Actions
Summer 2019 Run Plans and Run Sheets¶
- Blank Run Sheets
- New Configuration Sheet runsheet_pion.tgif.pdf
- Continuing Configuration Sheet runsheet2_pion.tgif.pdf
- Run Plans
- Run Plan Spread Sheet pion_lowEkin_runplan.ods
- Run Plan runplan_lowQ2.pdf
- SIMC Plots (low Q2 Fpi) tphi_lowQ2.pdf
- Scanned run plan (with shift worker and RC notes) run_plan.pdf
- Run List
- Runlist CSV file pion_runlist_summer19.csv
- Standard kinematics standard.kinematics
- Run Sheets
- 2.7 GeV Optics, Trigger, BCM (while waiting for ESR repair) optics_2p7gev.pdf
- 2.7 GeV Run Sheets runsheets_2p7gev.pdf
- 3.6 GeV Run Sheets runsheets_3p6gev.pdf
- 4.5 GeV Run Sheets runsheets_4p5gev.pdf
Later high energy running¶
- Beam pipe requirements beampipe_req.pdf
Updated by Garth Huber over 3 years ago · 37 revisions