2019 Run Plans and Run Sheets » History » Revision 22
Revision 21 (Garth Huber, 07/13/2019 02:22 PM) → Revision 22/37 (Vijay Kumar, 07/18/2019 02:34 PM)
h1. Run Plans and Run Sheets
h2. Summer 2019 Run Period
* Blank Run Sheets
** New Configuration Sheet attachment:runsheet_pion.tgif.pdf
** Continuing Configuration Sheet attachment:runsheet2_pion.tgif.pdf
* Run Plans
** Run Plan Spread Sheet attachment:pion_lowEkin_runplan.ods
** Run Plan attachment:runplan_lowQ2.pdf
** SIMC Plots (low Q2 Fpi) attachment:tphi_lowQ2.pdf
** Scanned run plan (with shift worker and RC notes) attachment:runplan_xx_scan.pdf
* Run List
** Runlist CSV file attachment:pion_runlist_summer19.csv
** Standard kinematics
* Run Sheets
** 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) attachment:optics_2p7gev.pdf
** 2.7 GeV Run Sheets attachment:runsheets_2p7gev.pdf
** 3.6 GeV Run Sheets attachment:runsheets_3p6gev.pdf
** 4.5 GeV Run Sheets attachment:runsheets_4p5gev.pdf
h2. Later high energy running
* Beam pipe requirements attachment:beampipe_req.pdf