmed it is made of a lightweight...
Kotaro Nishi

01/30/2026

09:53 PM HKS Hodo Task #1165 (New): Where is KTOF2Y
KTOF1X, KTOF1Y, KTOF1Y are attached HKS detector frame, but KTOF2Y is not.
We couldn't find in ESB
Kotaro Nishi
09:49 PM HKS Hodo Task #1164 (New): HKS HODO noise chcek
PMTs to be checked if they work.
equipment : HV, oscilloscope
1. Apply high voltage
1. check noise level
H19...
Kotaro Nishi
09:45 PM HKS Hodo Task #1163 (New): HKS HODO noise chcek
PMTs to be checked if they work.
equipment : HV, oscilloscope
1. Apply high voltage
1. check noise level
H19...
Kotaro Nishi
09:42 PM HKS Hodo Task #1162 (New): HKS HODO Signal Check
HKS HODO PMT to be checked
1. Noise check
1. Gain check w/ beta ray
1. Time resolution measurement
Kotaro Nishi
09:40 PM HES Hodo Task #1161 (New): HES HODO Frame broken - wood branch supports top side
One of HES HODO frame bolts are missing (HES ch30-58 frame's TOP side)
Temporary, wood branch supports instead of th...
Kotaro Nishi

Also available in: Atom