Actions
Task #997
openHodoscope Work at ESB
Start date:
01/08/2024
Due date:
04/26/2024 (about 8 months late)
% Done:
75%
Estimated time:
(Total: 0.00 h)
Description
This task is related to the work with the Hodoscope at ESB.
- Removal of old optic fiber.
- Put the new optic fibers, check the correct insertion and correct seal.
- General light leaks in the bar
- Repair of bases and/or PMT
| Google Spreadsheet with the initial measurements and notes of the Hodoscope bars:
[[https://docs.google.com/spreadsheets/d/1ZKLQpRagKJ3NGMwvuQWdbJQbCXs2F1Va3W5cB2rOOBs/edit#gid=497431134 ]]
Actions